Template:UC:Use cases/table: Difference between revisions

From railML 3 Wiki
Jump to navigation Jump to search
[unchecked revision][unchecked revision]
No edit summary
(DUTY use case added)
Line 49: Line 49:
|TT
|TT
|
|
|
|3.2
|1
|1
|[[UC:TT:PassengerInformationAtStations|Passenger information at stations]]
|[[UC:TT:PassengerInformationAtStations|Passenger information at stations]]
Line 60: Line 60:
|IS
|IS
|TT, IL
|TT, IL
|
|3.2
|2
|1
|[[UC:IS:IntegratedTMS|Integrated TMS]]
|[[UC:IS:IntegratedTMS|Integrated TMS]]
|{{Deu|Integriertes Verkehrsmanagement}}
|{{Deu|Integriertes Verkehrsmanagement}}
Line 71: Line 71:
|TT
|TT
|IL, IS, RS
|IL, IS, RS
|
|3.2
|2
|1
|[[UC:TT:TrafficManagementPlan|Traffic Management Plan]]
|[[UC:TT:TrafficManagementPlan|Traffic Management Plan]]
|
|
Line 83: Line 83:
|
|
|
|
|3
|2
|[[UC:IS:PassengerInformationSystem|Passenger Information System]]
|[[UC:IS:PassengerInformationSystem|Passenger Information System]]
|{{Deu|Fahrgast-Informationssystem}}
|{{Deu|Fahrgast-Informationssystem}}
Line 91: Line 91:
|draft
|draft
|-
|-
|IL
|IS
|
|
|
|
| 3 || [[UC:IL:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[UC:IL:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[UC:IL:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||DPRS||EULYNX ''(erstwhile)''|| draft
|2
|-
|[[UC:IS:Track Geometry|Track Geometry]]
|IL
|{{Deu|Gleisgeometrie}}
|
|
|
|TRGE
| 3 || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
|ÖBB Infrastruktur
|review
|-
|-
|IS
|IS
|TT
|TT
|
|
|3
|2
|[[UC:IS:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|[[UC:IS:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|{{Deu|Fahrerassistenzsystem}}
|{{Deu|Fahrerassistenzsystem}}
Line 116: Line 117:
|
|
|2
|2
|[[UC:IS:Track Geometry|Track Geometry]]
|[[UC:IS:RailwayInfrastructureRecording|Railway Infrastructure Recording]]
|{{Deu|Gleisgeometrie}}
|{{Deu|Erfassung der Schieneninfrastruktur}}
|
|{{Fra|Enregistrement des infrastructures ferroviaires}}
|TRGE
|ISRC
|ÖBB Infrastruktur
|Bahnkonzept
|review
|draft
|-
|-
|IS
|IS
|
|
|
|
|2
|3
|[[UC:IS:PositioningAndMap-Matching|Positioning and Map-Matching]]
|[[UC:IS:PositioningAndMap-Matching|Positioning and Map-Matching]]
|{{Deu|Positionierung und Kartenvergleich}}
|{{Deu|Positionierung und Kartenvergleich}}
Line 137: Line 138:
|
|
|
|
|2
|3
|[[UC:IS:Asset status representation|Asset status representation]]
|[[UC:IS:Asset status representation|Asset status representation]]
|{{Deu|Darstellung des Infrastrukturzustands}}
|{{Deu|Darstellung des Infrastrukturzustands}}
Line 143: Line 144:
|ASSR
|ASSR
|DLR for IN2Rail project
|DLR for IN2Rail project
|draft
|-
|IS
|
|
|3
|[[UC:IS:RailwayInfrastructureRecording|Railway Infrastructure Recording]]
|{{Deu|Erfassung der Schieneninfrastruktur}}
|{{Fra|Enregistrement des infrastructures ferroviaires}}
|ISRC
|Bahnkonzept
|draft
|draft
|-
|-
Line 182: Line 172:
|
|
|draft
|draft
|-
|IL
|
|
| 4 || [[UC:IL:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[UC:IL:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[UC:IL:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||DPRS||EULYNX ''(erstwhile)''|| draft
|-
|IL
|
|
| 4 || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
|-
|-
|IL
|IL
Line 475: Line 475:
|{{Deu|Dienstplanung und Personalschichten}}
|{{Deu|Dienstplanung und Personalschichten}}
|{{Fra|Planification des permanences et affectation du personnel}}
|{{Fra|Planification des permanences et affectation du personnel}}
|SHFT
|DUTY
|<font color="red">writer: ÖBB</font color>; <font color="red">reviewer: INIT/...</font color>
|<font color="red">writer: ÖBB</font color>; <font color="red">reviewer: INIT/...</font color>
|draft
|draft
|}{{interwiki}}
|}{{interwiki}}

