Search results

Jump to navigation Jump to search
  • Dev:Changes (category GeneralDescription)
    changes between the railML® 2 minor versions are available in the following descriptions: Changes between railML® 2.0 and railML® 2.1 Changes between railML®
    3 KB (403 words) - 15:46, 15 April 2024
  • Dev:Identities (category GeneralDescription)
    <name>, with attributes name and description. name: A short, human readable Identifier. Uniqueness is not required. description: Human readable text that gives
    5 KB (463 words) - 12:22, 3 November 2023
  • vehicle, vehiclePart, weightLimit, workZone Children None Attributes: description: description of the designator, which can be used to provide basic information
    518 bytes (58 words) - 12:39, 8 February 2024
  • complete bitmask it defines the bit position in the byte. @description – This is just the description/meaning of the command send. @normalState – This gives
    13 KB (1,119 words) - 17:46, 30 January 2020
  • Consequently, for balise based ATP systems, there are two levels of description: the higher level “balise group”, which is presented by the railML® element
    8 KB (900 words) - 17:31, 11 April 2024
  • <gmlLocations> <lineString> <description> <descriptionReference> <identifier> <name> <pos> <posList> <point> <description> <descriptionReference> <identifier>
    188 KB (2,767 words) - 13:38, 4 December 2023
  • tunnelGateIS, underCrossing, weightLimit Children None Attributes: description: description of the external identifier or reference, providing basic information
    516 bytes (58 words) - 12:39, 8 February 2024
  • isBasicSpeedProfile="true" mVersion="32"> <name name="ETCS Basic SSP" description="Basic ETCS static speed profile used by trains for which no Specific
    19 KB (2,085 words) - 21:02, 15 January 2024
  • Autoexport from the XML-Schema for element GML4RAILML:description of railML® version 3.2   Documentation deprecated This element is part of GML, version
    522 bytes (4 words) - 18:41, 19 December 2019
  • Autoexport from the XML-Schema for element GML4RAILML:descriptionReference of railML® version 3.2   Documentation gml:ReferenceType is intended to be used
    531 bytes (4 words) - 18:41, 19 December 2019
  • . UNISIG-baseline 3 is in use (mVersion="32"). Corresponding railML® description: <baliseGroups> <baliseGroup id="bg1" mileageDirection="nominal" coverage="none"
    19 KB (2,555 words) - 16:55, 18 January 2024
  • be tolerated due to running self-test. (optional; xs:duration), description: Description of the logic. (optional; xs:string), elementNumber: element number
    2 KB (218 words) - 19:17, 29 January 2020
  • format and language for the data to be exchanged. The aim of the use case description is to formulate requirements on the technical implementation of the data
    7 KB (287 words) - 15:43, 8 April 2024
  • release is indicated to the operator. (optional; xs:duration), description: Description of the logic. (optional; xs:string), elementNumber: element number
    4 KB (531 words) - 19:18, 29 January 2020
  • UC:Use case example (category GeneralDescription) (section Description / Beschreibung)
    detail is usually included. On what does this level of detail depend. This description is usually the starting point for the next level of determining a more
    2 KB (263 words) - 17:26, 5 February 2024
  • typicalNonPassableTime="P1D"> <rail3:designator description="" entry="" register=""/> <rail3:assetName description="" language="EN" name=""/> <rail3:belongsToOperationalPoint
    3 KB (405 words) - 15:00, 27 May 2022
  • ref: a reference to an external element (optional; xs:string), description: description of the external identifier or reference, providing basic information
    511 bytes (58 words) - 18:42, 19 December 2019
  • Dev:Semantic Constraints (category GeneralDescription)
    Element ID Proposal date Date of acception Date of deprecation Description <TT:operationalTrainSectionPart> TT:001 2022-09-15 2022-10-13 There is
    4 KB (579 words) - 16:49, 13 March 2023
  • schema! Subschema infrastructure Parents* gmlLocations Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (0..1)
    720 bytes (21 words) - 10:00, 23 April 2024
  • schema! Subschema infrastructure Parents* gmlLocations Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (1..1)
    709 bytes (21 words) - 09:59, 23 April 2024
  • railML® version 3.2 UML-visualization of generic Documentation name and description of the asset dependent on the language Subschema generic Parents* derailerIL
    517 bytes (58 words) - 12:41, 8 February 2024
  • Dev:Use cases (category GeneralDescription)
    format and language for the data to be exchanged. The aim of the use case description is to formulate requirements on the technical implementation of the data
    7 KB (1,035 words) - 17:27, 5 February 2024
  • Concepts & examples The railML® Infrastructure subschema is focused on the description of the railway network infrastructure including all its various facets
    3 KB (288 words) - 18:47, 20 March 2024
  • vehicleManufacturer, vehicleOperator, weightLimit Children None Attributes: description: should be interpreted in its elements' context, substantiates the name
    512 bytes (58 words) - 12:39, 8 February 2024
  • railML® version 3.2 UML-visualization of generic Documentation name and description of the object dependent on the language Subschema generic Parents* combinedRoute
