Template:UC:Use cases/table: Difference between revisions

From railML 3 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
(Correction of writer.)
No edit summary
Line 1: Line 1:
{| class="wikitable sortable"
{| class="wikitable sortable"
|-
|-
! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(lowest)</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(highest)</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! style="width:15%"|Description (FR) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[UC:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span> !! Edited
! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(lowest)</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(highest)</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[UC:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span> !! Edited
|-
|-
|IL
|IL
Line 10: Line 10:
|[[UC:IL:InterlockingEngineering|Interlocking module engineering data <br/> ''(former: Interlocking engineering)'']]
|[[UC:IL:InterlockingEngineering|Interlocking module engineering data <br/> ''(former: Interlocking engineering)'']]
|{{Deu|Stellwerksprojektierung}}
|{{Deu|Stellwerksprojektierung}}
|{{Fra|Invariants des système d’enclenchement}}
|IMED
|IMED
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color>
Line 23: Line 22:
|[[UC:IS:NetworkStatement|Network statement of an infrastructure manager]]
|[[UC:IS:NetworkStatement|Network statement of an infrastructure manager]]
|{{Deu|Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers}}
|{{Deu|Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers}}
|{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}}
|NEST
|NEST
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/szdc.html Správa železnic] (former: SŽDC) / [https://www.railml.org/en/introduction/partners/detail/prorail.html ProRail] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/szdc.html Správa železnic] (former: SŽDC) / [https://www.railml.org/en/introduction/partners/detail/prorail.html ProRail] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR]</font color>
Line 36: Line 34:
|[[UC:IS:RINFReporting|RINF Reporting]]
|[[UC:IS:RINFReporting|RINF Reporting]]
|{{Deu|RINF Meldung}}
|{{Deu|RINF Meldung}}
|{{Fra|Rapports RINF}}
|RINR
|RINR
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/sncf-reseau.html SNCF Réseau]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/sncf-reseau.html SNCF Réseau]</font color>
Line 49: Line 46:
|[[UC:IL:Simulation|Routes for timetable simulation <br/> ''(former: Capacity operational simulation)'']]
|[[UC:IL:Simulation|Routes for timetable simulation <br/> ''(former: Capacity operational simulation)'']]
|{{Deu|Fahrstrassen für Fahrplan simulieren <br/> ''(ehemals: Leistungsfähigkeit Simulation)''}}
|{{Deu|Fahrstrassen für Fahrplan simulieren <br/> ''(ehemals: Leistungsfähigkeit Simulation)''}}
|{{Fra| <br/> ''(ancien: Simulation de la capacité)''}}
|RSIM
|RSIM
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/jernbanedirektoratet.html Jernbanedirektoratet] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR] <br />(erstwhile: Jernbanedirektoratet Capacity Dpt)</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/jernbanedirektoratet.html Jernbanedirektoratet] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR] <br />(erstwhile: Jernbanedirektoratet Capacity Dpt)</font color>
Line 62: Line 58:
|[[UC:IS:Schematic Track Plan|Schematic Track Plan]]
|[[UC:IS:Schematic Track Plan|Schematic Track Plan]]
|{{Deu|Schematische Gleisplandarstellung}}
|{{Deu|Schematische Gleisplandarstellung}}
|{{Fra|Plan du tracé schématique}}
|SCTP
|SCTP
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/jernbanedirektoratet.html Jernbanedirektoratet] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/jernbanedirektoratet.html Jernbanedirektoratet] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR]</font color>
Line 75: Line 70:
|[[UC:IS:IntegratedTMS|Integrated TMS]]
|[[UC:IS:IntegratedTMS|Integrated TMS]]
|{{Deu|Integriertes Verkehrsmanagement}}
|{{Deu|Integriertes Verkehrsmanagement}}
|
|ITMS
|ITMS
