Template:UC:Use cases/table: Difference between revisions
Jump to navigation
Jump to search
[unchecked revision] | [unchecked revision] |
No edit summary |
(DUTY use case added) |
||
Line 49: | Line 49: | ||
|TT | |TT | ||
| | | | ||
| | |3.2 | ||
|1 | |1 | ||
|[[UC:TT:PassengerInformationAtStations|Passenger information at stations]] | |[[UC:TT:PassengerInformationAtStations|Passenger information at stations]] | ||
Line 60: | Line 60: | ||
|IS | |IS | ||
|TT, IL | |TT, IL | ||
| | |3.2 | ||
| | |1 | ||
|[[UC:IS:IntegratedTMS|Integrated TMS]] | |[[UC:IS:IntegratedTMS|Integrated TMS]] | ||
|{{Deu|Integriertes Verkehrsmanagement}} | |{{Deu|Integriertes Verkehrsmanagement}} | ||
Line 71: | Line 71: | ||
|TT | |TT | ||
|IL, IS, RS | |IL, IS, RS | ||
| | |3.2 | ||
| | |1 | ||
|[[UC:TT:TrafficManagementPlan|Traffic Management Plan]] | |[[UC:TT:TrafficManagementPlan|Traffic Management Plan]] | ||
| | | | ||
Line 83: | Line 83: | ||
| | | | ||
| | | | ||
| | |2 | ||
|[[UC:IS:PassengerInformationSystem|Passenger Information System]] | |[[UC:IS:PassengerInformationSystem|Passenger Information System]] | ||
|{{Deu|Fahrgast-Informationssystem}} | |{{Deu|Fahrgast-Informationssystem}} | ||
Line 91: | Line 91: | ||
|draft | |draft | ||
|- | |- | ||
| | |IS | ||
| | | | ||
| | | | ||
| | |2 | ||
|[[UC:IS:Track Geometry|Track Geometry]] | |||
|{{Deu|Gleisgeometrie}} | |||
| | | | ||
| | |TRGE | ||
| | |ÖBB Infrastruktur | ||
|review | |||
|- | |- | ||
|IS | |IS | ||
|TT | |TT | ||
| | | | ||
| | |2 | ||
|[[UC:IS:DriverAdvisorySystem|Driver Advisory System (DAS)]] | |[[UC:IS:DriverAdvisorySystem|Driver Advisory System (DAS)]] | ||
|{{Deu|Fahrerassistenzsystem}} | |{{Deu|Fahrerassistenzsystem}} | ||
Line 116: | Line 117: | ||
| | | | ||
|2 | |2 | ||
|[[UC:IS: | |[[UC:IS:RailwayInfrastructureRecording|Railway Infrastructure Recording]] | ||
|{{Deu| | |{{Deu|Erfassung der Schieneninfrastruktur}} | ||
| | |{{Fra|Enregistrement des infrastructures ferroviaires}} | ||
| | |ISRC | ||
| | |Bahnkonzept | ||
| | |draft | ||
|- | |- | ||
|IS | |IS | ||
| | | | ||
| | | | ||
| | |3 | ||
|[[UC:IS:PositioningAndMap-Matching|Positioning and Map-Matching]] | |[[UC:IS:PositioningAndMap-Matching|Positioning and Map-Matching]] | ||
|{{Deu|Positionierung und Kartenvergleich}} | |{{Deu|Positionierung und Kartenvergleich}} | ||
Line 137: | Line 138: | ||
| | | | ||
| | | | ||
| | |3 | ||
|[[UC:IS:Asset status representation|Asset status representation]] | |[[UC:IS:Asset status representation|Asset status representation]] | ||
|{{Deu|Darstellung des Infrastrukturzustands}} | |{{Deu|Darstellung des Infrastrukturzustands}} | ||
Line 143: | Line 144: | ||
|ASSR | |ASSR | ||
|DLR for IN2Rail project | |DLR for IN2Rail project | ||
|draft | |draft | ||
|- | |- | ||
Line 182: | Line 172: | ||
| | | | ||
|draft | |draft | ||
|- | |||
|IL | |||
| | |||
| | |||
| 4 || [[UC:IL:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[UC:IL:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[UC:IL:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||DPRS||EULYNX ''(erstwhile)''|| draft | |||
|- | |||
|IL | |||
| | |||
| | |||
| 4 || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft | |||