    518 bytes (58 words) - 12:42, 8 February 2024
  • Dev:Downloading and using railML (category GeneralDescription)
    Downloading and using railML® This Guideline is intended to help you through the first steps in downloading and using railML®. If you are not yet registered
    3 KB (371 words) - 17:02, 3 April 2023
  • elements' context (e.g. signal/name, vehicle/name) (obligatory; xs:string), description: should be interpreted in its elements' context, substantiates the name
    507 bytes (58 words) - 18:40, 19 December 2019
  • number of the information. (optional; xs:nonNegativeInteger), description: The verbal description of the information. (optional; xs:string), normalState: The
    510 bytes (9 words) - 18:48, 19 December 2019
  • number of the information. (optional; xs:nonNegativeInteger), description: The verbal description of the information. (optional; xs:string), normalState: The
    510 bytes (9 words) - 18:48, 19 December 2019
  • trainRadio, tunnelGateIS, underCrossing, weightLimit Children None Attributes: description: This attribute is not documented in the schema! (optional; xs:string)
    517 bytes (38 words) - 21:50, 25 April 2022
  • typicalTimeToOpen="P1D"> <rail3:designator description="" entry="" register=""/> <rail3:assetName description="" language="EN" name=""/> <rail3:belongsToOperationalPoint
    5 KB (599 words) - 14:26, 27 May 2022
  • IL:routeEntry of railML® version 3.2 UML-visualization of IL Documentation Description of the start point of the route. This is normally a signal. Subschema
    1 KB (151 words) - 20:08, 29 January 2020
  • IL:routeExit of railML® version 3.2 UML-visualization of IL Documentation Description of the route destination point. In most cases the route destination is
    2 KB (187 words) - 20:37, 29 January 2020
  • isSignalized="false" refersToTrain="endOfTrain"> <name name="JNA-201" description="Speed section" language="EN"/> <linearLocation id="spsec100_lloc" ap
    2 KB (250 words) - 18:16, 15 January 2024
  • ❗ Please note, that this page is made for saving ideas, concepts and descriptions for the upcoming railML® 3.2 Timetable scheme. This page shall be replaced
    1 KB (97 words) - 07:08, 13 June 2020
  • version 3.2 UML-visualization of IL Documentation Reference to physical description of level crossing interface with list of commands to the field and notifications
    515 bytes (9 words) - 18:47, 19 December 2019
  • schema! Subschema infrastructure Parents* polygon Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (0..1)
    508 bytes (38 words) - 21:51, 25 April 2022
  • Dev:How to edit and contribute to the Wiki (category GeneralDescription)
    {{Attr|processStatus}}, {{Attr|id}}, {{Attr|code}}, {{Attr|name}}, {{Attr|description}}, {{Attr|xml:lang}} Describe your changes with "Summary" or Zusammenfassung
    11 KB (1,424 words) - 18:13, 15 April 2024
  • the schema! Subschema infrastructure Parents* circle Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (1..1)
    514 bytes (38 words) - 21:51, 25 April 2022
  • Dev:Wiki Documentation Guidelines (category GeneralDescription)
    Please, notice the basic Principles for joining this wiki, as explained here The working language of this wiki is English. The complete content should
    12 KB (1,475 words) - 15:28, 15 April 2024
  • downleft-rightup: Description of a logical position of a simple crossing within a route path from the lower left to upper right upleft-rightdown: Description of a logical
    529 bytes (9 words) - 18:49, 19 December 2019
  • IL:deactivatedBy of railML® version 3.2 UML-visualization of IL Documentation The description of deactivation conditions for this level crossing. Subschema interlocking
    1 KB (101 words) - 12:13, 30 May 2020
  • IL:activationCondition of railML® version 3.2 UML-visualization of IL Documentation Description of the possible activation conditions of this level crossing. Subschema
    4 KB (465 words) - 12:14, 30 May 2020
  • version 3.2 UML-visualization of generic Documentation particular name and description of the system asset dependent on language Subschema generic Parents* controller
    515 bytes (58 words) - 12:42, 8 February 2024
  • Dev:UsingAny (category GeneralDescription)
    name="InterCity" description="Fast large city connection" trainUsage="passenger" my:colour="red"/> <category id="c2" code="RE" name="RegionalExpress" description="Fast
    23 KB (2,659 words) - 09:51, 1 June 2022
  • (optional; xs:string) Possible values: backward forward, fromDescription: Textual description of the origin. (optional; xs:string), ref: The actual reference
    522 bytes (38 words) - 21:56, 25 April 2022
  • to reference this element within railML. @description – The string element takes a more detailed description of the logic. This is for information of the
    964 bytes (88 words) - 19:16, 29 January 2020
  • – The name of the asset in the related language. @description – The additional optional description for the asset. @language – The identification of the
    3 KB (356 words) - 18:05, 18 August 2021
  • Dev:Examples (category GeneralDescription)
    test the limmitations of applications. Good examples contain a brief description (abstract) information of the content (number, formats and functions of
    5 KB (674 words) - 15:49, 15 April 2024
