Search results

Jump to navigation Jump to search
  • UC:IL:Simulation (category Use case (IL)) (section Use case / Anwendungsfall)
    tools use their own internal generic interlocking (table) model. Thus this use case does not require a interlocking table. This distinguishes this IL UC from
    7 KB (959 words) - 14:06, 7 December 2023
  • UC:IL:InterlockingEngineering (category Use case (IL)) (section Use case / Anwendungsfall)
    exchange format. This use case concerns the exchange of engineering data for tailoring an interlocking to fit a station. This use case focuses on "legacy"
    11 KB (828 words) - 13:25, 13 March 2023
  • UC:IL:HardwareAndCablePlan (category Use case (IL)) (section Use case / Anwendungsfall)
    cable plan Subschema: Interlocking For general information on use cases see UC:Use cases
    1 KB (119 words) - 13:51, 13 March 2023
  • UC:IL:OperationAndControl (category Use case (IL)) (section Use case / Anwendungsfall)
    interlockings has to be incorporated into the operation and control systems. They uses the interlocking to operate elements get element status schedule and manage
    2 KB (209 words) - 13:52, 13 March 2023
  • UC:IL:EulynxDataPreparationInterlocking (category Use case (IL))
    reflect the as-built situation. Please refer to the linked use cases that cover the Eulynx use case. For detailed information please refer to the website https://eulynx
    3 KB (450 words) - 17:54, 27 June 2022
  • enters a warning area) ETCS ID of the SCWS Timeout for simplified search in case of a switch fault Signaling type of this SCWS (stationary, ETCS Level 1,
    4 KB (571 words) - 13:51, 13 March 2023
  • together especially when gathering information regarding topology. Future use case should handle integration towards 3D modelling for evaluation of e.g. sight
    5 KB (558 words) - 13:53, 13 March 2023
  • Current UML visualization A list of use cases for railML's interlocking scheme can be found here Category:Use_case_(IL). Interlocking Concepts — explanations
    1 KB (153 words) - 18:26, 3 November 2023
  • IL Use Cases – IS Use Cases – RS Use Cases – TT Use Cases View/edit list on the separate source page   If you want to reactivate your inactive use case
    7 KB (287 words) - 15:43, 8 April 2024
  • RailTopoModel (external link). A list of use cases for the railML® interlocking schema can be found on page Category:Use case (IL). →Main Article: Infrastructure
    10 KB (1,041 words) - 10:56, 2 May 2024
  • IL:switchIL (category Missing Attribute Documentation/IL)
    n> </derailerIL> </derailersIL> Dependent on the language variant there are several terms in use: point, turnout, switch. railML will use the term „switch“
    19 KB (1,714 words) - 09:32, 3 May 2023
  • IL:derailerIL (category Missing Attribute Documentation/IL)
    This marks the position, which the derailer shall have in normal case, i.e. when not in use of a route. The possible positions can be derailingPosition –
    5 KB (484 words) - 12:44, 27 May 2022
  • IL:movableCrossing (category Missing Attribute Documentation/IL)
    position. In case of switch actuators connected to the crossing for changing its position the attribute @numberOfFrogSwitchActuators shall be used to identify
    15 KB (1,510 words) - 19:13, 14 February 2022
  • station, train number field, timetable element) to the next. For example, one use case is a TMS that provides the current (dispatching) timetable and train positions
    16 KB (1,407 words) - 11:50, 18 July 2022
  • IL:tvdSection (category Pages using Tabber parser tag)
    <hasExitSignal> – This is the reference to a <signalIL> which protects the exit from this TVD section. It shall be used in case @isBerthingTrack is set to true. Within
    7 KB (829 words) - 15:11, 27 May 2022
  • IL:interlocking (category Pages using Tabber parser tag)
    common module (common3.xsd) are used. In addition two basic types were created for use in interlocking subschema – entityIL and entityILref. They give the
    4 KB (493 words) - 10:38, 31 May 2021
  • IL:route (category Pages using Tabber parser tag)
    route lock is only applied when a train is approaching the route. In that case this time is the minimum required before the final route lock can be applied
    9 KB (1,077 words) - 08:15, 7 May 2022
  • IL:levelCrossingIL (category Pages using Tabber parser tag)
    even not all information may be really “known” to the interlocking, i.e. in case of autonomous level crossing. @elementNumber - A positive integer number
    18 KB (1,997 words) - 15:11, 4 June 2022
  • IL:keyLockIL (category Pages using Tabber parser tag)
    released for removal. The key is a simple mean of authorisation transfer as its use allows the manual operation of a moveable element. The lock with control from
    4 KB (531 words) - 19:18, 29 January 2020
  • UC:IS:Timetabling (category Use case (IS)) (section Use case / Anwendungsfall)
    Infrastructure   Related subschemas: IL TT RS  Reported by: ProRail For general information on use cases see UC:Use cases
    3 KB (343 words) - 13:44, 13 March 2023
  • IL:key (category Pages using Tabber parser tag)
    The Boolean value gives indication whether the key is of physical type for use in a mechanical lock.
