Template:UC:Use cases/table: Difference between revisions

From railML 3 Wiki
Jump to navigation Jump to search
[unchecked revision][checked revision]
(+Last edit)
(Undo revision 8769 by RailML Coord Documentation (talk))
Tag: Undo
 
(46 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{| class="wikitable sortable"
{| class="wikitable sortable"
|-
|-
! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(lowest)</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(highest)</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! style="width:15%"|Description (FR) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[UC:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span> !! Edited
! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(lowest)</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(highest)</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[UC:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span> !! Edited
|-
|-
|IL
|IL
Line 8: Line 8:
|3.2
|3.2
|X
|X
| [[UC:IL:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated
|[[UC:IL:InterlockingEngineering|Interlocking module engineering data <br/> ''(former: Interlocking engineering)'']]
|{{edited|UC:IL:Simulation}}
|{{Deu|Stellwerksprojektierung}}
|-
|IMED
|IL
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color>
|
|model
|3.1
|3.2
| X || [[UC:IL:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[UC:IL:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[UC:IL:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated
|{{edited|UC:IL:InterlockingEngineering}}
|{{edited|UC:IL:InterlockingEngineering}}
|-
|-
|IS
|{{anchor|NEST}}IS
|
|
|3.1
|3.1
|3.2
|3.2
|X
|X
|[[UC:IS:Schematic Track Plan|Schematic Track Plan]]
|[[UC:IS:NetworkStatement|Network statement of an infrastructure manager]]
|{{Deu|Schematische Gleisplandarstellung}}
|{{Deu|Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers}}
|{{Fra|Plan du tracé schématique}}
|NEST
|SCTP
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/szdc.html Správa železnic] (former: SŽDC) / [https://www.railml.org/en/introduction/partners/detail/prorail.html ProRail] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR]</font color>
|JBD/BaneNOR
|model
|consolidated
|{{edited|UC:IS:NetworkStatement}}
|{{edited|UC:IS:Schematic Track Plan}}
|-
|-
|IS
|IS
|
|RS
|3.1
|3.1
|3.2
|3.2
Line 38: Line 34:
|[[UC:IS:RINFReporting|RINF Reporting]]
|[[UC:IS:RINFReporting|RINF Reporting]]
|{{Deu|RINF Meldung}}
|{{Deu|RINF Meldung}}
|{{Fra|Rapports RINF}}
|RINR
|RINR
|SNCF Réseau
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/sncf-reseau.html SNCF Réseau]</font color>
|merged into [[#NEST|NEST]]
|merged into [[UC:IS:NetworkStatement|NEST]]
|{{edited|UC:IS:RINFReporting}}
|{{edited|UC:IS:RINFReporting}}
|-
|-
|{{anchor|NEST}}IS
|IL
|
|IS
|3.1
|3.1
|3.2
|3.2
|X
|X
|[[UC:IS:NetworkStatement|Network statement of an infrastructure manager]]
|[[UC:IL:Simulation|Routes for timetable simulation <br/> ''(former: Capacity operational simulation)'']]
|{{Deu|Schie&shy;nen&shy;netz&shy;be&shy;nut&shy;zungs&shy;be&shy;din&shy;gun&shy;gen eines Infrastrukturbetreibers}}
|{{Deu|Fahrstrassen für Fahrplan simulieren <br/> ''(ehemals: Leistungsfähigkeit Simulation)''}}
|{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}}
|RSIM
|NEST
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/jernbanedirektoratet.html Jernbanedirektoratet] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR] <br />(former: Jernbanedirektoratet Capacity Dpt)</font color>
|SŽDC/&#8203;ProRail/&#8203;BaneNOR
|model
|consolidated
|{{edited|UC:IL:Simulation}}
|{{edited|UC:IS:NetworkStatement}}
|-
|-
|TT
|IS
|
|IL
|3.2
|3.1
|3.2
|3.2
|X
|X
|[[UC:TT:PassengerInformationAtStations|Passenger information at stations]]
|[[UC:IS:Schematic Track Plan|Schematic Track Plan]]
|{{Deu|Fahrgastinformation am Bahnhof }}
|{{Deu|Schematische Gleisplandarstellung}}
|{{Fra|Information voyageurs en station}}
|SCTP
|
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/jernbanedirektoratet.html Jernbanedirektoratet] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR]</font color>
|<font color="green">writer: PSI (20.05.15)</font color>; <font color="green">reviewer: Init</font color>
|model
|consolidated
|{{edited|UC:IS:Schematic Track Plan}}