|- | |- | ||
|IL | |IL | ||
Line 475: | Line 475: | ||
|{{Deu|Dienstplanung und Personalschichten}} | |{{Deu|Dienstplanung und Personalschichten}} | ||
|{{Fra|Planification des permanences et affectation du personnel}} | |{{Fra|Planification des permanences et affectation du personnel}} | ||
| | |DUTY | ||
|<font color="red">writer: ÖBB</font color>; <font color="red">reviewer: INIT/...</font color> | |<font color="red">writer: ÖBB</font color>; <font color="red">reviewer: INIT/...</font color> | ||
|draft | |draft | ||
|}{{interwiki}} | |}{{interwiki}} |
Revision as of 19:48, 24 July 2021
Directing Subschema |
Involved Subschemas |
Implemented in railML® version |
Priority |
Description (EN) | Description (DE) | Description (FR) | Abbreviation |
Reported by | Status how to interpret the status |
---|---|---|---|---|---|---|---|---|---|
IL | IS | 3.1 | X | Routes for timetable simulation (former: Capacity operational simulation) |
Fahrstrassen für Fahrplan simulieren (ehemals: Leistungsfähigkeit Simulation) |
RSIM | Jernbanedirektoratet/BaneNOR (erstwhile: Jernbanedirektoratet Capacity Dpt) |
consolidated | |
IL | 3.1 | X | Interlocking module engineering data (former: Interlocking engineering) |
Stellwerksprojektierung | [[UC:IL:InterlockingEngineering|]] | IMED | Thales Germany | consolidated | |
IS | 3.1 | X | Schematic Track Plan | Schematische Gleisplandarstellung | SCTP | JBD/BaneNOR | consolidated | ||
IS | 3.1 | X | RINF Reporting | RINF Meldung | RINR | SNCF Réseau | merged into NEST | ||
IS | 3.1 | X | Network statement of an infrastructure manager | Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers | NEST | SŽDC/ProRail/BaneNOR | consolidated | ||
TT | 3.2 | 1 | Passenger information at stations | Fahrgastinformation am Bahnhof | writer: PSI (20.05.15); reviewer: Init | consolidated | |||
IS | TT, IL | 3.2 | 1 | Integrated TMS | Integriertes Verkehrsmanagement | ITMS | Bombardier | draft | |
TT | IL, IS, RS | 3.2 | 1 | Traffic Management Plan | writer: Thales; reviewer: ??? | draft | |||
IS | 2 | Passenger Information System | Fahrgast-Informationssystem | PISY | draft | ||||
IS | 2 | Track Geometry | Gleisgeometrie | TRGE | ÖBB Infrastruktur | review | |||
IS | TT | 2 | Driver Advisory System (DAS) | Fahrerassistenzsystem | DASY | IS | draft | ||
IS | 2 | Railway Infrastructure Recording | Erfassung der Schieneninfrastruktur | ISRC | Bahnkonzept | draft | |||
IS | 3 | Positioning and Map-Matching | Positionierung und Kartenvergleich | POSI | draft | ||||
IS | 3 | Asset status representation | Darstellung des Infrastrukturzustands | ASSR | DLR for IN2Rail project | draft | |||
IS | 3 | Exchange of planning parameters for interlocking with suppliers | Austausch von Planungsparametern für Stellwerke mit Herstellern | ISIL | IS | draft | |||
IL | 4 | Operation and Control | Betriebsführung | draft | |||||
IS | 3 | Maintenance Planning | Wartungsplanung | MAPL | draft | ||||
IL | 4 | Data prepration for signalling | Datenbereitstellung für Stellwerkssysteme | [[UC:IL:EulynxDataPreparationInterlocking|]] | DPRS | EULYNX (erstwhile) | draft | ||
IL | 4 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | [[UC:IL:InterlockEngineeringForSignallingWithinJBV|]] | Jernbaneverket Signalling Dpt | draft | |||