  • <rail3:etcsAreas> <rail3:etcsArea id="etcsArea01" mVersion="33"> <rail3:name description="ETCS area Border: M_VERSION 1.1 -> 2.1" language="EN" name="etcsArea_Border_BON"/>
    5 KB (655 words) - 16:22, 15 January 2024
  • IL:routeActivationSection of railML® version 3.2 UML-visualization of IL Documentation Description of the route activation, i.e. automatic setting or locking when the route
    2 KB (271 words) - 20:16, 29 January 2020
  • Rtm4railml Parents* network Children networkResource (0..*) Attributes: descriptionLevel: This attribute is not documented in the schema! (optional; xs:string)
    599 bytes (28 words) - 11:08, 26 February 2024
  • Exchange of Logical Train Positions   Current train positions should be exchanged between a TMS and other systems. Current position means: the position
    16 KB (1,407 words) - 11:50, 18 July 2022
  • IL:reasonForConflict of railML® version 3.2 UML-visualization of IL Documentation Description of the reason for the conflict. Subschema interlocking Parents* conflictingRoute
    520 bytes (9 words) - 18:50, 19 December 2019
  • Guideline for participating in the development process This guideline is supposed to explain the development of the railML® schema and how you can contribute
    5 KB (671 words) - 17:12, 3 April 2023
  • Dev:Special Wiki Markup (category GeneralDescription)
    The following templates may be used at every wiki page for referring to a certain railML® element documentation page. The link is shown in angle brackets:
    5 KB (572 words) - 15:29, 15 April 2024
  • the objects associated with this route and set them accordingly. The description of a route starts with the following information: @locksAutomatically
    9 KB (1,077 words) - 08:15, 7 May 2022
  • Dev:catalog (category GeneralDescription)
    Xerces with some additional flags/parameter: <target name="xml-validate" description="Validate ${xml-file} against its schema files"> <schemavalidate file="${xml-file}
    15 KB (1,996 words) - 12:36, 20 August 2021
  • IL:overlapReleaseTimer of railML® version 3.2 UML-visualization of IL Documentation Description of overlap release timer (duration, start condition) Subschema interlocking
    522 bytes (5 words) - 18:51, 19 December 2019
  • InfrastructureInstallations OperationalPlanning Rollingstock SecondaryCauses, reasonDescription: May be used to provide a textual reasoning for the cancellation intended
    514 bytes (38 words) - 21:55, 25 April 2022
  • Dev:versions (category GeneralDescription)
    Reason Commited changes have affects on XML-instance files and should be announced in advance in corresponding railML® newsgroups. Decision Tagging a major
    9 KB (1,043 words) - 11:28, 15 February 2023
  • Example entry <trainClearanceGauge code="GA"> <description>stucture gauge GA according European standard</description> <validFor>interoperable</validFor> </trainClearanceGauge>
    6 KB (294 words) - 14:03, 7 December 2023
  • <gmlLocations> <lineString> <description> <descriptionReference> <identifier> <name> <pos> <posList> <point> <description> <descriptionReference> <identifier>
    125 KB (1,906 words) - 03:09, 26 October 2023
  • information of the related network in the interlocking. Therefore the description of is mainly a list of references to the related items needed for the
    6 KB (597 words) - 13:58, 21 August 2021
  • RS:brakes of railML® version 3.2 UML-visualization of RS Documentation The description and technical data of the installed brake system of the vehicle. Subschema
    509 bytes (38 words) - 16:19, 5 March 2021
  • </netRelation> </netRelations> <networks> <network id="nw01"> <level id="lv0" descriptionLevel="Micro"> <networkResource ref="ne_a01"/> <networkResource ref="ne_a02"/>
    9 KB (931 words) - 12:07, 4 April 2024
  • RS:brakeEffort of railML® version 3.2 UML-visualization of RS Documentation The description of the resulting brake effort for regular brake application as x-y-curve
    514 bytes (38 words) - 16:19, 5 March 2021
  • RS:tractiveEffort of railML® version 3.2 UML-visualization of RS Documentation The description of the tractive effort of this engine as x-y-curve vs. speed. Subschema
    517 bytes (38 words) - 16:19, 5 March 2021
  • document for the equipment of the interlocking logic. An interlocking description consists mainly of: Track and trackside signalling components, Route control
    4 KB (493 words) - 10:38, 31 May 2021
  • Timetabling; Fahrplan Each RU has to provide a timetable for their train- and shunting movements in a coming time period. Besides the RU itself the involved
    3 KB (343 words) - 13:44, 13 March 2023
  • instance routesetting. An interlocking is required to set and lock routes. A description of routes in terms of railML is of interest to both engineering and simulation
    7 KB (959 words) - 14:06, 7 December 2023
  • Rail Inspection Data ; Schienenprüfdaten The application broaches the issue of railway track inspection and maintenance. With the help of railML data,
    4 KB (354 words) - 16:37, 4 December 2023
  • apply to train coupling, sharing and "strengthening". See corresponding descriptions for further information.) Usage of tTimeScope="earliest" / ="latest"
    16 KB (1,903 words) - 13:27, 13 March 2023
  • scope='commercial' connections: <commercialConnection> element(s) stop description: only <stop> elements which contain a <isCommercial> elemente will be