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/bombadier-transportation.html Bombardier Transportation]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/bombadier-transportation.html Bombardier Transportation]</font color>
Line 87: Line 81:
|X
|X
|[[UC:TT:TrafficManagementPlan|Traffic Management Plan]]
|[[UC:TT:TrafficManagementPlan|Traffic Management Plan]]
|
|
|
|
|
Line 100: Line 93:
|rowspan="4"|X
|rowspan="4"|X
|[[UC:IS:ETCS track net|ETCS track net]]
|[[UC:IS:ETCS track net|ETCS track net]]
|
|
|
|ETCS
|ETCS
Line 113: Line 105:


|[[UC:IS:ETCS track net|ETCS track net: Input for Detailed Design of ETCS Trackside]]
|[[UC:IS:ETCS track net|ETCS track net: Input for Detailed Design of ETCS Trackside]]
|
|
|
|ETCS-a
|ETCS-a
Line 126: Line 117:


|[[UC:IS:ETCS track net|ETCS track net: Output of Detailed Design of ETCS Trackside]]
|[[UC:IS:ETCS track net|ETCS track net: Output of Detailed Design of ETCS Trackside]]
|
|
|
|ETCS-b
|ETCS-b
Line 139: Line 129:


|[[UC:IS:ETCS track net|ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement]]
|[[UC:IS:ETCS track net|ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement]]
|
|
|
|ETCS-c
|ETCS-c
Line 153: Line 142:
|[[UC:TT:PassengerInformationAtStations|Passenger information at stations]]
|[[UC:TT:PassengerInformationAtStations|Passenger information at stations]]
|{{Deu|Fahrgastinformation am Bahnhof}}
|{{Deu|Fahrgastinformation am Bahnhof}}
|{{Fra|Information voyageurs en station}}
|
|
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/psi-transcom.html PSI Transcom] (20. 05. 15)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/initplan-karlsruhe.html init]</font color>
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/psi-transcom.html PSI Transcom] (20. 05. 15)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/initplan-karlsruhe.html init]</font color>
Line 166: Line 154:
|[[UC:TT:ATimetableForACompetition|A timetable for a competition (call for proposals)]]
|[[UC:TT:ATimetableForACompetition|A timetable for a competition (call for proposals)]]
|{{Deu|Ausschreibungsfahrplan}}
|{{Deu|Ausschreibungsfahrplan}}
|
|
|
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP] (21. 05. 15)</font color>; <br /> <font color="green">reviewer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies] (22. 09. 16)</font color>
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP] (21. 05. 15)</font color>; <br /> <font color="green">reviewer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies] (22. 09. 16)</font color>
Line 179: Line 166:
|[[UC:TT:AdoptVehicleWorkingSchedulingToTimetableChanges|Adopt vehicle working scheduling to timetable changes]]
|[[UC:TT:AdoptVehicleWorkingSchedulingToTimetableChanges|Adopt vehicle working scheduling to timetable changes]]
|{{Deu|Umlauf an Jahresfahrplan anpassen}}
|{{Deu|Umlauf an Jahresfahrplan anpassen}}
|
|
|
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies] (21. 05. 15)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft]</font color>
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies] (21. 05. 15)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft]</font color>
Line 192: Line 178:
|[[UC:TT:DutyShiftsPersonnelRoster|Duty planning and staff shifts]]
|[[UC:TT:DutyShiftsPersonnelRoster|Duty planning and staff shifts]]
|{{Deu|Dienstplanung und Personalschichten}}
|{{Deu|Dienstplanung und Personalschichten}}
|{{Fra|Planification des permanences et affectation du personnel}}
|SHFT
|SHFT
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/oebb-personenverkehr.html ÖBB Personenverkehr]</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/initplan-karlsruhe.html init]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/oebb-personenverkehr.html ÖBB Personenverkehr]</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/initplan-karlsruhe.html init]</font color>
Line 205: Line 190:
|[[UC:TT:ExchangeOfFormationData|Exchange of formation data]]
|[[UC:TT:ExchangeOfFormationData|Exchange of formation data]]
|{{Deu|Austausch von Wagenreihungen/ Behängungsdaten}}
|{{Deu|Austausch von Wagenreihungen/ Behängungsdaten}}
|
|
|