    964 bytes (88 words) - 19:16, 29 January 2020
  • IL:signalIL (category Pages using Tabber parser tag)
    which is neither used as block, entry, exit nor intermediate signal. This is the more general function in case no specific one can be used. repeater – The
    9 KB (1,314 words) - 10:15, 19 May 2023
  • UC:IS:ETCS track net (category Use case (IS)) (section Use case / Anwendungsfall)
    than in use case ETCS-a because data such as balises or routes will be added. The amount of the data to be exchanged is the same as in use case ETCS-a.
    5 KB (441 words) - 09:30, 12 June 2023
  • IL:signalIndicator (category Pages using Tabber parser tag)
    unique identifier used to reference this element within railML. @indicatorType - There is currently only cautiousDriving defined for use. Other values might
    2 KB (240 words) - 13:40, 28 May 2022
  • IL:permissionZone (category Pages using Tabber parser tag)
    the set of assets for which the permission is transferred. In the simple case the permission can only be changed for the entire station or interlocking
    1 KB (151 words) - 19:42, 29 January 2020
  • UC:IS:CADForRailwaySignaling (category Use case (IS)) (section Use case / Anwendungsfall)
    signalling; CAD für Zugsignalisierung Engineers of the railway signaling discipline use a Computer-Aided Design (CAD) tool to model a railway construction project
    1 KB (127 words) - 14:12, 7 December 2023
  • UC:RS:OperationalSimulation (category Use case (RS)) (section Use case / Anwendungsfall)
    Subschema: Rollingstock   Related subschemas: IS IL TT  For general information on use cases see UC:Use cases
    1 KB (146 words) - 13:29, 13 March 2023
  • IL:genericDetector (category Pages using Tabber parser tag)
    interlocking needs to trigger the self-test of the detector. It has to be used in combination with @triggeredSelfTest. <detectorType> – This is the reference
    2 KB (218 words) - 19:17, 29 January 2020
  • UC:IS:Schematic Track Plan (category Use case (IS)) (section Use case / Anwendungsfall)
    Schematic Track Plan Infrastructure managers use maps for the visualization of their railway infrastructure. These maps comprise: Geographic maps Geoschematic
    4 KB (198 words) - 16:57, 13 February 2023
  • the infrastructure and state their validity. The infrastructure used in this use case is not based on the current infrastructure but an agreed future infrastructure
    4 KB (523 words) - 11:14, 18 July 2022
  • IL:trainNumberField (category Pages using Tabber parser tag)
    This element does not appear in railML® 3.1 within the IL subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further
    3 KB (348 words) - 13:08, 28 May 2022
  • von Schienenanlagen railML data will be used for engineering signalling and interlocking systems. Engineers are used to working with paper plans that schematically
    3 KB (383 words) - 13:44, 13 March 2023
  • IL:movableBridge (category Pages using Tabber parser tag)
    This element does not appear in railML® 3.1 within the IL subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further
    3 KB (405 words) - 15:00, 27 May 2022
  • IL:implementsSignalplan (category Pages using Tabber parser tag)
    signal is showing. This element shall be used for “old-style” signalling systems with separate distant signals or in case of repeaters within the route. <signalsSpeedProfile>
    17 KB (1,655 words) - 17:19, 30 January 2020
  • UC:TT:FGIInTrain (category Use case (TT)) (section Use case / Anwendungsfall)
    master data for the use case "passenger information inside the train". The information from the <timetable> are data which will be used individually for every
    9 KB (677 words) - 18:10, 27 June 2022
  • UC:IS:IntegratedTMS (category Use case (IS)) (section Use case / Anwendungsfall)
    control. This use case aims to cover all data exchange necessary for the functions listed above. A major difference to previous railML use cases is that this
    2 KB (179 words) - 17:27, 13 February 2023
  • IL:conflictingRoute (category Pages using Tabber parser tag)
    value is used in case of any TVD section of the route is also used by the conflicting one. ConflictingHeadProtection – This value is used in case any signal
    5 KB (573 words) - 12:09, 28 May 2022
  • IL:interface (category Pages using Tabber parser tag)
    element. @bitNr – This is the order number of the command in the list. In case of transmission as complete bitmask it defines the bit position in the byte
    13 KB (1,119 words) - 17:46, 30 January 2020