    5 KB (751 words) - 13:28, 13 March 2023
  • elementNumber="0" id="" indicatorType="cautiousDriving"> <rail3:designator description="" entry="" register=""/> <rail3:hasCommand entityCode="" ref=""/> <rail3:hasIndication
    2 KB (240 words) - 13:40, 28 May 2022
  • tor elementNumber="0" id="" positionInRoute="end"> <rail3:designator description="" entry="" register=""/> <rail3:hasCommand entityCode="" ref=""/> <rail3:hasIndication
    2 KB (200 words) - 13:21, 28 May 2022
  • Traffic Management Plan Description / Beschreibung / Description The UseCase TrafficManagementPlan (TMP) defines exchange of information between Timetable
    3 KB (270 words) - 15:11, 27 June 2022
  • connections: <connection> element(s) with connType='commercial' stop description: only <stopDescription> elements with commercial='true' will be relevant including
    4 KB (592 words) - 18:06, 7 December 2023
  • after finalizing the use case in the working groups alongside with this description. Rollingstock data usually includes the capabilities of the available
    6 KB (858 words) - 12:09, 25 March 2024
  • CAD for railway signalling; CAD für Zugsignalisierung Engineers of the railway signaling discipline use a Computer-Aided Design (CAD) tool to model a railway
    1 KB (127 words) - 14:12, 7 December 2023
  • Operational simulation; Betriebssimulation For various purposes it is necessary to simulate the process of railway operation for a fragment or an entire
    1 KB (146 words) - 13:29, 13 March 2023
  • Earliest departure Latest departure Minimum stop time Stop type, stop description Commercial connections Infrastructure <ocpTT> Ordered stops Rolling stock
    2 KB (273 words) - 13:26, 13 March 2023
  • Railway Infrastructure Visualisation; Visualisierung von Schieneninfrastruktur The typical railway planning process involves several iterations with different
    2 KB (180 words) - 13:43, 13 March 2023
  • ÖBB-SCHIG-Reporting (NRE Reporting Austria); NRE Meldung Österreich ÖBB Infrastructure reports several properties of the line and track network periodically
    2 KB (225 words) - 13:45, 13 March 2023
  • downleft-rightup: Description of a logical position of a simple crossing within a route path from the lower left to upper right upleft-rightdown: Description of a logical
    15 KB (1,510 words) - 19:13, 14 February 2022
  • Speed directory; VzG – Verzeichnis zulässiger Geschwindigkeiten The VzG Process is the central interface between infrastructure business processes (building
    3 KB (117 words) - 13:45, 13 March 2023
  • Traction power supply simulation; Simulierung der Bahnstromversorgung For various purposes it is necessary to simulate the (electrical) traction power
    2 KB (236 words) - 13:43, 13 March 2023
  • Adopt vehicle working scheduling to timetable changes; Umlauf an Jahresfahrplan anpassen The importing system holds timetable and vehicle working data
    2 KB (209 words) - 18:11, 27 June 2022
  • Dev:Git Guidelines (category GeneralDescription)
    Only commit to the master branch directly if the changes your are commiting are complete in themselves and don't change the syntax of railML®. Changes
    8 KB (1,082 words) - 13:18, 26 July 2023
  • Dev:Extending railML (category GeneralDescription)
    Extending railML®   There exists a wide range of means to extend XML Schemas. As railML® is intended for collaboration with other parties, there is a frame
    7 KB (985 words) - 10:01, 1 June 2022
  • Automatic Schemaexport for Element description
    359 bytes (5 words) - 18:41, 19 December 2019
  • Automatic Schemaexport for Element description
    437 bytes (5 words) - 21:49, 25 April 2022
  • Automatic Schemaexport for Element descriptionReference
    578 bytes (5 words) - 21:49, 25 April 2022
  • Automatic Schemaexport for Element descriptionReference
    500 bytes (5 words) - 18:41, 19 December 2019
  • numberInStack="1" orientation="horizontal" usedForDirection="both"> <rail3:designator description="" entry="" register=""/> <rail3:hasCommand entityCode="" ref=""/> <rail3:hasIndication
    3 KB (348 words) - 13:08, 28 May 2022
  • Railway Laboratory (Simulations and Research Support) The aim of our project is to simulate railway traffic in laboratory conditions in order to improve
    3 KB (427 words) - 17:57, 27 June 2022
  • Capture schematic visualisation information of track assets; Erstellung schematischer Visualisierungsinformationen von Schienenanlagen railML data will
    3 KB (383 words) - 13:44, 13 March 2023
  • Parents* hasHmiIndication, hasOperatorCommand Children None Attributes: description: should be interpreted in its elements' context, substantiates the name
    519 bytes (58 words) - 12:42, 8 February 2024
  • short name for the train clearance gauges in latin letters Children <description>: Internationalized name of the clearance gauge. <validFor>: Gives indication
    6 KB (797 words) - 12:50, 29 November 2023
  • Long Term Strategic Timetabling; Langfristfahrplanerstellung The timetable data prepared in this use case is not formally linked to the production process
    4 KB (523 words) - 11:14, 18 July 2022
  • Dev:Using xsi:type (category GeneralDescription)
    Using xsi:type   Before implementing any extensions to the railML® schema, please consider Dev:Extending_railML#when. The means described in this page