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP] (21. 05. 15)</font color>; <br /> <font color="green">reviewer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies] (22. 09. 16)</font color>
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP] (21. 05. 15)</font color>; <br /> <font color="green">reviewer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies] (22. 09. 16)</font color>
Line 218: Line 202:
|[[UC:TT:LongTermStrategicTimetabling|Long Term Strategic Timetabling]]
|[[UC:TT:LongTermStrategicTimetabling|Long Term Strategic Timetabling]]
|{{Deu|Langfrist-Fahrplanerstellung}}
|{{Deu|Langfrist-Fahrplanerstellung}}
|
|LTST
|LTST
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/sma-und-partner.html SMA+Partner] (22. 12. 16)</font color>; <br /> <font color="green">reviewer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft] (28. 6. 22)</font color>
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/sma-und-partner.html SMA+Partner] (22. 12. 16)</font color>; <br /> <font color="green">reviewer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft] (28. 6. 22)</font color>
Line 231: Line 214:
|[[UC:TT:TimetableInformation|Timetable Information]]
|[[UC:TT:TimetableInformation|Timetable Information]]
|{{Deu|Fahrplanauskunft}}
|{{Deu|Fahrplanauskunft}}
|{{Fra|Renseignement sur l'horaire}}
|TINF
|TINF
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft] (13. 03. 15)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies]</font color>
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft] (13. 03. 15)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies]</font color>
Line 244: Line 226:
|[[UC:IS:Track Geometry|Track Geometry]]
|[[UC:IS:Track Geometry|Track Geometry]]
|{{Deu|Gleisgeometrie}}
|{{Deu|Gleisgeometrie}}
|
|TRGE
|TRGE
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/oebb-infrastruktur.html ÖBB Infrastruktur]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/oebb-infrastruktur.html ÖBB Infrastruktur]</font color>
Line 257: Line 238:
|[[UC:IS:Asset status representation|Asset status representation]]
|[[UC:IS:Asset status representation|Asset status representation]]
|{{Deu|Darstellung des Infrastrukturzustands}}
|{{Deu|Darstellung des Infrastrukturzustands}}
|{{Fra|Représentation de l'actif}}
|ASSR
|ASSR
|<font color="black">writer: DLR for IN2Rail project</font color>
|<font color="black">writer: DLR for IN2Rail project</font color>
Line 270: Line 250:
|[[UC:IS:CADForRailwaySignaling|CAD for railway signaling]]
|[[UC:IS:CADForRailwaySignaling|CAD for railway signaling]]
|{{Deu|CAD für Zugsignalisierung}}
|{{Deu|CAD für Zugsignalisierung}}
|{{Fra|CAD pour la signalisation ferroviaire}}
|CASP
|CASP
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/railcomplete.html Railcomplete AS]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/railcomplete.html Railcomplete AS]</font color>
Line 283: Line 262:
|[[UC:IS:CapacityPlanning|Capacity Planning]]
|[[UC:IS:CapacityPlanning|Capacity Planning]]
|{{Deu|Kapazitätsplanung}}
|{{Deu|Kapazitätsplanung}}
|{{Fra|Planification de la capacité}}
|CAPL
|CAPL
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR] (erstwhile: JBV)</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR] (erstwhile: JBV)</font color>
Line 296: Line 274:
|[[UC:IS:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]]
|[[UC:IS:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]]
|{{Deu|Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen}}
|{{Deu|Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen}}
|{{Fra|Capture des informations de visualisation schématique des actifs de la piste}}
|
|
|
|
Line 309: Line 286:
|[[UC:IS:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|[[UC:IS:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|{{Deu|Fahrerassistenzsystem}}
|{{Deu|Fahrerassistenzsystem}}
|{{Fra|Système d'assistance au conducteur (DAS)}}
|DASY
|DASY
|<font color="black">writer: IS</font color>
|<font color="black">writer: IS</font color>
Line 321: Line 297:
|
|
|[[UC:IS:ExchangeOfLogicalTrainPositions|Exchange of Logical Train Positions]]
|[[UC:IS:ExchangeOfLogicalTrainPositions|Exchange of Logical Train Positions]]