  • Export of planning tool: planning data, handing-over to the supplier (by using a database). interlocking (see also: Interlocking Engineering) This section
    3 KB (367 words) - 13:47, 13 March 2023
  • UC:IS:CapacityPlanning (category Use case (IS)) (section Use case / Anwendungsfall)
    Infrastructure   Related subschemas: IL TT RS  Reported by: Jernbaneverket For general information on use cases see UC:Use cases
    5 KB (687 words) - 13:46, 13 March 2023
  • IL:routeExit (category Pages using Tabber parser tag)
    is the reference to the physical end of the route path. This is in most cases a signal but can also be a buffer stop or just a train detection device when
    2 KB (187 words) - 20:37, 29 January 2020
  • IL:assetsForIL (category Pages using Tabber parser tag)
    infrastructure subschema. In such cases just the suffix “IL” was added to the name, e.g. signalIS vs. signalIL. The element of <assetsForIL> is not only a collection
    2 KB (272 words) - 12:02, 21 May 2022
  • IL:switchIL/3.2 (category Missing Attribute Documentation/IL)
    Automatic Schemaexport for Element switchIL
    5 KB (5 words) - 12:41, 8 February 2024
  • IL:assetsForInterlocking (category Pages using Tabber parser tag)
    in infrastructure subschema. In such cases just the suffix “IL” was added to the name, e.g. signalIS vs. signalIL. The element of <assetsForInterlocking>
    3 KB (359 words) - 13:19, 29 May 2022
  • Automatic Schemaexport for Element switchIL
    4 KB (5 words) - 14:21, 24 January 2020
  • IL:reasonForConflict (category Pages using Tabber parser tag)
    conflictingOverlap: This value is set in case of the overlap of either route causes the conflict. conflictingStatus: This value is used in case the status of any element
    520 bytes (9 words) - 18:50, 19 December 2019
  • IL:hasTVDresetStrategy (category Pages using Tabber parser tag)
    They deliver mainly the status information vacant, occupied or failed. In case of a failure the particular sections needs to be reset, i.e. declared clear
    4 KB (406 words) - 17:47, 22 January 2020
  • IL:tunnelGateIL (category Pages using Tabber parser tag)
    This element does not appear in railML® 3.1 within the IL subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further
    5 KB (599 words) - 14:26, 27 May 2022
  • IL:activationCondition (category Pages using Tabber parser tag)
    conditions to conclude a train is approaching the level crossing. In first case this happens when the train crosses a detection point, i.e. an insulated
    4 KB (465 words) - 12:14, 30 May 2020
  • IL:relatedMovableElement (category Pages using Tabber parser tag)
    for element IL:relatedMovableElement of railML® version 3.2 UML-visualization of IL Documentation reference to other movable element in case of single/double
    524 bytes (5 words) - 18:47, 19 December 2019
  • Automatic Schemaexport for Element derailerIL
    4 KB (5 words) - 14:21, 24 January 2020
  • not in use. (optional; xs:string) Possible values: upleft-rightdown downleft-rightup, maxThrowTime: Maximum time in milliseconds during which the IL can drive
    4 KB (5 words) - 14:21, 24 January 2020
  • IL:routeEntry (category Pages using Tabber parser tag)
    <refersTo> – This is the reference to the start element of the route. In most cases this is a signal. Preferable the reference shall be made to the element with
    1 KB (151 words) - 20:08, 29 January 2020
  • IL:routeSequence (category Pages using Tabber parser tag)
    This element does not appear in railML® 3.1 within the IL subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further
    516 bytes (38 words) - 21:53, 25 April 2022
  • IL:derailerIL/3.2 (category Missing Attribute Documentation/IL)
    Automatic Schemaexport for Element derailerIL
    5 KB (5 words) - 12:41, 8 February 2024
  • IL:movableCrossing/3.2 (category Missing Attribute Documentation/IL)
    throwing adds a delay to route setting that is of great interest to the use case simulation. For this purpose, we add an attribute typicalThrowTime that allows
    5 KB (5 words) - 12:41, 8 February 2024
  • IL:dangerPoint (category Pages using Tabber parser tag)
    point is located. It is used when the danger point is situated in the middle of a TVD section or beyond any TVD section in case of not supervised tracks
    2 KB (232 words) - 20:39, 29 January 2020
  • IL:combinedRoute (category Pages using Tabber parser tag)
    element in internal lists of engineering data. @id - The unique identifier used to reference this element within railML. @priorityRank – The positive integer