|{{edited|UC:TT:PassengerInformationAtStations}}
|-
|-
|IS
|IS
Line 77: Line 70:
|[[UC:IS:IntegratedTMS|Integrated TMS]]
|[[UC:IS:IntegratedTMS|Integrated TMS]]
|{{Deu|Integriertes Verkehrsmanagement}}
|{{Deu|Integriertes Verkehrsmanagement}}
|{{Fra|-}}
|ITMS
|ITMS
|Bombardier
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/bombadier-transportation.html Bombardier Transportation]</font color>
|draft
|model
|{{edited|UC:IS:IntegratedTMS}}
|{{edited|UC:IS:IntegratedTMS}}
|-
|-
Line 91: Line 83:
|
|
|
|
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color>
|model
|{{edited|UC:TT:TrafficManagementPlan}}
|-
|rowspan="4"|IS
|rowspan="4"|IL
|rowspan="4"|3.2
|rowspan="4"|3.2
|rowspan="4"|X
|[[UC:IS:ETCS track net|ETCS track net]]
|{{Deu|ETCS Streckenatlas}}
|ETCS
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color>
|model
|{{edited|UC:IS:ETCS track net}}
|- class="expand-child"
|[[UC:IS:ETCS track net|ETCS track net: Input for Detailed Design of ETCS Trackside]]
|{{Deu|ETCS Streckenatlas: Übergabe der allgemeingültigen Streckendateninformationen (vom Netzbetreiber an den Lieferanten)}}
|ETCS-a
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color>
|model
|{{edited|UC:IS:ETCS track net}}
|- class="expand-child"
|[[UC:IS:ETCS track net|ETCS track net: Output of Detailed Design of ETCS Trackside]]
|{{Deu|ETCS Streckenatlas: Übergabe der Ergebnisdaten der Projektierung (vom Lieferanten an den Netzbetreiber)}}
|ETCS-b
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color>
|model
|{{edited|UC:IS:ETCS track net}}
|- class="expand-child"
|[[UC:IS:ETCS track net|ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement]]
|{{Deu|ETCS Streckenatlas: Aktualisierung der Streckendaten vor Balisengruppenplatzierung}}
|ETCS-c
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color>
|model
|{{edited|UC:IS:ETCS track net}}
|-
|TT
|IS, RS
|3.2
|3.2
|X
|[[UC:TT:PassengerInformationAtStations|Passenger information at stations]]
|{{Deu|Fahrgastinformation am Bahnhof}}
|
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/psi-transcom.html PSI Transcom] (20. 05. 15)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/initplan-karlsruhe.html init]</font color>
|model
|{{edited|UC:TT:PassengerInformationAtStations}}
|-
|rowspan="4"|TT
|rowspan="4"|IS, RS, IL
|rowspan="4"|3.3
|rowspan="4"|
|rowspan="4"|1
|[[UC:TT:RunTimeCalculationInput|Run Time Calculation Input Data]]
|{{Deu|Eingangsdaten für die Fahrzeitrechnung}}
|RTCI
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/jernbanedirektoratet.html Jernbanedirektoratet] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR]</font color>
|consolidated
|{{edited|UC:TT:RunTimeCalculationInput}}
|- class="expand-child"
|[[UC:TT:RunTimeCalculationInput|Run Time Calculation Input Data – Infrastructure properties]]
|{{Deu|Eingangsdaten für die Fahrzeitrechnung - Infrastruktur Eigenschaften}}
|RTCI-a
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/jernbanedirektoratet.html Jernbanedirektoratet]</font color>
|draft
|
|-
|[[UC:TT:RunTimeCalculationInput|Run Time Calculation Input Data – Rolling stock properties]]
|{{Deu|Eingangsdaten für die Fahrzeitrechnung - Fahrzeug Eigenschaften}}
|RTCI-b
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/jernbanedirektoratet.html Jernbanedirektoratet]</font color>
|draft
|
|
|<font color="red">writer: Thales</font color>; <font color="red">reviewer: ???</font color>
|-
|[[UC:TT:RunTimeCalculationInput|Run Time Calculation Input Data – Timetable properties]]
|{{Deu|Eingangsdaten für die Fahrzeitrechnung - Fahrplan Eigenschaften}}
|RTCI-c
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/jernbanedirektoratet.html Jernbanedirektoratet]</font color>
|draft
|draft
|{{edited|UC:TT:TrafficManagementPlan}}
|
|-
|-
|IS
|TT
|IS, RS
|3.3
|
|
|1
|[[UC:TT:LongTermCirculationPlanning|Long Term Circulation Planning]]
|Langfristige Umlaufplanung
|LTCP
|reporter: {{external|http://ivu.de|IVU|mode=silent}}<br>writer & reviewer: {{site|http://railml.org|TT developer group|mode=silent}}
|draft
|{{edited|UC:TT:LongTermCirculationPlanning}}
|-
|TT
|RS, IS
|
|
|
|
Line 103: Line 184:
|[[UC:IS:PassengerInformationSystem|Passenger Information System]]
|[[UC:IS:PassengerInformationSystem|Passenger Information System]]
