Template:UC:Use cases/table: Difference between revisions

From railML 3 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
No edit summary
No edit summary
Line 8: Line 8:
|3.2
|3.2
|X
|X
| [[UC:IL:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated
| [[UC:IL:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']]  
| {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}}  
|{{Fra|<br />''(ancien: Simulation de la capacité)''}}
|RSIM
|Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)
| consolidated
|{{edited|UC:IL:Simulation}}
|{{edited|UC:IL:Simulation}}
|-
|-
Line 15: Line 20:
|3.1
|3.1
|3.2
|3.2
| X || [[UC:IL:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[UC:IL:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[UC:IL:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated
| X  
| [[UC:IL:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']]  
| [[UC:IL:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]]  
| [[UC:IL:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]]  
| IMED  
| Thales Germany  
| consolidated
|{{edited|UC:IL:InterlockingEngineering}}
|{{edited|UC:IL:InterlockingEngineering}}
|-
|-
Line 330: Line 341:
|
|
|
|
| 4 || [[UC:IL:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}||  || || draft
| 4  
| [[UC:IL:OperationAndControl|Operation and Control]]
|{{Deu|Betriebsführung}}
|{{Fra|Commande et Control}}
|   
|  
| draft
|{{edited|UC:IL:OperationAndControl}}
|{{edited|UC:IL:OperationAndControl}}
|-
|-
Line 350: Line 367:
|
|
|
|
| 4 || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
| 4  
| [[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]]  
| [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]]  
| [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]]  
|  
| Jernbaneverket Signalling Dpt  
| draft
|{{edited|UC:IL:InterlockEngineeringForSignallingWithinJBV}}
|{{edited|UC:IL:InterlockEngineeringForSignallingWithinJBV}}
|-
|-
Line 357: Line 380:
|
|
|
|
| 5 || [[UC:IL:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft
| 5  
| [[UC:IL:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]
|{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}  
|{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}
| SCWS
|Thales Austria
| draft
|{{edited|UC:IL:SitePreparationDataForSignalControlledWarningSystems}}
|{{edited|UC:IL:SitePreparationDataForSignalControlledWarningSystems}}
|-
|-
Line 364: Line 393:
|
|
|
|
| 6 || [[UC:IL:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft
| 6  
| [[UC:IL:HardwareAndCablePlan|Hardware and cable plan]]
|{{Deu|Aussenanlage und Kabelplan}}
|{{Fra|Plan matériel et câble}}
|  
|  
| draft
|{{edited|UC:IL:HardwareAndCablePlan}}
|{{edited|UC:IL:HardwareAndCablePlan}}
|-
|-