    3 KB (348 words) - 12:05, 28 May 2022
  • IL:hasLevelCrossingType (category Pages using Tabber parser tag)
    deactivated only from interlocking independently of the direction. This is the case for level crossings within stations. The level crossing is activated by route
    3 KB (405 words) - 15:31, 29 October 2023
  • Autoexport from the XML-Schema for element IL:tvdSection of railML® version 3.1 UML-visualization of IL Documentation track vacancy detection (TVD) section
    2 KB (5 words) - 14:21, 24 January 2020
  • IL:situatedAtTrackAsset (category Pages using Tabber parser tag)
    Autoexport from the XML-Schema for element IL:situatedAtTrackAsset of railML® version 3.2 UML-visualization of IL Documentation This is the reference to the
    523 bytes (5 words) - 18:51, 19 December 2019
  • Dev:Wiki Documentation Guidelines (category Pages using Tabber parser tag) (section Use cases)
    The railML® wiki offers a number of Use Cases. A Guideline to implementing Use Cases can be found under Dev:Use cases. In contrast to railML® 2, railML®
    12 KB (1,475 words) - 15:28, 15 April 2024
  • Autoexport from the XML-Schema for element IL:tvdSection of railML® version 3.2 UML-visualization of IL Documentation track vacancy detection (TVD) section
    3 KB (5 words) - 12:41, 8 February 2024
  • IL:initStatus (category Pages using Tabber parser tag)
    element IL:initStatus of railML® version 3.2 UML-visualization of IL Documentation The initial status of commands and messages on the interface in case of "cold
    513 bytes (0 words) - 18:48, 19 December 2019
  • IL:routeStatusIndicator (category Pages using Tabber parser tag)
    This element does not appear in railML® 3.1 within the IL subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further
    2 KB (200 words) - 13:21, 28 May 2022
  • Automatic Schemaexport for Element levelCrossingIL
    3 KB (5 words) - 14:21, 24 January 2020
  • IL:hasAspect (category Pages using Tabber parser tag)
    the train using its horn or bell. Use the values warning or caution instead for aspects of distant signals or indicators. This aspect is used for announcing
    8 KB (1,085 words) - 10:48, 10 November 2023
  • Automatic Schemaexport for Element levelCrossingIL
    4 KB (5 words) - 12:41, 8 February 2024
  • aspectk). Other functional classes can make use of these tuples. The using of the state space is twofold: direct use of (asset, state) tuples with class assetAndState
    5 KB (562 words) - 11:57, 30 May 2020
  • IL:hasConfiguration (category Pages using Tabber parser tag)
    information. The configuration example below just shows the use of the attributes without using realistic values especially for @model and @SWversion. <hasConfiguration
    3 KB (385 words) - 14:00, 21 August 2021
  • IL:branchTip (category Pages using Tabber parser tag)
    This element does not appear in railML® 3.1 within the IL subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further
    512 bytes (38 words) - 21:51, 25 April 2022
  • IL:refersToInfrastructureElement (category Pages using Tabber parser tag)
    This element does not appear in railML® 3.1 within the IL subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further
    532 bytes (38 words) - 21:53, 25 April 2022
  • IL:etcsGeneralData (category Pages using Tabber parser tag)
    This element does not appear in railML® 3.1 within the IL subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further
    518 bytes (38 words) - 21:53, 25 April 2022
  • conflictingOverlap: This value is set in case of the overlap of either route causes the conflict. conflictingStatus: This value is used in case the status of any element
    2 KB (5 words) - 12:42, 8 February 2024
  • Automatic Schemaexport for Element signalIL
    7 KB (5 words) - 12:41, 8 February 2024
  • Autoexport from the XML-Schema for element IL:hasTVDresetStrategy of railML® version 3.2 UML-visualization of IL Documentation Classification of TVD section
    2 KB (5 words) - 12:42, 8 February 2024
  • system in which case this attribute should be omitted. (optional; xs:boolean), priorityRank: Gives the priority of the route path in case there are several
    4 KB (5 words) - 12:42, 8 February 2024
  • onBeforeDangerPoint> <objectName> <situatedAtTrackAsset> <derailersIL> <derailerIL> <assetName> <belongsToOperationalPoint> <connectedToPowerSupply> <designator>
    188 KB (2,767 words) - 13:38, 4 December 2023
  • the tip branch. Especially in case of switch crossing this element is not used. Subschema interlocking Parents* switchIL Children None Attributes: ref:
