Search results
Jump to navigation
Jump to search
- train number field, timetable element) to the next. For example, one use case is a TMS that provides the current (dispatching) timetable and train positions16 KB (1,407 words) - 11:50, 18 July 2022
- UC:Use cases (section What is a use case?)(UML). Examples are solutions to use cases. CO Use Cases – IL Use Cases – IS Use Cases – RS Use Cases – TT Use Cases View/edit list on the separate source7 KB (287 words) - 15:43, 8 April 2024
- essential for the use case or considered optional. Please describe what data is exchanged for the use case. What is part and what is not part of the data exchange2 KB (263 words) - 17:26, 5 February 2024
- Dev:Use cases (section What is a use case?)for the use case or considered optional. Characterizing data Please describe what data is exchanged for the use case. What is part and what is not part7 KB (1,035 words) - 17:27, 5 February 2024
- offline simulation for capacity management. Implicitly, train dispatching is seen as a logical prolongation of a detailed timetable. At disruptions during3 KB (343 words) - 13:44, 13 March 2023
- be assembled and visualised. For this purpose, railML infrastructure data is to be supplemented with basic information on the type, extent, and localization4 KB (354 words) - 16:37, 4 December 2023
- exchanged is bigger than in use case ETCS-a because data such as balises or routes will be added. The amount of the data to be exchanged is the same as5 KB (441 words) - 09:30, 12 June 2023
- signalling; CAD für Zugsignalisierung Engineers of the railway signaling discipline use a Computer-Aided Design (CAD) tool to model a railway construction project1 KB (127 words) - 14:12, 7 December 2023
- UC:IS:RailwayInfrastructureVisualisation (category Use case (IS)) (section Use case / Anwendungsfall)Visualisation (RAIV) Subschema: Infrastructure For general information on use cases see UC:Use cases2 KB (180 words) - 13:43, 13 March 2023
- will also be responsible for RINF Reporting to the European Union. This use case describes the current structure of the yearly report of ÖBB Infrastructure2 KB (225 words) - 13:45, 13 March 2023
- other hand. It is a combination of defined organizational processes and a complete database application system. This database system is receiver and sender3 KB (117 words) - 13:45, 13 March 2023
- UC:IS:CaptureSchematicVisualisationInformationOfTrackAssets (category Use case (IS)) (section Use case / Anwendungsfall)von Schienenanlagen railML data will be used for engineering signalling and interlocking systems. Engineers are used to working with paper plans that schematically3 KB (383 words) - 13:44, 13 March 2023
- existing topology database is based on the track circuits. In order to enable desired functions, the creation of the data model is essential to become a basis3 KB (427 words) - 17:57, 27 June 2022
- Schematic Track Plan Infrastructure managers use maps for the visualization of their railway infrastructure. These maps comprise: Geographic maps Geoschematic4 KB (198 words) - 16:57, 13 February 2023
- IS:isSpeedSignal (category Pages using Tabber parser tag)according to [1] <isValid> is used to mark a start and end days. [1] https://documents.railml.org/schemas/usecase/railml-use-case_is-nest.pdf2 KB (205 words) - 15:47, 24 March 2023
- detailed that is envisioned for this use case is a microscopic description of the timetable. The use case is divided into three sub-use cases based on the6 KB (858 words) - 12:09, 25 March 2024
- the maintenance planning system of the infrastructure manager. The data flow is one-directional: It goes from the (central) asset management source data base1 KB (133 words) - 13:47, 13 March 2023
- information system of the same (or another) infrastructure manager. The data flow is one-directional: It goes from the resource planning system to the passenger1 KB (157 words) - 13:46, 13 March 2023
- control. This use case aims to cover all data exchange necessary for the functions listed above. A major difference to previous railML use cases is that this2 KB (179 words) - 17:27, 13 February 2023
- access and use of the rail network (route network) of the infrastructure manager. It provides all the technical and operational information that is necessary2 KB (169 words) - 11:34, 12 April 2024
- main element for this schema is <rollingstock>, which is the root for data about any rolling stock. It is intended to use this data schema for vehicle3 KB (458 words) - 17:20, 29 November 2023
- Infrastructure Reported by: Bahnkonzept For general information on use cases see UC:Use cases3 KB (335 words) - 13:48, 13 March 2023
- railML® for RINF Reporting; railML® für RINF Meldung This use case aims at providing a railML3 file, fulfilling the functional requirements published by3 KB (297 words) - 13:49, 13 March 2023
- UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers (category Use case (IS)) (section Use case / Anwendungsfall)software), have to be given to the supplier. The content of the data exchange is the result of the planning process, so the data are provided by a specialized3 KB (367 words) - 13:47, 13 March 2023
- Advisory System (DAS); Fahrerassistentsystem The Driver Advisory System (DAS) is an on-train driver support system which advises a driver on the most energy-efficient3 KB (306 words) - 13:48, 13 March 2023
