Search results

Jump to navigation Jump to search
  • IL:movableCrossing (category Pages using Tabber parser tag)
    crossing whether this is physically needed or not. Subsequently the crossing as represented in the interlocking can have a position. In case of switch actuators
    15 KB (1,510 words) - 19:13, 14 February 2022
  • and Rostering   Related subschemas: IS RS  Reported by: PSI For general information on use cases see UC:Use cases
    6 KB (691 words) - 13:28, 13 March 2023
  • UC:TT:FGIInTrain (category Use case (TT)) (section Use case / Anwendungsfall)
    <rostering> is included, the element <rollingstock> is also required The elements <infrastructure> and <rollingstock> are master data for the use case "passenger
    9 KB (677 words) - 18:10, 27 June 2022
  • UC:TT:ExchangeOfFormationData (category Use case (TT)) (section Use case / Anwendungsfall)
    commercial train elements.) A better modelling for this aspect is, in the author’s opinion, to use the concept of commercial trains in a different way than currently
    6 KB (688 words) - 13:26, 13 March 2023
  • UC:IL:InterlockingEngineering (category Use case (IL)) (section Use case / Anwendungsfall)
    exchange format. This use case concerns the exchange of engineering data for tailoring an interlocking to fit a station. This use case focuses on "legacy"
    11 KB (828 words) - 13:25, 13 March 2023
  • IL:reasonForConflict (category Pages using Tabber parser tag)
    value is used in case any signal that shall provide flank/head protection to either route is used as route destination for the other route, which is excluded
    520 bytes (9 words) - 18:50, 19 December 2019
  • Dev:Use case example/old (category Use case (unknown subschema)) (section Use case / Anwendungsfall)
    good use case. For an actual example see UC:IS:Schematic Track Plan. To get more information on use cases and how to describe them, see Dev:Use cases. Please
    2 KB (220 words) - 16:25, 4 December 2023
  • UC:IL:HardwareAndCablePlan (category Use case (IL)) (section Use case / Anwendungsfall)
    Information Category: Topology (origin: railML IS schema or classic track plan) Cable plan (origin: railML IS schema or classic track plan) infrastructure
    1 KB (119 words) - 13:51, 13 March 2023
  • UC:IL:EulynxDataPreparationInterlocking (category Use case (IL))
    reflect the as-built situation. Please refer to the linked use cases that cover the Eulynx use case. For detailed information please refer to the website https://eulynx
    3 KB (450 words) - 17:54, 27 June 2022
  • IS:baliseGroup (category Pages using Tabber parser tag)
    regular accuracy towards the measured location is +/- 5m (locationAccuracy="5"). UNISIG-baseline 3 is in use (mVersion="32"). Corresponding railML® description:
    19 KB (2,555 words) - 16:55, 18 January 2024
  • IL:interlocking (category Pages using Tabber parser tag)
    register used. In case there is no officially used register the project-specific one shall be named with a leading underscore. The @id attribute is the “machine
    4 KB (493 words) - 10:38, 31 May 2021
  • The most normal in Norway is that whenever a change is made to the signalling system, the entire station is updated. This is defined as one interlocking
    5 KB (558 words) - 13:53, 13 March 2023
  • working data Typically, the import is done manually using a file based interface. Common Infrastructure: the import uses elements from mesoscopic and macroscopic
    3 KB (355 words) - 18:11, 27 June 2022
  • signalkontrollierte Warnsysteme An SCWS is a system used to warn working gangs on used tracks that a train is arriving and that they have to stop their
    4 KB (571 words) - 13:51, 13 March 2023
  • IS:mileageChange (category Pages using Tabber parser tag)
    This element does not appear in railML® 3.1 within the IS subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further
    2 KB (228 words) - 13:18, 17 April 2024
  • features and therefore is not designed backward compatible. The most fundamental difference is difficult to recognize at the surface: It is based on RailTopoModel®
    3 KB (403 words) - 15:46, 15 April 2024
  • UC:TT:IntegratedTMS (category Use case (TT)) (section Use case / Anwendungsfall)
    about restrictions concerning the infrastructure shall not be part of this use case ITMS. On the other hand a restriction of the infrastructure can be the
    16 KB (1,744 words) - 18:21, 13 May 2024
  • IL:tvdSection (category Pages using Tabber parser tag)
    section. It shall be used in case @isBerthingTrack is set to true. Within the simple example there are different kind of TVD sections. Here is a platform track
    7 KB (829 words) - 15:11, 27 May 2022
  • UC:IL:OperationAndControl (category Use case (IL)) (section Use case / Anwendungsfall)
    interlockings has to be incorporated into the operation and control systems. They uses the interlocking to operate elements get element status schedule and manage
    2 KB (209 words) - 13:52, 13 March 2023
  • RTM:anchor (category Pages using Tabber parser tag)
    <IS:mileageChange> page for the alternative approach, relevant for when there is a need for an explicit IS element. See the discussion in forum. Below you can see the source
    3 KB (269 words) - 17:11, 19 April 2024
  • value is used in case any signal that shall provide flank/head protection to either route is used as route destination for the other route, which is excluded
    2 KB (5 words) - 12:42, 8 February 2024
  • Attributes: preferredPosition: This is the preferred position of the switch which it is switched to when not in use or in case of both positions required for
    4 KB (5 words) - 14:21, 24 January 2020
  • position. Switch throwing adds a delay to route setting that is of great interest to the use case simulation. For this purpose, we add an attribute typicalThrowTime
    4 KB (5 words) - 14:21, 24 January 2020
  • position. Switch throwing adds a delay to route setting that is of great interest to the use case simulation. For this purpose, we add an attribute typicalThrowTime
    4 KB (5 words) - 14:21, 24 January 2020