|
|
|
|
|
Line 335: Line 310:
|[[UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]]
|[[UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]]
|{{Deu|Austausch von Planungsparametern für Stellwerke mit Her­stel­lern}}
|{{Deu|Austausch von Planungsparametern für Stellwerke mit Her­stel­lern}}
|{{Fra|Échange de paramètres de planification pour l'interconnexion avec les fournisseurs}}
|ISIL
|ISIL
|<font color="black">writer: IS</font color>
|<font color="black">writer: IS</font color>
Line 348: Line 322:
|[[UC:IL:HardwareAndCablePlan|Hardware and cable plan]]
|[[UC:IL:HardwareAndCablePlan|Hardware and cable plan]]
|{{Deu|Aussenanlage und Kabelplan}}
|{{Deu|Aussenanlage und Kabelplan}}
|{{Fra|Plan matériel et câble}}
|
|
|
|
Line 361: Line 334:
|[[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]]
|[[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]]
|{{Deu|Stellwerkstechnik für Signalisierung}}
|{{Deu|Stellwerkstechnik für Signalisierung}}
|{{Fra|Systèmes de verrouillage de la signalisation}}
|
|
|<font color="black">writer: Jernbaneverket Signalling Dpt</font color>
|<font color="black">writer: Jernbaneverket Signalling Dpt</font color>
Line 374: Line 346:
|[[UC:IS:MaintenancePlanning|Maintenance Planning]]
|[[UC:IS:MaintenancePlanning|Maintenance Planning]]
|{{Deu|Wartungsplanung}}
|{{Deu|Wartungsplanung}}
|{{Fra|Planification de la maintenance}}
|MAPL
|MAPL
|
|
Line 387: Line 358:
|[[UC:IS:NREReporting|NRE Reporting]]
|[[UC:IS:NREReporting|NRE Reporting]]
|{{Deu|NRE Meldung}}
|{{Deu|NRE Meldung}}
|{{Fra|Rapports NRE}}
|NRER
|NRER
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/oebb-infrastruktur.html ÖBB Infrastruktur]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/oebb-infrastruktur.html ÖBB Infrastruktur]</font color>
Line 400: Line 370:
|[[UC:IL:OperationAndControl|Operation and Control]]
|[[UC:IL:OperationAndControl|Operation and Control]]
|{{Deu|Betriebsführung}}
|{{Deu|Betriebsführung}}
|{{Fra|Commande et Control}}
|
|
|
|
Line 413: Line 382:
|[[UC:RS:OperationalSimulation|Operational simulation]]
|[[UC:RS:OperationalSimulation|Operational simulation]]
|{{Deu|Betriebssimulation}}
|{{Deu|Betriebssimulation}}
|
|
|
|
|
Line 426: Line 394:
|[[UC:TT:FGIInTrain|Passenger information inside the train]]
|[[UC:TT:FGIInTrain|Passenger information inside the train]]
|{{Deu|Fahrgastinformation im Zug}}
|{{Deu|Fahrgastinformation im Zug}}
|
|
|
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/interautomation.html Interautomation] (17. 01. 17)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/psi-transcom.html PSI Transcom] and [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP]</font color>
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/interautomation.html Interautomation] (17. 01. 17)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/psi-transcom.html PSI Transcom] and [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP]</font color>
Line 439: Line 406:
|[[UC:IS:PassengerInformationSystem|Passenger Information System]]
|[[UC:IS:PassengerInformationSystem|Passenger Information System]]
|{{Deu|Fahrgast-Informationssystem}}
|{{Deu|Fahrgast-Informationssystem}}
|{{Fra|Système d'information voyageurs}}
|PISY
|PISY
|
|
Line 452: Line 418:
|[[UC:IS:PosessionManagement|Posession Management]]
|[[UC:IS:PosessionManagement|Posession Management]]
|{{Deu|Daten für Betra und Gleissperrungen}}
|{{Deu|Daten für Betra und Gleissperrungen}}
|
|POMA
|POMA
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/siemens-mo-mm-germany.html Siemens Mobility Germany] (10. 01. 22)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft]</font color>
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/siemens-mo-mm-germany.html Siemens Mobility Germany] (10. 01. 22)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft]</font color>
Line 465: Line 430:
|[[UC:IS:PositioningAndMap-Matching|Positioning and Map-Matching]]
|[[UC:IS:PositioningAndMap-Matching|Positioning and Map-Matching]]
|{{Deu|Positionierung und Kartenvergleich}}
|{{Deu|Positionierung und Kartenvergleich}}
|{{Fra|Positionnement et correspondance avec la carte}}