|{{Deu|Fahrgast-Informationssystem}}
|{{Deu|Fahrgast-Informationssystem}}
|{{Fra|Système d'information voyageurs}}
|PISY
|PISY
|
|
Line 109: Line 189:
|{{edited|UC:IS:PassengerInformationSystem}}
|{{edited|UC:IS:PassengerInformationSystem}}
|-
|-
|IS
|TT
|IS, IL, RS
|
|
|
|
|
|
|2
|[[UC:TT:FGIInTrain|Passenger information inside the train]]
|[[UC:IS:Track Geometry|Track Geometry]]
|{{Deu|Fahrgastinformation im Zug}}
|{{Deu|Gleisgeometrie}}
|
|
|TRGE
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/interautomation.html Interautomation] (17. 01. 17)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/psi-transcom.html PSI Transcom] and [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP]</font color>
|ÖBB Infrastruktur
|draft
|review
|{{edited|UC:TT:FGIInTrain}}
|{{edited|UC:IS:Track Geometry}}
|-
|-
|IS
|TT
|TT
|IS, RS
|
|
|
|
|2
|[[UC:IS:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|{{Deu|Fahrerassistenzsystem}}
|{{Fra|Système d'assistance au conducteur (DAS)}}
|DASY
|IS
|draft
|{{edited|UC:IS:DriverAdvisorySystem}}
|-
|IS
|
|
|[[UC:TT:ATimetableForACompetition|A timetable for a competition (call for proposals)]]
|{{Deu|Ausschreibungsfahrplan}}
|
|
|
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP] (21. 05. 15)</font color>; <br /> <font color="green">reviewer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies] (22. 09. 16)</font color>
|2
|consolidated
|[[UC:IS:RailwayInfrastructureRecording|Railway Infrastructure Recording]]
|{{edited|UC:TT:ATimetableForACompetition}}
|{{Deu|Erfassung der Schieneninfrastruktur}}
|{{Fra|Enregistrement des infrastructures ferroviaires}}
|ISRC
|Bahnkonzept
|draft
|{{edited|UC:IS:RailwayInfrastructureRecording}}
|-
|-
|IS
|TT
|IS, RS, CO
|
|
|
|
|
|
|3
|[[UC:TT:AdoptVehicleWorkingSchedulingToTimetableChanges|Adopt vehicle working scheduling to timetable changes]]
|[[UC:IS:PositioningAndMap-Matching|Positioning and Map-Matching]]
|{{Deu|Umlauf an Jahresfahrplan anpassen}}
|{{Deu|Positionierung und Kartenvergleich}}
|{{Fra|Positionnement et correspondance avec la carte}}
|POSI
|
|
|draft
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies] (21. 05. 15)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft]</font color>
|{{edited|UC:IS:PositioningAndMap-Matching}}
|consolidated
|{{edited|UC:TT:AdoptVehicleWorkingSchedulingToTimetableChanges}}
|-
|-
|IS
|TT
|RS, IS
|
|
|
|
|
|
|3
|[[UC:TT:DutyShiftsPersonnelRoster|Duty planning and staff shifts]]
|[[UC:IS:Asset status representation|Asset status representation]]
|{{Deu|Dienstplanung und Personalschichten}}
|{{Deu|Darstellung des Infrastrukturzustands}}
|SHFT
|{{Fra|Représentation de l'actif}}
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/oebb-personenverkehr.html ÖBB Personenverkehr]</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/initplan-karlsruhe.html init]</font color>
|ASSR
|consolidated
|DLR for IN2Rail project
|{{edited|UC:TT:DutyShiftsPersonnelRoster}}
|draft
|{{edited|UC:IS:Asset status representation}}
|-
|-
|IS
|TT
|IS, RS
|
|
|
|
|
|
|3
|[[UC:TT:ExchangeOfFormationData|Exchange of formation data]]
|[[UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]]
|{{Deu|Austausch von Wagenreihungen/ Behängungsdaten}}
|{{Deu|Austausch von Planungsparametern für Stellwerke mit Her&shy;stel&shy;lern}}
|
|{{Fra|Échange de paramètres de planification pour l'interconnexion avec les fournisseurs}}
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP] (21. 05. 15)</font color>; <br /> <font color="green">reviewer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies] (22. 09. 16)</font color>
|ISIL
|consolidated
|IS
|{{edited|UC:TT:ExchangeOfFormationData}}
|draft
|{{edited|UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers}}
|-
|-
|IL
|TT
|IS, IL, RS
|
|
|
|
|
|
| 4 || [[UC:IL:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}||  || || draft
|[[UC:TT:LongTermStrategicTimetabling|Long Term Strategic Timetabling]]
|{{edited|UC:IL:OperationAndControl}}
|{{Deu|Langfrist-Fahrplanerstellung}}
|LTST
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/sma-und-partner.html SMA+Partner] (22. 12. 16)</font color>; <br /> <font color="green">reviewer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft] (28. 6. 22)</font color>
|consolidated
|{{edited|UC:TT:LongTermStrategicTimetabling}}