Revision as of 14:09, 8 February 2023

Directing Subschema
Involved Subschemas
Implemented in railML® version
(lowest)
Implemented in railML® version
(highest)
Priority
Description (EN) Description (DE) Description (FR)
Abbreviation
Reported by Status
how to interpret the status
Edited
IL IS 3.1 3.2 X Routes for timetable simulation
(former: Capacity operational simulation)
Fahrstrassen für Fahrplan simulieren
(ehemals: Leistungsfähigkeit Simulation)
RSIM Jernbanedirektoratet/BaneNOR
(erstwhile: Jernbanedirektoratet Capacity Dpt)
consolidated December 07th 2023 by User:RailML Orga Ontology
IL 3.1 3.2 X Interlocking module engineering data
(former: Interlocking engineering)
Stellwerksprojektierung [[UC:IL:InterlockingEngineering|]] IMED Thales Germany consolidated March 13th 2023 by User:RailML Coord Documentation
IS 3.1 3.2 X Schematic Track Plan Schematische Gleisplandarstellung SCTP JBD/BaneNOR consolidated February 13th 2023 by User:RailML Orga Ontology
IS 3.1 3.2 X Network statement of an infrastructure manager Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers NEST SŽDC/​ProRail/​BaneNOR consolidated April 12th 2024 by User:RailML Orga Ontology
IS IL 3.2 3.2 X ETCS track net ETCS Thales consolidated June 12th 2023 by User:RailML Coord Infrastructure
IS IL 3.2 3.2 X ETCS track net ETCS-a Thales consolidated June 12th 2023 by User:RailML Coord Infrastructure
IS IL 3.2 3.2 X ETCS track net ETCS-b Thales consolidated June 12th 2023 by User:RailML Coord Infrastructure
IS IL 3.2 3.2 X ETCS track net ETCS-c Thales consolidated June 12th 2023 by User:RailML Coord Infrastructure
TT RS, IS Duty planning and staff shifts Dienstplanung und Personalschichten SHFT writer: ÖBB Personenverkehr;
reviewer: INIT
consolidated July 18th 2022 by User:RailML Coord Documentation
TT Long Term Strategic Timetabling Langfrist-Fahrplanerstellung LTST writer: SMA (22.12.16); reviewer: HaCon (28.06.22) consolidated July 18th 2022 by User:RailML Coord Timetable
TT 3.2 3.2 X Passenger information at stations Fahrgastinformation am Bahnhof writer: PSI (20.05.15); reviewer: Init consolidated March 13th 2023 by User:RailML Coord Documentation
TT Adopt vehicle working scheduling to timetable changes Umlauf an Jahresfahrplan anpassen writer: IVU (21.05.15) ; reviewer: HaCon consolidated June 27th 2022 by User:RailML Coord Documentation
TT Exchange of formation data Austausch von Wagenreihungen/ Behängungsdaten writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated March 13th 2023 by User:RailML Coord Documentation
TT A timetable for a competition (call for proposals) Ausschreibungsfahrplan writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated March 13th 2023 by User:RailML Coord Documentation
TT Timetable Information Fahrplanauskunft TINF writer: HaCon (13.03.15); reviewer: IVU consolidated, under revision March 13th 2023 by User:RailML Coord Documentation
IS 3.1 3.2 X RINF Reporting RINF Meldung RINR SNCF Réseau merged into NEST March 13th 2023 by User:RailML Coord Documentation
IS 2 Track Geometry Gleisgeometrie TRGE ÖBB Infrastruktur review April 15th 2024 by User:RailML Coord Documentation
IS TT, IL 3.2 3.2 X Integrated TMS Integriertes Verkehrsmanagement ITMS Bombardier draft February 13th 2023 by User:RailML Orga Ontology
TT IL, IS, RS 3.2 3.2 X Traffic Management Plan writer: Thales; reviewer: ??? draft June 27th 2022 by User:RailML Coord Documentation
IS 2 Passenger Information System Fahrgast-Informationssystem PISY draft March 13th 2023 by User:RailML Coord Documentation
IS TT 2 Driver Advisory System (DAS) Fahrerassistenzsystem DASY IS draft March 13th 2023 by User:RailML Coord Documentation
IS 2 Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC Bahnkonzept draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Positioning and Map-Matching Positionierung und Kartenvergleich POSI draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Asset status representation Darstellung des Infrastrukturzustands ASSR DLR for IN2Rail project draft September 27th 2023 by User:RailML Orga Ontology
IS 3 Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Her­stel­lern ISIL IS draft March 13th 2023 by User:RailML Coord Documentation
IL 4 Operation and Control Betriebsführung draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Maintenance Planning Wartungsplanung MAPL draft March 13th 2023 by User:RailML Coord Documentation
IL 4 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung [[UC:IL:InterlockEngineeringForSignallingWithinJBV|]] Jernbaneverket Signalling Dpt draft March 13th 2023 by User:RailML Coord Documentation
IL 5 Site preparation data for Signal Controlled Warning Systems Daten zur Standortvorbereitung für Rottenwarnsysteme SCWS Thales Austria draft March 13th 2023 by User:RailML Coord Documentation
IL 6 Hardware and cable plan Aussenanlage und Kabelplan draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Capacity Planning Kapazitätsplanung CAPL JBV/BaneNOR draft March 13th 2023 by User:RailML Coord Documentation
IS 3 NRE Reporting NRE Meldung NRER ÖBB Infrastruktur draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED ÖBB Infrastruktur draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Timetabling Fahrplanerstellung ISTT ProRail draft March 13th 2023 by User:RailML Coord Documentation
IS 3 CAD for railway signaling CAD für Zugsignalisierung CASP RailComplete draft December 07th 2023 by User:RailML Orga Ontology
IS 3 Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Railway Simulation Laboratory Eisenbahnbetriebslabor RLAB ČVUT draft June 27th 2022 by User:RailML Coord Documentation
TT TAF/TAP TSI requirements TAF/TAP TSI Anforderungen writer: ERA; reviewer: Bahnkonzept draft December 07th 2023 by User:RailML Coord Timetable
TT Slot ordering Trassenbestellung writer: SMA (17.09.16); reviewer: iRFP draft March 13th 2023 by User:RailML Coord Documentation
TT Passenger information inside the train Fahrgastinformation im Zug writer: Interautomation (17.01.17); reviewer: PSI and iRFP draft June 27th 2022 by User:RailML Coord Documentation
IS IL, RS, TT Exchange of Logical Train Positions writer: Siemens Switzerland; reviewer: ??? draft July 18th 2022 by User:RailML Coord Documentation
IS Posession Management Daten für Betra und Gleissperrungen POMA writer: Siemens Germany (10.01.22); reviewer: HaCon draft July 18th 2022 by User:RailML Coord Documentation
RS Traction power supply simulation Simulation der Bahnstromversorgung March 13th 2023 by User:RailML Coord Documentation
RS Operational simulation Betriebssimulation March 13th 2023 by User:RailML Coord Documentation
IS 9 Railway Infrastructure Visualisation Visualisierung von Schieneninfrastruktur ISVI outdated March 13th 2023 by User:RailML Coord Documentation