|POSI
|POSI
|
|
Line 478: Line 442:
|[[UC:IS:RailwayInfrastructureRecording|Railway Infrastructure Recording]]
|[[UC:IS:RailwayInfrastructureRecording|Railway Infrastructure Recording]]
|{{Deu|Erfassung der Schieneninfrastruktur}}
|{{Deu|Erfassung der Schieneninfrastruktur}}
|{{Fra|Enregistrement des infrastructures ferroviaires}}
|ISRC
|ISRC
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/bahnkonzept.html Bahnkonzept]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/bahnkonzept.html Bahnkonzept]</font color>
Line 491: Line 454:
|[[UC:IS:Railway Simulation Laboratory|Railway Simulation Laboratory]]
|[[UC:IS:Railway Simulation Laboratory|Railway Simulation Laboratory]]
|{{Deu|Eisenbahnbetriebslabor}}
|{{Deu|Eisenbahnbetriebslabor}}
|{{Fra|Laboratoire de simulation ferroviaire}}
|RLAB
|RLAB
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/czech-technical-university-prague.html Czech Technical University Prague]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/czech-technical-university-prague.html Czech Technical University Prague]</font color>
Line 504: Line 466:
|[[UC:IL:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]
|[[UC:IL:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]
|{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}
|{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}
|{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}
|SCWS
|SCWS
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-austria.html Thales Austria]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-austria.html Thales Austria]</font color>
Line 517: Line 478:
|[[UC:TT:SlotOrdering|Slot ordering]]
|[[UC:TT:SlotOrdering|Slot ordering]]
|{{Deu|Trassenbestellung}}
|{{Deu|Trassenbestellung}}
|
|
|
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/sma-und-partner.html SMA+Partner] (17. 09. 16)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP]</font color>
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/sma-und-partner.html SMA+Partner] (17. 09. 16)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP]</font color>
Line 530: Line 490:
|[[UC:IS:Speeddirectory|Speed directory]]
|[[UC:IS:Speeddirectory|Speed directory]]
|{{Deu|Verzeichnis der zulässigen Geschwindigkeiten}}
|{{Deu|Verzeichnis der zulässigen Geschwindigkeiten}}
|{{Fra|Liste des vitesses autorisées}}
|SPED
|SPED
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/bombadier-transportation.html Bombardier Transportation]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/bombadier-transportation.html Bombardier Transportation]</font color>
Line 543: Line 502:
|[[UC:TT:TAF/TAP TSI|TAF/TAP TSI requirements]]
|[[UC:TT:TAF/TAP TSI|TAF/TAP TSI requirements]]
|{{Deu|TAF/TAP TSI Anforderungen}}
|{{Deu|TAF/TAP TSI Anforderungen}}
|
|
|
|<font color="black">writer: ERA</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/bahnkonzept.html Bahnkonzept]</font color>
|<font color="black">writer: ERA</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/bahnkonzept.html Bahnkonzept]</font color>
Line 556: Line 514:
|[[UC:IS:Timetabling|Timetabling]]
|[[UC:IS:Timetabling|Timetabling]]
|{{Deu|Fahrplanerstellung}}
|{{Deu|Fahrplanerstellung}}
|{{Fra|horaires}}
|ISTT
|ISTT
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/prorail.html ProRail]</font color>
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/prorail.html ProRail]</font color>
Line 569: Line 526:
|[[UC:RS:TractionPowerSupplySimulation|Traction power supply simulation]]
|[[UC:RS:TractionPowerSupplySimulation|Traction power supply simulation]]
|{{Deu|Simulation der Bahnstromversorgung}}
|{{Deu|Simulation der Bahnstromversorgung}}
|
|
|
|
|

Revision as of 13:04, 13 March 2023

Directing Subschema
Involved Subschemas
Implemented in railML® version
(lowest)
Implemented in railML® version
(highest)
Priority
Description (EN) Description (DE)
Abbreviation
Reported by Status
how to interpret the status
Edited
IL IS 3.1 3.2 X Interlocking module engineering data
(former: Interlocking engineering)
Stellwerksprojektierung IMED writer: Thales Germany model March 13th 2023 by User:RailML Coord Documentation