|-
|-
|IS
|TT
|IS, RS
|
|
|
|
|
|
|3
|[[UC:TT:TimetableInformation|Timetable Information]]
|[[UC:IS:MaintenancePlanning|Maintenance Planning]]
|{{Deu|Fahrplanauskunft}}
|{{Deu|Wartungsplanung}}
|TINF
|{{Fra|Planification de la maintenance}}
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft] (13. 03. 15)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies]</font color>
|MAPL
|consolidated, under revision
|
|{{edited|UC:TT:TimetableInformation}}
|draft
|{{edited|UC:IS:MaintenancePlanning}}
|-
|-
|IL
|IS
|–
|
|
|
|
|
|2
| 4 || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
|[[UC:IS:Track Geometry|Track Geometry]]
|{{edited|UC:IL:InterlockEngineeringForSignallingWithinJBV}}
|{{Deu|Gleisgeometrie}}
|TRGE
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/oebb-infrastruktur.html ÖBB Infrastruktur]</font color>
|review
|{{edited|UC:IS:Track Geometry}}
|-
|-
|IL
|IS
|TT, IL, RS
|
|
|
|
|
|3
| 5 || [[UC:IL:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft
|[[UC:IS:Asset status representation|Asset status representation]]
|{{edited|UC:IL:SitePreparationDataForSignalControlledWarningSystems}}
|{{Deu|Darstellung des Infrastrukturzustands}}
|ASSR
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/dlr-braunschweig.html DLR] for IN2Rail project</font color>
|draft
|{{edited|UC:IS:Asset status representation}}
|-
|-
|IS
|IL
|IL
|
|
|
|
|
|
| 6 || [[UC:IL:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft
|[[UC:IS:CADForRailwaySignaling|CAD for railway signaling]]
|{{edited|UC:IL:HardwareAndCablePlan}}
|{{Deu|CAD für Zugsignalisierung}}
|CASP
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/railcomplete.html Railcomplete AS]</font color>
|draft
|{{edited|UC:IS:CADForRailwaySignaling}}
|-
|-
|IS
|IS
|
|IL, TT, RS
|
|
|
|
Line 235: Line 316:
|[[UC:IS:CapacityPlanning|Capacity Planning]]
|[[UC:IS:CapacityPlanning|Capacity Planning]]
|{{Deu|Kapazitätsplanung}}
|{{Deu|Kapazitätsplanung}}
|{{Fra|Planification de la capacité}}
|CAPL
|CAPL
|JBV/BaneNOR
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR] (erstwhile: JBV)</font color>
|draft
|draft
|{{edited|UC:IS:CapacityPlanning}}
|{{edited|UC:IS:CapacityPlanning}}
|-
|-
|IS
|IS
|IL
|
|
|
|3
|[[UC:IS:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]]
|{{Deu|Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen}}
|
|
|
|
|3
|[[UC:IS:NREReporting|NRE Reporting]]
|{{Deu|NRE Meldung}}
|{{Fra|Rapports NRE}}
|NRER
|ÖBB Infrastruktur
|draft
|draft
|{{edited|UC:IS:NREReporting}}
|{{edited|UC:IS:CaptureSchematicVisualisationInformationOfTrackAssets}}
|-
|-
|IS
|IS
|TT, RS
|
|
|
|
|
|2
|3
|[[UC:IS:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|[[UC:IS:Speeddirectory|Speed directory]]
|{{Deu|Fahrerassistenzsystem}}
|{{Deu|Verzeichnis der zulässigen Geschwindigkeiten}}
|DASY
|{{Fra|Liste des vitesses autorisées}}
|<font color="red">writer: [https://www.railml.org/en/introduction/partners/detail/siemens-mo-mm-germany.html Siemens Mobility Germany]?</font color>
|SPED
|ÖBB Infrastruktur
|draft
|draft
|{{edited|UC:IS:Speeddirectory}}
|{{edited|UC:IS:DriverAdvisorySystem}}
|-
|-
|IS
|IS
|IL, RS, TT
|
|
|
|
|
|
|3
|[[UC:IS:ExchangeOfLogicalTrainPositions|Exchange of Logical Train Positions]]
|[[UC:IS:Timetabling|Timetabling]]
|{{Deu|Fahrplanerstellung}}
|{{Fra|horaires}}
|ISTT
|ProRail
|draft
|{{edited|UC:IS:Timetabling}}
|-
|IS
|
|
|
|
|
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/siemens-switzerland.html Siemens Mobility Switzerland]</font color>; <br /> <font color="red">reviewer: ???</font color>
|3
|[[UC:IS:CADForRailwaySignaling|CAD for railway signaling]]
|{{Deu|CAD für Zugsignalisierung}}
|{{Fra|CAD pour la signalisation ferroviaire}}
|CASP
|RailComplete
|draft
|draft
|{{edited|UC:IS:CADForRailwaySignaling}}
|{{edited|UC:IS:ExchangeOfLogicalTrainPositions}}
|-
|-
|IS
|IS
|
|IL
|
|
|
|
|3
|3
|[[UC:IS:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]]
|[[UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]]
|{{Deu|Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen}}
|{{Deu|Austausch von Planungsparametern für Stellwerke mit Her­stel­lern}}
|{{Fra|Capture des informations de visualisation schématique des actifs de la piste}}
|ISIL
|
|<font color="black">writer: IS</font color>
|
|draft
|draft