  • (line 2) It is recommended to use the XML comments for non-content related documentation, e.g. contact information: <!-- ... --> (line 4) It is recommended
    23 KB (2,659 words) - 09:51, 1 June 2022
  • Attributes: preferredPosition: This is the preferred position of the switch which it is switched to when not in use or in case of both positions required for
    5 KB (5 words) - 12:41, 8 February 2024
  • do not want to use an URL (Uniform Ressource Locator (external link)) as an identifier - since there is no real location - you can use any other Uniform
    7 KB (985 words) - 10:01, 1 June 2022
  • default namespace that is usually set to railML, an xsi:type attribute is necessary to indicate which particular type is meant. This is demonstrated above
    18 KB (2,309 words) - 14:28, 1 August 2022
  • certification is mandatory since the release of railML 2.2, all tools in productive use shall use *.railml for files / exports. *.xml is always allowed
    11 KB (1,742 words) - 18:13, 29 November 2023
  • position. Switch throwing adds a delay to route setting that is of great interest to the use case simulation. For this purpose, we add an attribute typicalThrowTime
    5 KB (5 words) - 12:41, 8 February 2024
  • position. Switch throwing adds a delay to route setting that is of great interest to the use case simulation. For this purpose, we add an attribute typicalThrowTime
    5 KB (5 words) - 12:41, 8 February 2024
  • IL:route (category Pages using Tabber parser tag)
    route definition is shown in the extract. It is a main route, which is not automatically set after first use. The time for route locking is given as 1 sec
    9 KB (1,077 words) - 08:15, 7 May 2022
  • IL:levelCrossingIL (category Pages using Tabber parser tag)
    @maximumClosedTime – This is the time a level crossing is accepted by the interlocking as constantly closed before an alarm is raised. The value is needed by some
    18 KB (1,997 words) - 15:11, 4 June 2022
  • <rollingstock>, <timetable>. This attribute is to be used for the version number of the railML® schema the XML file is based on. Major, minor and corrigendum
    9 KB (1,043 words) - 11:28, 15 February 2023
  • state is required. should – The state is the preferred one and should be used if possible (recommendation). must – The state must be used in any case (obligation)
    5 KB (613 words) - 01:23, 16 May 2024
  • IL:keyLockIL (category Pages using Tabber parser tag)
    them is the key securely locked in and the other with the key released for removal. The key is a simple mean of authorisation transfer as its use allows
    4 KB (531 words) - 19:18, 29 January 2020
  • IS:balise (category Missing Element Documentation/IS)
    of the balises. Conclusion: The use of railML® <balise> elements is optional. But if railML® <balise> elements are used, then the railML® <baliseGroup>
    8 KB (900 words) - 17:31, 11 April 2024
  • IL:signalIL (category Pages using Tabber parser tag)
    release speed is a speed limit under which the train is allowed to run towards this signal, when the target speed is zero. This release speed is independent
    9 KB (1,314 words) - 10:15, 19 May 2023
  • IL:key (category Pages using Tabber parser tag)
    hardware key that is related to physical lock. @isPhysical – The Boolean value gives indication whether the key is of physical type for use in a mechanical
    964 bytes (88 words) - 19:16, 29 January 2020
  • if the register is generally applicable and in practical use and maintenance by the registry is guaranteed. The further procedure is explained on the
    13 KB (721 words) - 14:12, 9 October 2023
  • allows actualizing the codelists in very short cycles. The concept of codelists is explained here. The codelist consists of clearance gauge standards (external
    6 KB (294 words) - 14:03, 7 December 2023
  • cycles. The concept of codelists is explained here. The list contains train protection systems (). The root element is named <trainProtectionSystems>. It
    11 KB (422 words) - 15:50, 16 November 2022
  • IL:signalIndicator (category Pages using Tabber parser tag)
    unique identifier used to reference this element within railML. @indicatorType - There is currently only cautiousDriving defined for use. Other values might
    2 KB (240 words) - 13:40, 28 May 2022
  • IL:permissionZone (category Pages using Tabber parser tag)
    defining the zone is different. <canBeControlledBy> – This is the reference to any controller, i.e. operator/train dispatcher place, which can use the zone for
    1 KB (151 words) - 19:42, 29 January 2020
  • IL:implementsSignalplan (category Pages using Tabber parser tag)
    and the slave is the start signal of the route. In case of signalling with stand-alone distant signals there is no master and the slave is the start signal
    17 KB (1,655 words) - 17:19, 30 January 2020
  • IL:genericDetector (category Pages using Tabber parser tag)
    self-test of the detector. It has to be used in combination with @triggeredSelfTest. <detectorType> – This is the reference to the particular type of the
    2 KB (218 words) - 19:17, 29 January 2020
  • element documentation using Template:Semcon, with status=proposed. Please also add the proposal to the list below! If a consensus is reached in the forum
    4 KB (579 words) - 16:49, 13 March 2023
  • IL:trainNumberField (category Pages using Tabber parser tag)
    a border, i.e. there is at one side no neighbouring section visible. @usedForDirection - The direction for which the field is used. This can be either both
    3 KB (348 words) - 13:08, 28 May 2022
  • towards the derailer when the derailer is in passablePosition. In such case the use of <hasPositionRestriction> is required. singleSwitchCrossing – works
    6 KB (912 words) - 14:29, 27 May 2022
  • IL:movableBridge (category Pages using Tabber parser tag)
    <movableBridge> an <underCrossing> is seen, where a railway line is passed underneath by a waterway. This bridge is normally locked in the position for
    3 KB (405 words) - 15:00, 27 May 2022
View ( | ) (20 | 50 | 100 | 250 | 500)