IS 3.1 3.2 X Network statement of an infrastructure manager Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers NEST writer: Správa železnic (former: SŽDC) / ProRail / Bane NOR model April 12th 2024 by User:RailML Orga Ontology
IS 3.1 3.2 X RINF Reporting RINF Meldung RINR writer: SNCF Réseau merged into NEST March 13th 2023 by User:RailML Coord Documentation
IL IS 3.1 3.2 X Routes for timetable simulation
(former: Capacity operational simulation)
Fahrstrassen für Fahrplan simulieren
(ehemals: Leistungsfähigkeit Simulation)
RSIM writer: Jernbanedirektoratet / Bane NOR
(erstwhile: Jernbanedirektoratet Capacity Dpt)
model December 07th 2023 by User:RailML Orga Ontology
IS IL 3.1 3.2 X Schematic Track Plan Schematische Gleisplandarstellung SCTP writer: Jernbanedirektoratet / Bane NOR model February 13th 2023 by User:RailML Orga Ontology
IS TT, IL 3.2 3.2 X Integrated TMS Integriertes Verkehrsmanagement ITMS writer: Bombardier Transportation model February 13th 2023 by User:RailML Orga Ontology
TT IL, IS, RS 3.2 3.2 X Traffic Management Plan writer: Thales;
reviewer: ???
model June 27th 2022 by User:RailML Coord Documentation
IS IL 3.2 3.2 X ETCS track net ETCS writer: Thales Germany model June 12th 2023 by User:RailML Coord Infrastructure
ETCS track net: Input for Detailed Design of ETCS Trackside ETCS-a writer: Thales Germany model June 12th 2023 by User:RailML Coord Infrastructure
ETCS track net: Output of Detailed Design of ETCS Trackside ETCS-b writer: Thales Germany model June 12th 2023 by User:RailML Coord Infrastructure
ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement ETCS-c writer: Thales Germany model June 12th 2023 by User:RailML Coord Infrastructure
TT IS, RS 3.2 3.2 X Passenger information at stations Fahrgastinformation am Bahnhof writer: PSI Transcom (20. 05. 15);
reviewer: init
model March 13th 2023 by User:RailML Coord Documentation
TT IS, RS A timetable for a competition (call for proposals) Ausschreibungsfahrplan writer: iRFP (21. 05. 15);
reviewer: IVU Traffic Technologies (22. 09. 16)
consolidated March 13th 2023 by User:RailML Coord Documentation
TT CO, IS, RS Adopt vehicle working scheduling to timetable changes Umlauf an Jahresfahrplan anpassen writer: IVU Traffic Technologies (21. 05. 15);
reviewer: HaCon Ingenieurgesellschaft
consolidated June 27th 2022 by User:RailML Coord Documentation
TT RS, IS Duty planning and staff shifts Dienstplanung und Personalschichten SHFT writer: ÖBB Personenverkehr;
reviewer: init
consolidated July 18th 2022 by User:RailML Coord Documentation
TT IS, RS Exchange of formation data Austausch von Wagenreihungen/ Behängungsdaten writer: iRFP (21. 05. 15);
reviewer: IVU Traffic Technologies (22. 09. 16)
consolidated March 13th 2023 by User:RailML Coord Documentation
TT IS, RS Long Term Strategic Timetabling Langfrist-Fahrplanerstellung LTST writer: SMA+Partner (22. 12. 16);
reviewer: HaCon Ingenieurgesellschaft (28. 6. 22)
consolidated July 18th 2022 by User:RailML Coord Timetable
TT IS, RS Timetable Information Fahrplanauskunft TINF writer: HaCon Ingenieurgesellschaft (13. 03. 15);
reviewer: IVU Traffic Technologies
consolidated, under revision March 13th 2023 by User:RailML Coord Documentation
IS 2 Track Geometry Gleisgeometrie TRGE writer: ÖBB Infrastruktur review April 15th 2024 by User:RailML Coord Documentation
IS 3 Asset status representation Darstellung des Infrastrukturzustands ASSR writer: DLR for IN2Rail project draft September 27th 2023 by User:RailML Orga Ontology
IS IL 3 CAD for railway signaling CAD für Zugsignalisierung CASP writer: Railcomplete AS draft December 07th 2023 by User:RailML Orga Ontology
IS RS 3 Capacity Planning Kapazitätsplanung CAPL writer: Bane NOR (erstwhile: JBV) draft March 13th 2023 by User:RailML Coord Documentation
IS IL 3 Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen draft March 13th 2023 by User:RailML Coord Documentation
IS TT, RS 2 Driver Advisory System (DAS) Fahrerassistenzsystem DASY writer: IS draft March 13th 2023 by User:RailML Coord Documentation
IS IL, RS, TT Exchange of Logical Train Positions writer: Siemens Mobility Switzerland;
reviewer: ???