IL | 5 | Site preparation data for Signal Controlled Warning Systems | Daten zur Standortvorbereitung für Rottenwarnsysteme | SCWS | Thales Austria | draft | |||
IL | 6 | Hardware and cable plan | Aussenanlage und Kabelplan | draft | |||||
IS | 3 | Capacity Planning | Kapazitätsplanung | CAPL | JBV/BaneNOR | draft | |||
IS | 3 | NRE Reporting | NRE Meldung | NRER | ÖBB Infrastruktur | draft | |||
IS | 3 | Speed directory | Verzeichnis der zulässigen Geschwindigkeiten | SPED | ÖBB Infrastruktur | draft | |||
IS | 3 | Timetabling | Fahrplanerstellung | ISTT | ProRail | draft | |||
IS | 3 | CAD for railway signaling | CAD für Zugsignalisierung | CASP | RailComplete | draft | |||
IS | 3 | Capture schematic visualisation information of track assets | Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen | draft | |||||
IS | 3 | Railway Simulation Laboratory | Eisenbahnbetriebslabor | RLAB | ČVUT | draft | |||
IS | 9 | Railway Infrastructure Visualisation | Visualisierung von Schieneninfrastruktur | ISVI | outdated | ||||
IS | IL | 3 | ETCS track net | ETCS | Thales | draft | |||
RS | Traction power supply simulation | Simulation der Bahnstromversorgung | |||||||
RS | Operational simulation | Betriebssimulation | |||||||
TT | Timetable Information | Fahrplanauskunft | writer: HaCon (13.03.15); reviewer: IVU | consolidated | |||||
TT | A timetable for a competition (call for proposals) | Ausschreibungsfahrplan | writer: iRFP (21.05.15); reviewer: IVU (22.09.16) | consolidated | |||||
TT | Import complete timetable for vehicle working scheduling and vehicle workings | Umlaufbildung Fahrzeuge Jahresfahrplan | writer: IVU (20.05.15); reviewer: iRFP | draft | |||||
TT | Adopt vehicle working scheduling to timetable changes | Umlauf an Jahresfahrplan anpassen | writer: IVU (21.05.15) ; reviewer: HaCon | consolidated | |||||
TT | Exchange of formation data | Austausch von Wagenreihungen/ Behängungsdaten | writer: iRFP (21.05.15); reviewer: IVU (22.09.16) | consolidated | |||||
TT | TAF/TAP TSI requirements | TAF/TAP TSI Anforderungen | writer: ERA; reviewer: ??? | draft | |||||
TT | Long Term Strategic Timetabling | Langfrist-Fahrplanerstellung | writer: SMA (22.12.16); reviewer: HaCon | draft | |||||
TT | Slot ordering | Trassenbestellung | writer: SMA (17.09.16); reviewer: iRFP | draft | |||||
TT | Passenger information inside the train | Fahrgastinformation im Zug | writer: Interautomation (17.01.17); reviewer: PSI and iRFP | draft | |||||
TT | Automatic Route Setting (ARS) Automatic Train Supervision (ATS) |
Zuglenkung | writer: Toshiba?; reviewer: PSI |
planned | |||||
TT | Betriebsleitsysteme/RBL | writer: PSI; reviewer: IVU | planned | ||||||
TT | Dienstbildung Personal Jahresfahrplan | writer: INIT; reviewer: IVU | postponed | ||||||
TT | Operational simulation timetable | Betriebssimulation Fahrplan | writer: OTRT?; reviewer: SMA | postponed | |||||
IS | IL, RS, TT | Exchange of Logical Train Positions | writer: Siemens Mobility; reviewer: ??? | draft | |||||
TT | RS, IS | Duty planning and staff shifts | Dienstplanung und Personalschichten | DUTY | writer: ÖBB; reviewer: INIT/... | draft |