    18 KB (2,309 words) - 14:28, 1 August 2022
  • Schematic Track Plan Infrastructure managers use maps for the visualization of their railway infrastructure. These maps comprise: Geographic maps Geoschematic
    4 KB (198 words) - 16:57, 13 February 2023
  • Dev:Use case example/old (category GeneralDescription) (section Description / Beschreibung)
    the use case here. The headline is made with Template: UC description (type {{UC description}}) In this section the data flows should be drafted. The headline
    2 KB (220 words) - 16:25, 4 December 2023
  • generic:trainBrakes of railML® version 3.2 UML-visualization of generic Documentation Description of the type of brakes within the formation and their application as brake
    519 bytes (58 words) - 12:43, 8 February 2024
  • generic:vehicleBrakes of railML® version 3.2 UML-visualization of generic Documentation Description of the type of vehicle brakes and their application as brake effort or
    521 bytes (58 words) - 12:43, 8 February 2024
  • Exchange of formation data; Austausch von Wagenreihungen/Behängungsdaten The usecase describes the exchange of data between a software tool for short term
    6 KB (688 words) - 13:26, 13 March 2023
  • not be used as leading information, but rather as derived additional description. (obligatory; xs:integer; minInclusive: 0; maxInclusive: 15) *Notice:
    519 bytes (38 words) - 21:49, 25 April 2022
  • being framed. Do not edit manually! Certification: Compliance with the description in the Wiki is relevant for fulfilling the requirements (see below). Semantics:
    5 KB (653 words) - 16:05, 3 April 2023
  • RINF-XML, and therefore support and maintain natively the railML3 RINF file description according to the evolutions of the project. The railML3 file for RINF
    3 KB (297 words) - 13:49, 13 March 2023
  • (optional; xs:string) Possible values: backward forward, fromDescription: Textual description of the origin. (optional; xs:string), ref: The actual reference
    2 KB (5 words) - 12:43, 8 February 2024
  • Subschema generic Parents* hasCommunicationSettings Children None Attributes: description: should be interpreted in its elements' context, substantiates the name
    519 bytes (58 words) - 12:42, 8 February 2024
  • interlocking is depending on the way of control. In the generic type description the following information can be included: @isControlType – This describes
    3 KB (405 words) - 15:31, 29 October 2023
  • Main items Detailed description Topology Inclusion of use case "Schematic Track Plan" (SCTP) Track IS:Track
    11 KB (828 words) - 13:25, 13 March 2023
  • Passenger Information Inside the Train; Fahrgastinformation im Zug The use case describes the data of the timetable, which will be imported in a real time
    9 KB (677 words) - 18:10, 27 June 2022
  • vehicle. The activities mentioned can be carried out one after the other. Description of parallel work is not included in this use case. For the purposes of
    6 KB (926 words) - 17:00, 4 December 2023
  • RailTopoModel® compliant railway network description enriched with the design layout and infrastructure description including also the essential information
    5 KB (737 words) - 16:12, 15 April 2024
  • Maintenance Planning; Wartungsplanung The application focuses the transfer of infrastructure data from an asset management source system (e.g. DfA in Switzerland)
    1 KB (133 words) - 13:47, 13 March 2023
  • Network Statement; Network Statement The Network Statement covers the requirements for access and use of the rail network (route network) of the infrastructure
    2 KB (169 words) - 11:34, 12 April 2024
  • Integrated Traffic Management System The purpose of a TMS is to optimize rail traffic flow by providing decision support to dispatchers as well as automated
    2 KB (179 words) - 17:27, 13 February 2023
  • Hardware and cable plan; Hardware und Kabelplan Cable plan Parts Lists Number of field element controller Hardware indoor, outdoor (number of point machines
    1 KB (119 words) - 13:51, 13 March 2023
  • Passenger Information System; Passagierinformationssystem The application focuses the transfer of timetable, traction and topology information from the
    1 KB (157 words) - 13:46, 13 March 2023
  • *.xml or *.railml, that is the question. The answer is: Both. It was not a convention from the beginning, but best practice should be: *.railml shall only
    11 KB (1,742 words) - 18:13, 29 November 2023
  • Operation and Control; Betrieb und Kontrolle The operation and control systems for one railway operating company are normally provided by one selected
    2 KB (209 words) - 13:52, 13 March 2023
  • Driver Advisory System (DAS); Fahrerassistentsystem The Driver Advisory System (DAS) is an on-train driver support system which advises a driver on the
    3 KB (306 words) - 13:48, 13 March 2023
  • Positioning and Map-Matching; Positionierung und Kartenabgleich With a train-borne positioning system, which is a multi-sensor on-board positioning device
    3 KB (367 words) - 13:49, 13 March 2023
  • Topology (schematic drawing) on micro, meso and macroscopic level, with description of data (values and position) Timetable graph, Platform occupation diagram
    5 KB (687 words) - 13:46, 13 March 2023
  • select such a group and configure the toplogy would be useful. There is no description of this as of today. If RailML is introduced, the system will need to
