Template:UC:Use cases/table: Difference between revisions

From railML 3 Wiki
Jump to navigation Jump to search
[unchecked revision][unchecked revision]
(DUTY use case added)
(Sorting improved)
Line 15: Line 15:
|3.1
|3.1
| X || [[UC:IL:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[UC:IL:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[UC:IL:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated
| X || [[UC:IL:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[UC:IL:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[UC:IL:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated
|-
|IL
|
|
| 3 || [[UC:IL:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[UC:IL:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[UC:IL:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||DPRS||EULYNX ''(erstwhile)''|| draft
|-
|IL
|
|
| 3 || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
|-
|IL
|
|
| 4 || [[UC:IL:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}||  || || draft
|-
|IL
|
|
| 5 || [[UC:IL:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft
|-
|IL
|
|
| 6 || [[UC:IL:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft
|-
|{{anchor|NEST}}IS
|
|3.1
|X
|[[UC:IS:NetworkStatement|Network statement of an infrastructure manager]]
|{{Deu|Schie&shy;nen&shy;netz&shy;be&shy;nut&shy;zungs&shy;be&shy;din&shy;gun&shy;gen eines Infrastrukturbetreibers}}
|{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}}
|NEST
|SŽDC/&#8203;ProRail/&#8203;BaneNOR
|consolidated
|-
|-
|IS
|IS
Line 73: Line 37:
|SNCF Réseau
|SNCF Réseau
|merged into [[#NEST|NEST]]
|merged into [[#NEST|NEST]]
|-
|{{anchor|NEST}}IS
|
|3.1
|X
|[[UC:IS:NetworkStatement|Network statement of an infrastructure manager]]
|{{Deu|Schie&shy;nen&shy;netz&shy;be&shy;nut&shy;zungs&shy;be&shy;din&shy;gun&shy;gen eines Infrastrukturbetreibers}}
|{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}}
|NEST
|SŽDC/&#8203;ProRail/&#8203;BaneNOR
|consolidated
|-
|TT
|
|
|1
|[[UC:TT:PassengerInformationAtStations|Passenger information at stations]]
|{{Deu|Fahrgastinformation am Bahnhof }}
|{{Fra|Information voyageurs en station}}
|
|<font color="green">writer: PSI (20.05.15)</font color>; <font color="green">reviewer: Init</font color>
|consolidated
|-
|-
|IS
|IS
Line 83: Line 69:
|ITMS
|ITMS
|Bombardier
|Bombardier
|draft
|-
|TT
|IL, IS, RS
|
|2
|[[UC:TT:TrafficManagementPlan|Traffic Management Plan]]
|
|
|
|<font color="red">writer: Thales</font color>; <font color="red">reviewer: ???</font color>
|draft
|-
|IS
|
|
|3
|[[UC:IS:PassengerInformationSystem|Passenger Information System]]
|{{Deu|Fahrgast-Informationssystem}}
|{{Fra|Système d'information voyageurs}}
|PISY
|
|draft
|-
|IL
|
|
| 3 || [[UC:IL:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[UC:IL:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[UC:IL:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||DPRS||EULYNX ''(erstwhile)''|| draft
|-
|IL
|
|
| 3 || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
|-
|IS
|TT
|
|3
|[[UC:IS:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|{{Deu|Fahrerassistenzsystem}}
|{{Fra|Système d'assistance au conducteur (DAS)}}
|DASY
|IS
|draft
|draft
|-
|-
Line 127: Line 156:
|ISRC
|ISRC
|Bahnkonzept
|Bahnkonzept
|draft
|-
|IS
|TT
|
|3
|[[UC:IS:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|{{Deu|Fahrerassistenzsystem}}
|{{Fra|Système d'assistance au conducteur (DAS)}}
|DASY
|IS
|draft
|draft
|-
|-
Line 150: Line 168:
|IS
|IS
|draft
|draft
|-
|IL
|
|
| 4 || [[UC:IL:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}||  || || draft
|-
|-
|IS
|IS
Line 162: Line 185:
|draft
|draft
|-
|-
|IS
|IL
|
|
|
| 5 || [[UC:IL:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft
|-
|IL
|
|
|3
|[[UC:IS:PassengerInformationSystem|Passenger Information System]]
|{{Deu|Fahrgast-Informationssystem}}
|{{Fra|Système d'information voyageurs}}
|PISY
|
|
|draft
| 6 || [[UC:IL:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft
|-
|-
|IS
|IS
Line 303: Line 325:
|
|
|<font color="green">writer: HaCon (13.03.15)</font color>; <font color="green">reviewer: IVU</font color>
|<font color="green">writer: HaCon (13.03.15)</font color>; <font color="green">reviewer: IVU</font color>
|consolidated
|-
|TT
|
|
|1
|[[UC:TT:PassengerInformationAtStations|Passenger information at stations]]
|{{Deu|Fahrgastinformation am Bahnhof }}
|{{Fra|Information voyageurs en station}}
|
|<font color="green">writer: PSI (20.05.15)</font color>; <font color="green">reviewer: Init</font color>
|consolidated
|consolidated
|-
|-
Line 447: Line 458:
|<font color="red">writer: OTRT?</font color>; <font color="red">reviewer: SMA</font color>
|<font color="red">writer: OTRT?</font color>; <font color="red">reviewer: SMA</font color>
|postponed
|postponed
|-
|TT
|IL, IS, RS
|
|2
|[[UC:TT:TrafficManagementPlan|Traffic Management Plan]]
|
|
|
|<font color="red">writer: Thales</font color>; <font color="red">reviewer: ???</font color>
|draft
|-
|-
|IS
|IS