|{{edited|UC:IS:CaptureSchematicVisualisationInformationOfTrackAssets}}
|{{edited|UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers}}
|-
|-
|IS
|IL
|IS, TT
|
|
|
|
|4
|[[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]]
|{{Deu|Stellwerkstechnik für Signalisierung}}
|
|
|3
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR] (former: Jernbaneverket Signalling Dpt)</font color>
|[[UC:IS:Railway Simulation Laboratory|Railway Simulation Laboratory]]
|{{Deu|Eisenbahnbetriebslabor}}
|{{Fra|Laboratoire de simulation ferroviaire}}
|RLAB
|ČVUT
|draft
|draft
|{{edited|UC:IS:Railway Simulation Laboratory}}
|{{edited|UC:IL:InterlockEngineeringForSignallingWithinJBV}}
|-
|-
|IS
|IS
|RS
|
|
|
|
|3
|[[UC:IS:MaintenancePlanning|Maintenance Planning]]
|{{Deu|Wartungsplanung}}
|MAPL
|
|
|9
|draft
|[[UC:IS:RailwayInfrastructureVisualisation|Railway Infrastructure Visualisation]]
|{{edited|UC:IS:MaintenancePlanning}}
|{{Deu|Visualisierung von Schieneninfrastruktur}}
|{{Fra|Visualisation de l'infrastructure ferroviaire}}
|ISVI
|
|outdated
|{{edited|UC:IS:RailwayInfrastructureVisualisation}}
|-
|-
|IS
|IS
|IL
|
|3.2
|3.2
|X
|[[UC:IS:ETCS track net|ETCS track net]]
|
|
|
|
|ETCS
|3
|Thales
|[[UC:IS:NREReporting|NRE Reporting]]
|{{Deu|NRE Meldung}}
|NRER
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/oebb-infrastruktur.html ÖBB Infrastruktur]</font color>
|draft
|draft
|{{edited|UC:IS:ETCS track net}}
|{{edited|UC:IS:NREReporting}}
|-
|-
|RS
|IL
|IS
|
|
|
|
|4
|[[UC:IL:OperationAndControl|Operation and Control]]
|{{Deu|Betriebsführung}}
|
|
|
|
|[[UC:RS:TractionPowerSupplySimulation|Traction power supply simulation]]
|draft
|{{Deu|Simulation der Bahnstromversorgung}}
|{{edited|UC:IL:OperationAndControl}}
|
|
|
|
|{{edited|UC:RS:TractionPowerSupplySimulation}}
|-
|-
|RS
|RS
|
|IS, TT, IL
|
|
|
|
Line 367: Line 426:
|
|
|
|
|
|draft
|
|{{edited|UC:RS:OperationalSimulation}}
|{{edited|UC:RS:OperationalSimulation}}
|-
|-
|TT
|IS
|RS, IS
|?
|
|
|
|
|
|
|[[UC:TT:DutyShiftsPersonnelRoster|Duty planning and staff shifts]]
|[[UC:IS:PosessionManagement|Posession Management]]
|{{Deu|Dienstplanung und Personalschichten}}
|{{Deu|Daten für Betra und Gleissperrungen}}
|{{Fra|Planification des permanences et affectation du personnel}}
|POMA
|SHFT
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/siemens-mo-mm-germany.html Siemens Mobility Germany] (10. 01. 22)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft]</font color>
|<font color="green">writer: ÖBB Personenverkehr; <br/>reviewer: INIT</font color>
|draft
|consolidated
|{{edited|UC:IS:PosessionManagement}}
|{{edited|UC:TT:DutyShiftsPersonnelRoster}}
|-
|-
|TT
|IS
|–
|
|
|
|
|3
|[[UC:IS:PositioningAndMap-Matching|Positioning and Map-Matching]]
|{{Deu|Positionierung und Kartenvergleich}}
|POSI
|
|
|
|draft
|[[UC:TT:TimetableInformation |Timetable Information]]
|{{edited|UC:IS:PositioningAndMap-Matching}}
|{{Deu|Fahrplanauskunft}}
|{{Fra|Renseignement sur l'horaire}}
|TINF
|<font color="green">writer: HaCon (13.03.15)</font color>; <font color="green">reviewer: IVU</font color>
|consolidated, <i>under revision</i>
|{{edited|UC:TT:TimetableInformation}}
|-
|-
|TT
|IS
|–
|
|
|
|
|
|2
|
|[[UC:IS:RailwayInfrastructureRecording|Railway Infrastructure Recording]]
|[[UC:TT:ATimetableForACompetition|A timetable for a competition (call for proposals)]]
|{{Deu|Erfassung der Schieneninfrastruktur}}
|{{Deu|Ausschreibungsfahrplan}}
|ISRC
|
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/bahnkonzept.html Bahnkonzept]</font color>
|
|draft
|<font color="green">writer: iRFP (21.05.15)</font color>; <font color="green">reviewer: IVU (22.09.16)</font color>
|{{edited|UC:IS:RailwayInfrastructureRecording}}
|consolidated
|{{edited|UC:TT:ATimetableForACompetition}}
|-
|-
|TT
|IS
|IL
|
|
|
|
|
|3
|
|[[UC:IS:Railway Simulation Laboratory|Railway Simulation Laboratory]]
|[[UC:TT:ImportCompleteTimetableForVehicleWorkingSchedulingAndVehicleWorkings|Import complete timetable for vehicle working scheduling and vehicle workings]]
|{{Deu|Eisenbahnbetriebslabor}}
|{{Deu|Umlaufbildung Fahrzeuge Jahresfahrplan}}
|RLAB
|
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/czech-technical-university-prague.html Czech Technical University Prague]</font color>
|