- positioning system, which is a multi-sensor on-board positioning device, the train can determine its position itself. The digital map is a key component of such3 KB (367 words) - 13:49, 13 March 2023
- The infrastructure used in this use case is not based on the current infrastructure but an agreed future infrastructure state. It is important that any4 KB (523 words) - 11:14, 18 July 2022
- The objective of a possession is to ensure safe construction/maintenance works on the railway infrastructure. The safety is ensured by a set of safety measures:3 KB (394 words) - 12:02, 18 July 2022
- infrastructure is pulled from an asset management database. Future infrastructure is designed by hand from technical drawings. The timetable model is tested either5 KB (687 words) - 13:46, 13 March 2023
- verify the results of the work in very detailed manner. The track geometry use case deals with two major data flows between two major components. They are5 KB (737 words) - 16:12, 15 April 2024
- Interlocking Rollingstock The use case comprises static and dynamic (status) asset data. For infrastructure, the focus is only on static data. Small (operational10 KB (129 words) - 16:01, 27 September 2023
- Infrastructure (section Infrastructure (IS))IS root element — IS use cases — Concepts & examples The railML® Infrastructure subschema is focused on the description of the railway network infrastructure3 KB (288 words) - 18:47, 20 March 2024
- Current UML visualization A list of use cases for railML's interlocking scheme can be found here Category:Use_case_(IL). Interlocking Concepts — explanations1 KB (153 words) - 18:26, 3 November 2023
- electrical simulation is not possible with the necessary accuracy without simulating the process of railway operation. Thus this use case is always an addon2 KB (236 words) - 13:43, 13 March 2023
- Description of parallel work is not included in this use case. For the purposes of this use case, the vehicle group is represented by vehicle types that6 KB (926 words) - 17:00, 4 December 2023
- capacity operational simulation tools use their own internal generic interlocking (table) model. Thus this use case does not require a interlocking table7 KB (959 words) - 14:06, 7 December 2023
- IL:derailerIL (category Pages using Tabber parser tag)preferred position is the derailing one, which is automatically assumed after use. In addition the relation to the switch pt_swi03 is marked causing an5 KB (484 words) - 12:44, 27 May 2022
- this use case is the process description and the minimum data content for the timetable data exchange. The used data format is EDIFACT. The use case shall4 KB (592 words) - 18:06, 7 December 2023
- (sofern der Art entsprechend) Erforderliche Qualifikationen Der Use Case baut auf dem Use Case Fahrplanauskunft auf, das heißt für Dienste, die auf einer Fahrt3 KB (410 words) - 12:04, 18 July 2022
- offers a number of Use Cases. A Guideline to implementing Use Cases can be found under Dev:Use cases. In contrast to railML® 2, railML® 3 is not supposed to12 KB (1,475 words) - 15:28, 15 April 2024
- and print material as well as ticketing and real-time information. This use case will focus on the definition of the minimum requirements for passenger5 KB (751 words) - 13:28, 13 March 2023
- IL:switchIL (category Pages using Tabber parser tag)type is called switchIL in railML interlocking subschema, whereas its counterpart in infrastructure is called switchIS. The switch is commonly used for19 KB (1,714 words) - 09:32, 3 May 2023
- IL:conflictingRoute (category Pages using Tabber parser tag)value is used in case of any TVD section of the route is also used by the conflicting one. ConflictingHeadProtection – This value is used in case any signal5 KB (573 words) - 12:09, 28 May 2022
- with us. To learn where to find, how to use and how to contribute use cases see Dev:Use cases. While use cases follow a top-down approach, starting out5 KB (674 words) - 15:49, 15 April 2024
- for a railML® use case: A timetable for a competition (call for proposals) Ausschreibungsfahrplan The use case describes a timetable which is transferred16 KB (1,903 words) - 13:27, 13 March 2023
- Main Page (section Infrastructure (IS))and track conditions. A list of use cases for the railML® infrastructure schema can be found on page Category:Use case (IS). →Main Article: Rollingstock10 KB (1,042 words) - 15:08, 3 April 2024
- Operational simulation; Betriebssimulation For various purposes it is necessary to simulate the process of railway operation for a fragment or an entire1 KB (146 words) - 13:29, 13 March 2023
- attributes. In case of consuming "wrong styled" id values the importing software is not required to extract semantics encoded in the id value. The use of this5 KB (463 words) - 12:22, 3 November 2023
- UC:TT:AdoptVehicleWorkingSchedulingToTimetableChanges (category Use case (TT)) (section Use case / Anwendungsfall)complete timetable for vehicle working scheduling_. Postcondition The train is changed within the validity of the change request, and unchanged outside.2 KB (209 words) - 18:11, 27 June 2022
- This use case covers the ordering of slots by Railway Undertakings from Infrastructure Manager(s) and other managers of capacity. A related use case will2 KB (273 words) - 13:26, 13 March 2023