    5 KB (558 words) - 13:53, 13 March 2023
  • Railway Infrastructure Recording; Erfassung der Schieneninfrastruktur There are several systems and projects that follow the aim to record and visualize
    3 KB (335 words) - 13:48, 13 March 2023
  • Exchange of planning parameters for interlocking with suppliers; Austausch von Planungsparametern für Stellwerke mit Anbietern All the planning parameters
    3 KB (367 words) - 13:47, 13 March 2023
  • <rail3:etcsLevelTransition id="8c37ad44-990c-4130-8e16-ebe685f63db5"> <rail3:name description="ETCS Level Transition: L1LS -> L2" language="EN" name="etcsLevelTransition_BON"/>
    2 KB (236 words) - 17:21, 15 January 2024
  • number of the information. (optional; xs:nonNegativeInteger), description: The verbal description of the information. (optional; xs:string), normalState: The
    977 bytes (5 words) - 12:41, 8 February 2024
  • number of the information. (optional; xs:nonNegativeInteger), description: The verbal description of the information. (optional; xs:string), normalState: The
    973 bytes (5 words) - 12:41, 8 February 2024
  • version 3.2 UML-visualization of generic Documentation particular name and description of the system asset dependent on language Subschema generic Parents* controller
    899 bytes (5 words) - 15:55, 8 February 2024
  • Posession Management   Possession is a takeover of responsibility for a part of railway network from the “train operator” to the PICOP (Person In Charge
    3 KB (394 words) - 12:02, 18 July 2022
  • railML® version 3.2 UML-visualization of generic Documentation name and description of the object dependent on the language Subschema generic Parents* combinedRoute
    1 KB (5 words) - 15:55, 8 February 2024
  • Site preparation data for Signal Controlled Warning Systems (SCWS); Daten zur Standortvorbereitung für signalkontrollierte Warnsysteme An SCWS is a system
    4 KB (571 words) - 13:51, 13 March 2023
  • Import complete timetable for vehicle working scheduling and vehicle workings; Umlaufbildung Fahrzeuge Jahresfahrplan A complete timetable shall be imported
    3 KB (355 words) - 18:11, 27 June 2022
  • railML® version 3.2 UML-visualization of generic Documentation name and description of the asset dependent on the language Subschema generic Parents* derailerIL
    1 KB (5 words) - 15:55, 8 February 2024
  • tunnelGateIS, underCrossing, weightLimit Children None Attributes: description: description of the external identifier or reference, providing basic information
    2 KB (5 words) - 15:55, 8 February 2024
  • number of the information. (optional; xs:nonNegativeInteger), description: The verbal description of the information. (optional; xs:string), normalState: The
    1 KB (5 words) - 14:22, 24 January 2020
  • downleft-rightup: Description of a logical position of a simple crossing within a route path from the lower left to upper right upleft-rightdown: Description of a logical
    1 KB (5 words) - 12:42, 8 February 2024
  • number of the information. (optional; xs:nonNegativeInteger), description: The verbal description of the information. (optional; xs:string), normalState: The
    1 KB (5 words) - 14:22, 24 January 2020
  • direction. Note that the linear ways should form a complete routable description of the watercourse [openStreetMap]. road: unknown road type secondaryRoad:
    7 KB (15 words) - 13:37, 12 April 2024
  • line network Construction: assets along the track / line Track layout description ETCS level transition locations Points Signals BaliseGroups (if available
    5 KB (441 words) - 09:30, 12 June 2023
  • ref: a reference to an external element (optional; xs:string), description: description of the external identifier or reference, providing basic information
    2 KB (5 words) - 18:42, 19 December 2019
  • passable during traversal of a vessel. (optional; xs:duration), description: Description of the logic. (optional; xs:string), elementNumber: element number
    2 KB (5 words) - 12:41, 8 February 2024
  • schema! Subschema infrastructure Parents* gmlLocations Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (1..1)
    716 bytes (5 words) - 14:21, 24 January 2020
  • will be automatically relocked again. (optional; xs:duration), description: Description of the logic. (optional; xs:string), id: unique identifier (optional;
    2 KB (5 words) - 14:22, 24 January 2020
  • schema! Subschema infrastructure Parents* polygon Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (0..1)
    774 bytes (5 words) - 21:51, 25 April 2022
  • schema! Subschema infrastructure Parents* gmlLocations Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (1..1)
    716 bytes (5 words) - 16:13, 5 March 2021
  • be tolerated due to running self-test. (optional; xs:duration), description: Description of the logic. (optional; xs:string), elementNumber: element number
    2 KB (5 words) - 12:41, 8 February 2024
  • initiated or triggered from interlocking. (optional; xs:duration), description: Description of the logic. (optional; xs:string), id: unique identifier (optional;
    2 KB (5 words) - 14:22, 24 January 2020
  • schema! Subschema infrastructure Parents* gmlLocations Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (0..1)
    789 bytes (5 words) - 14:21, 24 January 2020
  • the schema! Subschema infrastructure Parents* circle Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (1..1)