|<font color="green">writer: IVU (20.05.15)</font color>; <font color="red">reviewer: iRFP</font color>
|draft
|draft
|{{edited|UC:TT:ImportCompleteTimetableForVehicleWorkingSchedulingAndVehicleWorkings}}
|{{edited|UC:IS:Railway Simulation Laboratory}}
|-
|-
|TT
|TT
|IS, RS
|
|
|
|
|
|
|[[UC:TT:SlotOrdering|Slot ordering]]
|{{Deu|Trassenbestellung}}
|
|
|[[UC:TT:AdoptVehicleWorkingSchedulingToTimetableChanges|Adopt vehicle working scheduling to timetable changes]]
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/sma-und-partner.html SMA+Partner] (17. 09. 16)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP]</font color>
|{{Deu|Umlauf an Jahresfahrplan anpassen}}
|draft
|
|{{edited|UC:TT:SlotOrdering}}
|
|<font color="green">writer: IVU (21.05.15) </font color>; <font color="green">reviewer: HaCon</font color>
|consolidated
|{{edited|UC:TT:AdoptVehicleWorkingSchedulingToTimetableChanges}}
|-
|-
|TT
|IS
|
|
|
|
|
|
|
|3
|[[UC:TT:ExchangeOfFormationData|Exchange of formation data]]
|[[UC:IS:Speeddirectory|Speed directory]]
|{{Deu|Austausch von Wagenreihungen/ Behängungsdaten}}
|{{Deu|Verzeichnis der zulässigen Geschwindigkeiten}}
|
|SPED
|
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/bombadier-transportation.html Bombardier Transportation]</font color>
|<font color="green">writer: iRFP (21.05.15)</font color>; <font color="green">reviewer: IVU (22.09.16)</font color>
|draft
|consolidated
|{{edited|UC:IS:Speeddirectory}}
|{{edited|UC:TT:ExchangeOfFormationData}}
|-
|-
|TT
|TT
|IS
|
|
|
|
|
|
|
|[[UC:TT:TAF/TAP TSI|TAF/TAP TSI requirements]]
|[[UC:TT:TAF/TAP TSI |TAF/TAP TSI requirements]]
|{{Deu|TAF/TAP TSI Anforderungen}}
|{{Deu|TAF/TAP TSI Anforderungen}}
|
|
|
|<font color="black">writer: [https://www.era.europa.eu/ ERA]</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/bahnkonzept.html Bahnkonzept]</font color>
|<font color="green">writer: ERA</font color>; <font color="red">reviewer: Bahnkonzept</font color>
|draft
|draft
|{{edited|UC:TT:TAF/TAP TSI}}
|{{edited|UC:TT:TAF/TAP TSI}}
|-
|-
|TT
|IS
|IL, TT, RS
|
|
|
|
|
|3
|
|[[UC:IS:Timetabling|Timetabling]]
|[[UC:TT:LongTermStrategicTimetabling |Long Term Strategic Timetabling]]
|{{Deu|Fahrplanerstellung}}
|{{Deu|Langfrist-Fahrplanerstellung}}
|ISTT
|
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/prorail.html ProRail]</font color>
|LTST
|<font color="green">writer: SMA (22.12.16)</font color>; <font color="green">reviewer: HaCon (28.06.22)</font color>
|consolidated
|{{edited|UC:TT:LongTermStrategicTimetabling}}
|-
|TT
|
|
|
|
|[[UC:TT:SlotOrdering |Slot ordering]]
|{{Deu|Trassenbestellung}}
|
|
|<font color="green">writer: SMA (17.09.16)</font color>; <font color="red">reviewer: iRFP</font color>
|draft
|draft
|{{edited|UC:TT:SlotOrdering}}
|{{edited|UC:IS:Timetabling}}
|-
|-
|TT
|IL
|IS
|
|
|
|
|
|
|
|[[UC:IL:HardwareAndCablePlan|Hardware and cable plan]]
|[[UC:TT:FGIInTrain|Passenger information inside the train]]
|{{Deu|Aussenanlage und Kabelplan}}
|{{Deu|Fahrgastinformation im Zug}}
|
|
|
|
|<font color="green">writer: Interautomation (17.01.17)</font color>; <font color="red">reviewer: PSI and iRFP</font color>
|draft
|draft
|{{edited|UC:TT:FGIInTrain}}
|{{edited|UC:IL:HardwareAndCablePlan}}
|-
|-
|IS
|RS
|IL, RS, TT
|IS, TT
|
|
|
|
|
|
|[[UC:IS:ExchangeOfLogicalTrainPositions|Exchange of Logical Train Positions]]
|[[UC:RS:TractionPowerSupplySimulation|Traction power supply simulation]]
|
|{{Deu|Simulation der Bahnstromversorgung}}
|
|
|
|
|<font color="green">writer: Siemens Switzerland</font color>; <font color="red">reviewer: ???</font color>
|draft
|draft
|{{edited|UC:IS:ExchangeOfLogicalTrainPositions}}
|{{edited|UC:RS:TractionPowerSupplySimulation}}
|-
|-
|IS
|IS
Line 519: Line 554:
|
|
|
|
|[[UC:IS:PosessionManagement|Posession Management]]
|[[UC:IS:RailInspectionData|Rail Inspection Data]]
|Daten für Betra und Gleissperrungen
|Schienenprüfdaten
|
|RIND
|POMA
|reporter:{{external|https://www.dzsf.bund.de/DZSF|DZSF|mode=silent}} & {{external|https://zedas.com|ZEDAS|mode=silent}}<br>writer:DZSF
|<font color="green">writer: Siemens Germany (10.01.22)</font color>; <font color="red">reviewer: HaCon</font color>
|draft
|draft
|{{edited|UC:IS:PosessionManagement}}
|{{edited|UC:IS:RailInspectionData}}
|}{{interwiki}}
|}&nbsp;{{interwiki}}