    844 bytes (5 words) - 21:51, 25 April 2022
  • element IL:initStatus of railML® version 3.2 UML-visualization of IL Documentation The initial status of commands and messages on the interface in case of "cold
    846 bytes (5 words) - 16:17, 5 March 2021
  • element IL:initStatus of railML® version 3.1 UML-visualization of IL Documentation The initial status of commands and messages on the interface in case of "cold
    846 bytes (5 words) - 18:48, 19 December 2019
  • for element IL:routeExit of railML® version 3.1 UML-visualization of IL Documentation Description of the route destination point. In most cases the route
    1,018 bytes (5 words) - 14:22, 24 January 2020
  • Autoexport from the XML-Schema for element IL:situatedAtTrackAsset of railML® version 3.2 UML-visualization of IL Documentation This is the reference to the
    920 bytes (5 words) - 16:18, 5 March 2021
  • Autoexport from the XML-Schema for element IL:situatedAtTrackAsset of railML® version 3.1 UML-visualization of IL Documentation This is the reference to the
    919 bytes (5 words) - 18:19, 23 December 2019
  • for element IL:relatedMovableElement of railML® version 3.2 UML-visualization of IL Documentation reference to other movable element in case of single/double
    890 bytes (5 words) - 16:16, 5 March 2021
  • for element IL:relatedMovableElement of railML® version 3.1 UML-visualization of IL Documentation reference to other movable element in case of single/double
    889 bytes (5 words) - 14:21, 24 January 2020
  • Autoexport from the XML-Schema for element IL:refersToInfrastructureElement of railML® version 3.2 UML-visualization of IL Documentation The reference to an element
    935 bytes (5 words) - 21:53, 25 April 2022
  • Autoexport from the XML-Schema for element IL:combinedRoute of railML® version 3.2 UML-visualization of IL Documentation a concatenation of single routes
    2 KB (5 words) - 12:42, 8 February 2024
  • Autoexport from the XML-Schema for element IL:routeSequence of railML® version 3.2 UML-visualization of IL Documentation RouteSequence is a combination
    2 KB (5 words) - 12:42, 8 February 2024
  • for element IL:routeExit of railML® version 3.2 UML-visualization of IL Documentation Description of the route destination point. In most cases the route
    1 KB (5 words) - 12:42, 8 February 2024
  • IL:radioBlockCenter (category Pages using Tabber parser tag)
    This element does not appear in railML® 3.2 within the IL subschema. It is available only in railML® . Do not hesitate to contact railML.org for further
    5 KB (671 words) - 05:46, 18 April 2022
  • XML-Schema for element IL:routeStatusIndicator of railML® version 3.2 UML-visualization of IL Documentation virtual logical object used for indication of route
    1 KB (5 words) - 12:41, 8 February 2024
  • Autoexport from the XML-Schema for element IL:route of railML® version 3.1 UML-visualization of IL Documentation path for train movements in railway network
    3 KB (5 words) - 14:22, 24 January 2020
  • Autoexport from the XML-Schema for element IL:etcsGeneralData of railML® version 3.2 UML-visualization of IL Documentation list of main ETCS variables of
    2 KB (5 words) - 12:42, 8 February 2024
  • IL:etcs (category Pages using Tabber parser tag)
    This element does not appear in railML® 3.2 within the IL subschema. It is available only in railML® . Do not hesitate to contact railML.org for further
    2 KB (329 words) - 08:04, 8 May 2021
  • Autoexport from the XML-Schema for element IL:hasLevelCrossingType of railML® version 3.2 UML-visualization of IL Documentation Classification of basic level
    2 KB (5 words) - 12:42, 8 February 2024
  • element IL:hasAspect of railML® version 3.2 UML-visualization of IL Documentation Classification of signal aspects. Subschema interlocking Parents* usesTypes
    3 KB (5 words) - 12:42, 8 February 2024
  • is implemented using relations with a navigability attribute (in the The RailTopoModel® wiki). The condensed relations matrix for this case is presented
    18 KB (2,052 words) - 18:20, 15 April 2024
  • <designator> <isLimitedBy> <signalsIL> <signalIL> <any> <designator> <protectsBlockExit> <refersTo> <switchesIL> <switchIL> <any> <branchLeft> <branchRight>
    125 KB (1,906 words) - 03:09, 26 October 2023
  • the railML® website). Codelists are intended to address certain frequently used entities with a single code, as to avoid repetitious work as well as ambiguity
    17 KB (299 words) - 15:10, 7 December 2023