draft July 18th 2022 by User:RailML Coord Documentation
IS IL 3 Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Her­stel­lern ISIL writer: IS draft March 13th 2023 by User:RailML Coord Documentation
IL IS 6 Hardware and cable plan Aussenanlage und Kabelplan draft March 13th 2023 by User:RailML Coord Documentation
IL 4 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung writer: Jernbaneverket Signalling Dpt draft March 13th 2023 by User:RailML Coord Documentation
IS RS 3 Maintenance Planning Wartungsplanung MAPL draft March 13th 2023 by User:RailML Coord Documentation
IS 3 NRE Reporting NRE Meldung NRER writer: ÖBB Infrastruktur draft March 13th 2023 by User:RailML Coord Documentation
IL IS 4 Operation and Control Betriebsführung draft March 13th 2023 by User:RailML Coord Documentation
RS IS, TT, IL Operational simulation Betriebssimulation draft March 13th 2023 by User:RailML Coord Documentation
TT IS, RS Passenger information inside the train Fahrgastinformation im Zug writer: Interautomation (17. 01. 17);
reviewer: PSI Transcom and iRFP
draft June 27th 2022 by User:RailML Coord Documentation
IS RS, TT 2 Passenger Information System Fahrgast-Informationssystem PISY draft March 13th 2023 by User:RailML Coord Documentation
IS Posession Management Daten für Betra und Gleissperrungen POMA writer: Siemens Mobility Germany (10. 01. 22);
reviewer: HaCon Ingenieurgesellschaft
draft July 18th 2022 by User:RailML Coord Documentation
IS 3 Positioning and Map-Matching Positionierung und Kartenvergleich POSI draft March 13th 2023 by User:RailML Coord Documentation
IS 2 Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC writer: Bahnkonzept draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Railway Simulation Laboratory Eisenbahnbetriebslabor RLAB writer: Czech Technical University Prague draft June 27th 2022 by User:RailML Coord Documentation
IL IL 5 Site preparation data for Signal Controlled Warning Systems Daten zur Standortvorbereitung für Rottenwarnsysteme SCWS writer: Thales Austria draft March 13th 2023 by User:RailML Coord Documentation
TT IS, RS Slot ordering Trassenbestellung writer: SMA+Partner (17. 09. 16);
reviewer: iRFP
draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED writer: Bombardier Transportation draft March 13th 2023 by User:RailML Coord Documentation
TT IS TAF/TAP TSI requirements TAF/TAP TSI Anforderungen writer: ERA;
reviewer: Bahnkonzept
draft December 07th 2023 by User:RailML Coord Timetable
IS TT, IL, RS 3 Timetabling Fahrplanerstellung ISTT writer: ProRail draft March 13th 2023 by User:RailML Coord Documentation
RS IS, TT Traction power supply simulation Simulation der Bahnstromversorgung draft March 13th 2023 by User:RailML Coord Documentation