Revision as of 19:48, 24 July 2021

Directing Subschema
Involved Subschemas
Implemented in railML® version
Priority
Description (EN) Description (DE) Description (FR)
Abbreviation
Reported by Status
how to interpret the status
IL IS 3.1 X Routes for timetable simulation
(former: Capacity operational simulation)
Fahrstrassen für Fahrplan simulieren
(ehemals: Leistungsfähigkeit Simulation)
RSIM Jernbanedirektoratet/BaneNOR
(erstwhile: Jernbanedirektoratet Capacity Dpt)
consolidated
IL 3.1 X Interlocking module engineering data
(former: Interlocking engineering)
Stellwerksprojektierung [[UC:IL:InterlockingEngineering|]] IMED Thales Germany consolidated
IS 3.1 X Schematic Track Plan Schematische Gleisplandarstellung SCTP JBD/BaneNOR consolidated
IS 3.1 X RINF Reporting RINF Meldung RINR SNCF Réseau merged into NEST
IS 3.1 X Network statement of an infrastructure manager Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers NEST SŽDC/​ProRail/​BaneNOR consolidated
TT 3.2 1 Passenger information at stations Fahrgastinformation am Bahnhof writer: PSI (20.05.15); reviewer: Init consolidated
IS TT, IL 3.2 1 Integrated TMS Integriertes Verkehrsmanagement ITMS Bombardier draft
TT IL, IS, RS 3.2 1 Traffic Management Plan writer: Thales; reviewer: ??? draft
IS 2 Passenger Information System Fahrgast-Informationssystem PISY draft
IS 2 Track Geometry Gleisgeometrie TRGE ÖBB Infrastruktur review
IS TT 2 Driver Advisory System (DAS) Fahrerassistenzsystem DASY IS draft
IS 2 Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC Bahnkonzept draft
IS 3 Positioning and Map-Matching Positionierung und Kartenvergleich POSI draft
IS 3 Asset status representation Darstellung des Infrastrukturzustands ASSR DLR for IN2Rail project draft
IS 3 Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Her­stel­lern ISIL IS draft
IL 4 Operation and Control Betriebsführung draft
IS 3 Maintenance Planning Wartungsplanung MAPL draft
IL 4 Data prepration for signalling Datenbereitstellung für Stellwerkssysteme [[UC:IL:EulynxDataPreparationInterlocking|]] DPRS EULYNX (erstwhile) draft
IL 4 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung [[UC:IL:InterlockEngineeringForSignallingWithinJBV|]] Jernbaneverket Signalling Dpt draft
IL 5 Site preparation data for Signal Controlled Warning Systems Daten zur Standortvorbereitung für Rottenwarnsysteme SCWS Thales Austria draft
IL 6 Hardware and cable plan Aussenanlage und Kabelplan draft
IS 3 Capacity Planning Kapazitätsplanung CAPL JBV/BaneNOR draft
IS 3 NRE Reporting NRE Meldung NRER ÖBB Infrastruktur draft
IS 3 Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED ÖBB Infrastruktur draft
IS 3 Timetabling Fahrplanerstellung ISTT ProRail draft
IS 3 CAD for railway signaling CAD für Zugsignalisierung CASP RailComplete draft
IS 3 Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen draft
IS 3 Railway Simulation Laboratory Eisenbahnbetriebslabor RLAB ČVUT draft
IS 9 Railway Infrastructure Visualisation Visualisierung von Schieneninfrastruktur ISVI outdated
IS IL 3 ETCS track net ETCS Thales draft
RS Traction power supply simulation Simulation der Bahnstromversorgung
RS Operational simulation Betriebssimulation
TT Timetable Information Fahrplanauskunft writer: HaCon (13.03.15); reviewer: IVU consolidated
TT A timetable for a competition (call for proposals) Ausschreibungsfahrplan writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated
TT Import complete timetable for vehicle working scheduling and vehicle workings Umlaufbildung Fahrzeuge Jahresfahrplan writer: IVU (20.05.15); reviewer: iRFP draft
TT Adopt vehicle working scheduling to timetable changes Umlauf an Jahresfahrplan anpassen writer: IVU (21.05.15) ; reviewer: HaCon consolidated
TT Exchange of formation data Austausch von Wagenreihungen/ Behängungsdaten writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated
TT TAF/TAP TSI requirements TAF/TAP TSI Anforderungen writer: ERA; reviewer: ??? draft
TT Long Term Strategic Timetabling Langfrist-Fahrplanerstellung writer: SMA (22.12.16); reviewer: HaCon draft
TT Slot ordering Trassenbestellung writer: SMA (17.09.16); reviewer: iRFP draft
TT Passenger information inside the train Fahrgastinformation im Zug writer: Interautomation (17.01.17); reviewer: PSI and iRFP draft
TT Automatic Route Setting (ARS)
Automatic Train Supervision (ATS)
Zuglenkung writer: Toshiba?;
reviewer: PSI
planned
TT Be­triebs­leit­sys­te­me/​RBL writer: PSI; reviewer: IVU planned
TT Dienstbildung Personal Jahresfahrplan writer: INIT; reviewer: IVU postponed
TT Operational simulation timetable Betriebssimulation Fahrplan writer: OTRT?; reviewer: SMA postponed
IS IL, RS, TT Exchange of Logical Train Positions writer: Siemens Mobility; reviewer: ??? draft
TT RS, IS Duty planning and staff shifts Dienstplanung und Personalschichten DUTY writer: ÖBB; reviewer: INIT/... draft