Latest revision as of 15:53, 8 April 2024

Directing Subschema
Involved Subschemas
Implemented in railML® version
(lowest)
Implemented in railML® version
(highest)
Priority
Description (EN) Description (DE)
Abbreviation
Reported by Status
how to interpret the status
Edited
IL IS 3.1 3.2 X Interlocking module engineering data
(former: Interlocking engineering)
Stellwerksprojektierung IMED writer: Thales Germany model March 13th 2023 by User:RailML Coord Documentation
IS 3.1 3.2 X Network statement of an infrastructure manager Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers NEST writer: Správa železnic (former: SŽDC) / ProRail / Bane NOR model April 12th 2024 by User:RailML Orga Ontology
IS RS 3.1 3.2 X RINF Reporting RINF Meldung RINR writer: SNCF Réseau merged into NEST March 13th 2023 by User:RailML Coord Documentation
IL IS 3.1 3.2 X Routes for timetable simulation
(former: Capacity operational simulation)
Fahrstrassen für Fahrplan simulieren
(ehemals: Leistungsfähigkeit Simulation)
RSIM writer: Jernbanedirektoratet / Bane NOR
(former: Jernbanedirektoratet Capacity Dpt)
model December 07th 2023 by User:RailML Orga Ontology
IS IL 3.1 3.2 X Schematic Track Plan Schematische Gleisplandarstellung SCTP writer: Jernbanedirektoratet / Bane NOR model February 13th 2023 by User:RailML Orga Ontology
IS TT, IL 3.2 3.2 X Integrated TMS Integriertes Verkehrsmanagement ITMS writer: Bombardier Transportation model February 13th 2023 by User:RailML Orga Ontology
TT IL, IS, RS 3.2 3.2 X Traffic Management Plan writer: Thales Germany model June 27th 2022 by User:RailML Coord Documentation
IS IL 3.2 3.2 X ETCS track net ETCS Streckenatlas ETCS writer: Thales Germany model June 12th 2023 by User:RailML Coord Infrastructure
ETCS track net: Input for Detailed Design of ETCS Trackside ETCS Streckenatlas: Übergabe der allgemeingültigen Streckendateninformationen (vom Netzbetreiber an den Lieferanten) ETCS-a writer: Thales Germany model June 12th 2023 by User:RailML Coord Infrastructure
ETCS track net: Output of Detailed Design of ETCS Trackside ETCS Streckenatlas: Übergabe der Ergebnisdaten der Projektierung (vom Lieferanten an den Netzbetreiber) ETCS-b writer: Thales Germany model June 12th 2023 by User:RailML Coord Infrastructure
ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement ETCS Streckenatlas: Aktualisierung der Streckendaten vor Balisengruppenplatzierung ETCS-c writer: Thales Germany model June 12th 2023 by User:RailML Coord Infrastructure
TT IS, RS 3.2 3.2 X Passenger information at stations Fahrgastinformation am Bahnhof writer: PSI Transcom (20. 05. 15);
reviewer: init
model March 13th 2023 by User:RailML Coord Documentation
TT IS, RS, IL 3.3 1 Run Time Calculation Input Data Eingangsdaten für die Fahrzeitrechnung RTCI writer: Jernbanedirektoratet / Bane NOR consolidated March 25th 2024 by User:RailML Coord Timetable
Run Time Calculation Input Data – Infrastructure properties Eingangsdaten für die Fahrzeitrechnung - Infrastruktur Eigenschaften RTCI-a writer: Jernbanedirektoratet draft
Run Time Calculation Input Data – Rolling stock properties Eingangsdaten für die Fahrzeitrechnung - Fahrzeug Eigenschaften RTCI-b writer: Jernbanedirektoratet draft
Run Time Calculation Input Data – Timetable properties Eingangsdaten für die Fahrzeitrechnung - Fahrplan Eigenschaften RTCI-c writer: Jernbanedirektoratet draft
TT IS, RS 3.3 1 Long Term Circulation Planning Langfristige Umlaufplanung LTCP reporter: IVU
writer & reviewer: TT developer group
draft December 04th 2023 by User:RailML Coord Documentation
TT RS, IS 2 Passenger Information System Fahrgast-Informationssystem PISY draft March 13th 2023 by User:RailML Coord Documentation
TT IS, IL, RS Passenger information inside the train Fahrgastinformation im Zug writer: Interautomation (17. 01. 17);
reviewer: PSI Transcom and iRFP
draft June 27th 2022 by User:RailML Coord Documentation
TT IS, RS A timetable for a competition (call for proposals) Ausschreibungsfahrplan writer: iRFP (21. 05. 15);
reviewer: IVU Traffic Technologies (22. 09. 16)
consolidated March 13th 2023 by User:RailML Coord Documentation
TT IS, RS, CO Adopt vehicle working scheduling to timetable changes Umlauf an Jahresfahrplan anpassen writer: IVU Traffic Technologies (21. 05. 15);