    722 bytes (5 words) - 21:51, 25 April 2022
  • schema! Subschema infrastructure Parents* gmlLocations Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (0..1)
    789 bytes (5 words) - 16:13, 5 March 2021
  • vehicle, vehiclePart, weightLimit, workZone Children None Attributes: description: description of the designator, which can be used to provide basic information
    6 KB (5 words) - 15:55, 8 February 2024
  • three <netElement> objects are fully covered by the <line>. The resulting description of the railway line looks like this: <lines> <line id="lin01" lineCategory="other:CE"
    9 KB (873 words) - 14:24, 11 April 2024
  • release is indicated to the operator. (optional; xs:duration), description: Description of the logic. (optional; xs:string), elementNumber: element number
    3 KB (5 words) - 12:41, 8 February 2024
  • RS:brakes of railML® version 3.2 UML-visualization of RS Documentation The description and technical data of the installed brake system of the vehicle. Subschema
    435 bytes (5 words) - 12:43, 8 February 2024
  • range of signal aspects can be categorised in several groups for the description of their meaning – the so-called @genericAspect. There are the following
    8 KB (1,085 words) - 10:48, 10 November 2023
  • Réseau nl-BE: Netverklaring fr-BE: Infrabel nl-BE: Infrabel fr-BE: courte description et la source nl-BE: korte beschrijving en de bron Belgium () ENEE ENEE
    13 KB (721 words) - 14:12, 9 October 2023
  • RS:tractiveEffort of railML® version 3.2 UML-visualization of RS Documentation The description of the tractive effort of this engine as x-y-curve vs. speed. Subschema
    440 bytes (5 words) - 21:53, 25 April 2022
  • IL:deactivatedBy of railML® version 3.2 UML-visualization of IL Documentation The description of deactivation conditions for this level crossing. Subschema interlocking
    603 bytes (5 words) - 21:51, 25 April 2022
  • Asset Status Representation for TMS Traffic Management Systems (TMS) consider various sorts of input data for the calculation of the current traffic situation
    10 KB (129 words) - 16:01, 27 September 2023
  • RS:brakeEffort of railML® version 3.2 UML-visualization of RS Documentation The description of the resulting brake effort for regular brake application as x-y-curve
    516 bytes (5 words) - 21:53, 25 April 2022
  • Description: Infrastructure Managers (IM) wish to represent their railway system in terms of standardised data types. Eulynx collects the types and attributes
    3 KB (450 words) - 17:54, 27 June 2022
  • Dev:Guides (category GeneralDescription)
    Guides and Developer Pages   This page provides an overview over pages from the Dev-namespace that offer User Guides, information for developers and connected
    702 bytes (25 words) - 14:53, 7 December 2023
  • IL:activationCondition of railML® version 3.2 UML-visualization of IL Documentation Description of the possible activation conditions of this level crossing. Subschema
    1 KB (5 words) - 12:41, 8 February 2024
  • Subschema generic Parents* hasCommunicationSettings Children None Attributes: description: should be interpreted in its elements' context, substantiates the name
    845 bytes (5 words) - 15:55, 8 February 2024
  • Parents* hasHmiIndication, hasOperatorCommand Children None Attributes: description: should be interpreted in its elements' context, substantiates the name
    830 bytes (5 words) - 15:55, 8 February 2024
  • IL:routeEntry of railML® version 3.1 UML-visualization of IL Documentation Description of the start point of the route. This is normally a signal. Subschema
    923 bytes (5 words) - 14:22, 24 January 2020
  • IL:overlapReleaseTimer of railML® version 3.1 UML-visualization of IL Documentation Description of overlap release timer (duration, start condition) Subschema interlocking
    744 bytes (5 words) - 18:51, 19 December 2019
  • IL:deactivatedBy of railML® version 3.1 UML-visualization of IL Documentation The description of deactivation conditions for this level crossing. Subschema interlocking
    1 KB (5 words) - 14:21, 24 January 2020
  • version 3.1 UML-visualization of IL Documentation Reference to physical description of level crossing interface with list of commands to the field and notifications
    965 bytes (5 words) - 14:21, 24 January 2020
  • IL:interface of railML® version 3.1 UML-visualization of IL Documentation Description of a physical interface with definition of the information to be exchanged
    1 KB (5 words) - 14:22, 24 January 2020
  • IL:routeExit of railML® version 3.1 UML-visualization of IL Documentation Description of the route destination point. In most cases the route destination is
    1,018 bytes (5 words) - 14:22, 24 January 2020
  • version 3.2 UML-visualization of IL Documentation Reference to physical description of level crossing interface with list of commands to the field and notifications
    1 KB (5 words) - 21:51, 25 April 2022
  • IL:routeEntry of railML® version 3.2 UML-visualization of IL Documentation Description of the start point of the route. This is normally a signal. Subschema
    1 KB (5 words) - 12:42, 8 February 2024
  • IL:activationCondition of railML® version 3.1 UML-visualization of IL Documentation Description of the possible activation conditions of this level crossing. Subschema
    1 KB (5 words) - 14:21, 24 January 2020