Revision as of 09:27, 10 June 2021

Return to article

Directing Subschema
Involved Subschemas
Implemented in railML® version
Priority
Description (EN) Description (DE) Description (FR)
Abbreviation
Reported by Status
how to interpret the status
IL IS 3.1 X Routes for timetable simulation
(former: Capacity operational simulation)
Fahrstrassen für Fahrplan simulieren
(ehemals: Leistungsfähigkeit Simulation)
RSIM Jernbanedirektoratet/BaneNOR
(erstwhile: Jernbanedirektoratet Capacity Dpt)
consolidated
IL 3.1 X Interlocking module engineering data
(former: Interlocking engineering)
Stellwerksprojektierung [[UC:IL:InterlockingEngineering|]] IMED Thales Germany consolidated
IS 3.1 X Schematic Track Plan Schematische Gleisplandarstellung SCTP JBD/BaneNOR consolidated
IS 3.1 X RINF Reporting RINF Meldung RINR SNCF Réseau merged into NEST
IS 3.1 X Network statement of an infrastructure manager Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers NEST SŽDC/​ProRail/​BaneNOR consolidated
TT 1 Passenger information at stations Fahrgastinformation am Bahnhof writer: PSI (20.05.15); reviewer: Init consolidated
IS TT, IL 2 Integrated TMS Integriertes Verkehrsmanagement ITMS Bombardier draft
TT IL, IS, RS 2 Traffic Management Plan writer: Thales; reviewer: ??? draft
IS 3 Passenger Information System Fahrgast-Informationssystem PISY draft
IL 3 Data prepration for signalling Datenbereitstellung für Stellwerkssysteme [[UC:IL:EulynxDataPreparationInterlocking|]] DPRS EULYNX (erstwhile) draft
IL 3 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung [[UC:IL:InterlockEngineeringForSignallingWithinJBV|]] Jernbaneverket Signalling Dpt draft
IS TT 3 Driver Advisory System (DAS) Fahrerassistenzsystem DASY IS draft
IS 2 Track Geometry Gleisgeometrie TRGE ÖBB Infrastruktur review
IS 2 Positioning and Map-Matching Positionierung und Kartenvergleich POSI draft
IS 2 Asset status representation Darstellung des Infrastrukturzustands ASSR DLR for IN2Rail project draft
IS 3 Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC Bahnkonzept draft
IS 3 Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Her­stel­lern ISIL IS draft
IL 4 Operation and Control Betriebsführung draft
IS 3 Maintenance Planning Wartungsplanung MAPL draft
IL 5 Site preparation data for Signal Controlled Warning Systems Daten zur Standortvorbereitung für Rottenwarnsysteme SCWS Thales Austria draft
IL 6 Hardware and cable plan Aussenanlage und Kabelplan draft
IS 3 Capacity Planning Kapazitätsplanung CAPL JBV/BaneNOR draft
IS 3 NRE Reporting NRE Meldung NRER ÖBB Infrastruktur draft
IS 3 Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED ÖBB Infrastruktur draft
IS 3 Timetabling Fahrplanerstellung ISTT ProRail draft
IS 3 CAD for railway signaling CAD für Zugsignalisierung CASP RailComplete draft
IS 3 Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen draft
IS 3 Railway Simulation Laboratory Eisenbahnbetriebslabor RLAB ČVUT draft
IS 9 Railway Infrastructure Visualisation Visualisierung von Schieneninfrastruktur ISVI outdated
IS IL 3 ETCS track net ETCS Thales draft
RS Traction power supply simulation Simulation der Bahnstromversorgung
RS Operational simulation Betriebssimulation
TT Timetable Information Fahrplanauskunft writer: HaCon (13.03.15); reviewer: IVU consolidated
TT A timetable for a competition (call for proposals) Ausschreibungsfahrplan writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated
TT Import complete timetable for vehicle working scheduling and vehicle workings Umlaufbildung Fahrzeuge Jahresfahrplan writer: IVU (20.05.15); reviewer: iRFP draft
TT Adopt vehicle working scheduling to timetable changes Umlauf an Jahresfahrplan anpassen writer: IVU (21.05.15) ; reviewer: HaCon consolidated
TT Exchange of formation data Austausch von Wagenreihungen/ Behängungsdaten writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated
TT TAF/TAP TSI requirements TAF/TAP TSI Anforderungen writer: ERA; reviewer: ??? draft
TT Long Term Strategic Timetabling Langfrist-Fahrplanerstellung writer: SMA (22.12.16); reviewer: HaCon draft
TT Slot ordering Trassenbestellung writer: SMA (17.09.16); reviewer: iRFP draft
TT Passenger information inside the train Fahrgastinformation im Zug writer: Interautomation (17.01.17); reviewer: PSI and iRFP draft
TT Automatic Route Setting (ARS)
Automatic Train Supervision (ATS)
Zuglenkung writer: Toshiba?;
reviewer: PSI
planned
TT Be­triebs­leit­sys­te­me/​RBL writer: PSI; reviewer: IVU planned
TT Dienstbildung Personal Jahresfahrplan writer: INIT; reviewer: IVU postponed
TT Operational simulation timetable Betriebssimulation Fahrplan writer: OTRT?; reviewer: SMA postponed
IS IL, RS, TT Exchange of Logical Train Positions writer: Siemens Mobility; reviewer: ??? draft
TT RS, IS Duty planning and staff shifts Dienstplanung und Personalschichten DUTY writer: ÖBB; reviewer: INIT/... draft