reviewer: HaCon Ingenieurgesellschaft
consolidated June 27th 2022 by User:RailML Coord Documentation
TT RS, IS Duty planning and staff shifts Dienstplanung und Personalschichten SHFT writer: ÖBB Personenverkehr;
reviewer: init
consolidated July 18th 2022 by User:RailML Coord Documentation
TT IS, RS Exchange of formation data Austausch von Wagenreihungen/ Behängungsdaten writer: iRFP (21. 05. 15);
reviewer: IVU Traffic Technologies (22. 09. 16)
consolidated March 13th 2023 by User:RailML Coord Documentation
TT IS, IL, RS Long Term Strategic Timetabling Langfrist-Fahrplanerstellung LTST writer: SMA+Partner (22. 12. 16);
reviewer: HaCon Ingenieurgesellschaft (28. 6. 22)
consolidated July 18th 2022 by User:RailML Coord Timetable
TT IS, RS Timetable Information Fahrplanauskunft TINF writer: HaCon Ingenieurgesellschaft (13. 03. 15);
reviewer: IVU Traffic Technologies
consolidated, under revision March 13th 2023 by User:RailML Coord Documentation
IS 2 Track Geometry Gleisgeometrie TRGE writer: ÖBB Infrastruktur review April 15th 2024 by User:RailML Coord Documentation
IS TT, IL, RS 3 Asset status representation Darstellung des Infrastrukturzustands ASSR writer: DLR for IN2Rail project draft September 27th 2023 by User:RailML Orga Ontology
IS IL CAD for railway signaling CAD für Zugsignalisierung CASP writer: Railcomplete AS draft December 07th 2023 by User:RailML Orga Ontology
IS IL, TT, RS 3 Capacity Planning Kapazitätsplanung CAPL writer: Bane NOR (erstwhile: JBV) draft March 13th 2023 by User:RailML Coord Documentation
IS IL 3 Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen draft March 13th 2023 by User:RailML Coord Documentation
IS TT, RS 2 Driver Advisory System (DAS) Fahrerassistenzsystem DASY writer: Siemens Mobility Germany? draft March 13th 2023 by User:RailML Coord Documentation
IS IL, RS, TT Exchange of Logical Train Positions writer: Siemens Mobility Switzerland;
reviewer: ???
draft July 18th 2022 by User:RailML Coord Documentation
IS IL 3 Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Her­stel­lern ISIL writer: IS draft March 13th 2023 by User:RailML Coord Documentation
IL IS, TT 4 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung writer: Bane NOR (former: Jernbaneverket Signalling Dpt) draft March 13th 2023 by User:RailML Coord Documentation
IS RS 3 Maintenance Planning Wartungsplanung MAPL draft March 13th 2023 by User:RailML Coord Documentation
IS 3 NRE Reporting NRE Meldung NRER writer: ÖBB Infrastruktur draft March 13th 2023 by User:RailML Coord Documentation
IL IS 4 Operation and Control Betriebsführung draft March 13th 2023 by User:RailML Coord Documentation
RS IS, TT, IL Operational simulation Betriebssimulation draft March 13th 2023 by User:RailML Coord Documentation
IS ? Posession Management Daten für Betra und Gleissperrungen POMA writer: Siemens Mobility Germany (10. 01. 22);
reviewer: HaCon Ingenieurgesellschaft
draft July 18th 2022 by User:RailML Coord Documentation
IS 3 Positioning and Map-Matching Positionierung und Kartenvergleich POSI draft March 13th 2023 by User:RailML Coord Documentation
IS 2 Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC writer: Bahnkonzept draft March 13th 2023 by User:RailML Coord Documentation
IS IL 3 Railway Simulation Laboratory Eisenbahnbetriebslabor RLAB writer: Czech Technical University Prague draft June 27th 2022 by User:RailML Coord Documentation
TT IS, RS Slot ordering Trassenbestellung writer: SMA+Partner (17. 09. 16);
reviewer: iRFP
draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED writer: Bombardier Transportation draft March 13th 2023 by User:RailML Coord Documentation
TT IS TAF/TAP TSI requirements TAF/TAP TSI Anforderungen writer: ERA;
reviewer: Bahnkonzept
draft December 07th 2023 by User:RailML Coord Timetable
IS IL, TT, RS 3 Timetabling Fahrplanerstellung ISTT writer: ProRail draft March 13th 2023 by User:RailML Coord Documentation
IL IS Hardware and cable plan Aussenanlage und Kabelplan draft March 13th 2023 by User:RailML Coord Documentation
RS IS, TT Traction power supply simulation Simulation der Bahnstromversorgung draft March 13th 2023 by User:RailML Coord Documentation
IS Rail Inspection Data Schienenprüfdaten RIND reporter:DZSF & ZEDAS
writer:DZSF
draft December 04th 2023 by User:RailML Coord Documentation