  • IL:interface of railML® version 3.2 UML-visualization of IL Documentation Description of a physical interface with definition of the information to be exchanged
    2 KB (5 words) - 12:41, 8 February 2024
  • IL:overlapReleaseTimer of railML® version 3.2 UML-visualization of IL Documentation Description of overlap release timer (duration, start condition) Subschema interlocking
    1 KB (5 words) - 12:42, 8 February 2024
  • IL:routeExit of railML® version 3.2 UML-visualization of IL Documentation Description of the route destination point. In most cases the route destination is
    1 KB (5 words) - 12:42, 8 February 2024
  • downleft-rightup: Description of a logical position of a simple crossing within a route path from the lower left to upper right upleft-rightdown: Description of a logical
    5 KB (5 words) - 12:41, 8 February 2024
  • used to direct vehicles from one track to another track. To separate the description of the infrastructure topology from its construction, railML® 3 is based
    18 KB (2,052 words) - 18:20, 15 April 2024
  • IL:reasonForConflict of railML® version 3.1 UML-visualization of IL Documentation Description of the reason for the conflict. Subschema interlocking Parents* conflictingRoute
    2 KB (5 words) - 14:22, 24 January 2020
  • Rtm4railml Parents* network Children networkResource (0..*) Attributes: descriptionLevel: This attribute is not documented in the schema! (optional; xs:string)
    926 bytes (5 words) - 12:39, 8 February 2024
  • trainRadio, tunnelGateIS, underCrossing, weightLimit Children None Attributes: description: This attribute is not documented in the schema! (optional; xs:string)
    2 KB (5 words) - 12:39, 8 February 2024
  • not be used as leading information, but rather as derived additional description. (obligatory; xs:integer; minInclusive: 0; maxInclusive: 15) *Notice:
    534 bytes (5 words) - 21:49, 25 April 2022
  • InfrastructureInstallations OperationalPlanning Rollingstock SecondaryCauses, reasonDescription: May be used to provide a textual reasoning for the cancellation intended
    2 KB (5 words) - 12:43, 8 February 2024
  • IL:routeActivationSection of railML® version 3.2 UML-visualization of IL Documentation Description of the route activation, i.e. automatic setting or locking when the route
    1 KB (5 words) - 12:42, 8 February 2024
  • IL:reasonForConflict of railML® version 3.2 UML-visualization of IL Documentation Description of the reason for the conflict. Subschema interlocking Parents* conflictingRoute
    2 KB (5 words) - 12:42, 8 February 2024
  • IL:routeActivationSection of railML® version 3.1 UML-visualization of IL Documentation Description of the route activation, i.e. automatic setting or locking when the route
    1 KB (5 words) - 14:22, 24 January 2020
  • vehicleManufacturer, vehicleOperator, weightLimit Children None Attributes: description: should be interpreted in its elements' context, substantiates the name
    5 KB (5 words) - 15:55, 8 February 2024
  • generic:trainBrakes of railML® version 3.2 UML-visualization of generic Documentation Description of the type of brakes within the formation and their application as brake
    2 KB (5 words) - 15:55, 8 February 2024
  • generic:vehicleBrakes of railML® version 3.2 UML-visualization of generic Documentation Description of the type of vehicle brakes and their application as brake effort or
    2 KB (5 words) - 15:55, 8 February 2024
  • Infrastructure The railML® Infrastructure subschema is focused on the description of the railway network infrastructure including all its various facets
    10 KB (1,042 words) - 15:08, 3 April 2024
  • For details refer to <hasHmiIndication>. <hasInterface> – This is the description of the physical interface between the interlocking and the level crossing
    18 KB (1,997 words) - 15:11, 4 June 2022
  • Dev:Reversing trains and formations (category GeneralDescription)
    This article explains basic concepts of handling formation orientation within the timetable subschema. Dieser Artikel erklärt die grundlegenden Konzepte
    7 KB (771 words) - 13:39, 13 March 2023
  • elements' context (e.g. signal/name, vehicle/name) (obligatory; xs:string), description: should be interpreted in its elements' context, substantiates the name
    3 KB (5 words) - 11:56, 14 February 2021
  • Rtm4railml Parents* network Children networkResource (0..*) Attributes: descriptionLevel: This attribute is not documented in the schema! (optional; xs:string)
    863 bytes (5 words) - 18:16, 23 December 2019
  • direction. Note that the linear ways should form a complete routable description of the watercourse [openStreetMap]. road: unknown road type secondaryRoad:
    4 KB (5 words) - 12:40, 8 February 2024
  • 3. Please note that railway switch description makes use of only branching and continue branches for its description, while the switchable crossing makes
    29 KB (2,876 words) - 14:34, 13 March 2024
  • CO:trainType CO:vehicleManufacturer CO:vehicleOperator GML4RAILML:description GML4RAILML:descriptionReference GML4RAILML:identifier GML4RAILML:name GML4RAILML:pos
    3 KB (756 words) - 14:47, 27 June 2022
  • that railway switch description uses only branching and continue branches for its description, the switchable crossing description makes use of only straight
    24 KB (2,447 words) - 14:36, 13 March 2024