Template:UC:Use cases/table
Jump to navigation
Jump to search
Directing Subschema |
Involved Subschemas |
Implemented in railML® version (lowest) |
Implemented in railML® version (highest) |
Priority |
Description (EN) | Description (DE) | Description (FR) | Abbreviation |
Reported by | Status how to interpret the status |
Edited |
---|---|---|---|---|---|---|---|---|---|---|---|
IL | IS | 3.1 | 3.2 | X | Routes for timetable simulation (former: Capacity operational simulation) |
Fahrstrassen für Fahrplan simulieren (ehemals: Leistungsfähigkeit Simulation) |
RSIM | Jernbanedirektoratet/BaneNOR (erstwhile: Jernbanedirektoratet Capacity Dpt) |
consolidated | January 20th 2025 by User:RailML Coord Documentation | |
IL | 3.1 | 3.2 | X | Interlocking module engineering data (former: Interlocking engineering) |
Stellwerksprojektierung | [[UC:IL:InterlockingEngineering|]] | IMED | Thales Germany | consolidated | January 20th 2025 by User:RailML Coord Documentation | |
IS | 3.1 | 3.2 | X | Schematic Track Plan | Schematische Gleisplandarstellung | SCTP | JBD/BaneNOR | consolidated | February 21st 2025 by User:RailML Orga Ontology | ||
IS | 3.1 | 3.2 | X | Network statement of an infrastructure manager | Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers | NEST | SŽDC/ProRail/BaneNOR | consolidated | January 24th 2025 by User:RailML Orga Ontology | ||
IS | IL | 3.2 | 3.2 | X | ETCS track net | ETCS | Thales | consolidated | January 20th 2025 by User:RailML Coord Documentation | ||
ETCS track net | ETCS-a | Thales | consolidated | January 20th 2025 by User:RailML Coord Documentation | |||||||
ETCS track net | ETCS-b | Thales | consolidated | January 20th 2025 by User:RailML Coord Documentation | |||||||
ETCS track net | ETCS-c | Thales | consolidated | January 20th 2025 by User:RailML Coord Documentation | |||||||
TT | RS, IS | Duty planning and staff shifts | Dienstplanung und Personalschichten | SHFT | writer: ÖBB Personenverkehr; reviewer: INIT |
consolidated | January 24th 2025 by User:RailML Coord Documentation | ||||
TT | Long Term Strategic Timetabling | Langfrist-Fahrplanerstellung | LTST | writer: SMA (22.12.16); reviewer: HaCon (28.06.22) | consolidated | July 18th 2022 by User:RailML Coord Timetable | |||||
TT | 3.2 | 3.2 | X | Passenger information at stations | Fahrgastinformation am Bahnhof | writer: PSI (20.05.15); reviewer: Init | consolidated | February 19th 2025 by User:RailML Coord Timetable | |||
TT | Adopt vehicle working scheduling to timetable changes | Umlauf an Jahresfahrplan anpassen | writer: IVU (21.05.15) ; reviewer: HaCon | consolidated | June 27th 2022 by User:RailML Coord Documentation | ||||||
TT | Exchange of formation data | Austausch von Wagenreihungen/ Behängungsdaten | writer: iRFP (21.05.15); reviewer: IVU (22.09.16) | consolidated | March 13th 2023 by User:RailML Coord Documentation | ||||||
TT | A timetable for a competition (call for proposals) | Ausschreibungsfahrplan | writer: iRFP (21.05.15); reviewer: IVU (22.09.16) | consolidated | March 13th 2023 by User:RailML Coord Documentation | ||||||
TT | Timetable Information | Fahrplanauskunft | TINF | writer: HaCon (13.03.15); reviewer: IVU | consolidated, under revision | March 13th 2023 by User:RailML Coord Documentation | |||||
IS | 3.1 | 3.2 | X | RINF Reporting | RINF Meldung | RINR | SNCF Réseau | merged into NEST | January 20th 2025 by User:RailML Coord Documentation | ||
IS | 2 | Track Geometry | Gleisgeometrie | TRGE | ÖBB Infrastruktur | review | April 15th 2024 by User:RailML Coord Documentation | ||||
IS | TT, IL | 3.2 | 3.2 | X | Integrated TMS | Integriertes Verkehrsmanagement | ITMS | Bombardier | draft | FIXME Page does not exist yet. | |
TT | IL, IS, RS | 3.2 | 3.2 | X | Traffic Management Plan | writer: Thales; reviewer: ??? | draft | FIXME Page does not exist yet. | |||
IS | 2 | Passenger Information System | Fahrgast-Informationssystem | PISY | draft | March 13th 2023 by User:RailML Coord Documentation | |||||
IS | TT | 2 | Driver Advisory System (DAS) | Fahrerassistenzsystem | DASY | IS | draft | March 13th 2023 by User:RailML Coord Documentation | |||
IS | 2 | Railway Infrastructure Recording | Erfassung der Schieneninfrastruktur | ISRC | Bahnkonzept | draft | January 20th 2025 by User:RailML Coord Documentation | ||||
IS | 3 | Positioning and Map-Matching | Positionierung und Kartenvergleich | POSI | draft | March 13th 2023 by User:RailML Coord Documentation | |||||
IS | 3 | Asset status representation | Darstellung des Infrastrukturzustands | ASSR | DLR for IN2Rail project | draft | November 25th 2024 by User:Gulruh Farmonova | ||||
IS | 3 | Exchange of planning parameters for interlocking with suppliers | Austausch von Planungsparametern für Stellwerke mit Herstellern | ISIL | IS | draft | November 25th 2024 by User:Gulruh Farmonova | ||||
IL | 4 | Operation and Control | Betriebsführung | draft | March 13th 2023 by User:RailML Coord Documentation | ||||||
IS | 3 | Maintenance Planning | Wartungsplanung | MAPL | draft | March 13th 2023 by User:RailML Coord Documentation | |||||
IL | 4 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | [[UC:IL:InterlockEngineeringForSignallingWithinJBV|]] | Jernbaneverket Signalling Dpt | draft | November 25th 2024 by User:RailML Coord Documentation | ||||
IL | 5 | Site preparation data for Signal Controlled Warning Systems | Daten zur Standortvorbereitung für Rottenwarnsysteme | SCWS | Thales Austria | draft | March 13th 2023 by User:RailML Coord Documentation | ||||
IL | 6 | Hardware and cable plan | Aussenanlage und Kabelplan | draft | March 13th 2023 by User:RailML Coord Documentation | ||||||
IS | 3 | Capacity Planning | Kapazitätsplanung | CAPL | JBV/BaneNOR | draft | November 25th 2024 by User:Gulruh Farmonova | ||||
IS | 3 | NRE Reporting | NRE Meldung | NRER | ÖBB Infrastruktur | draft | November 25th 2024 by User:Gulruh Farmonova | ||||
IS | 3 | Speed directory | Verzeichnis der zulässigen Geschwindigkeiten | SPED | ÖBB Infrastruktur | draft | November 25th 2024 by User:Gulruh Farmonova | ||||
IS | 3 | Timetabling | Fahrplanerstellung | ISTT | ProRail | draft | November 25th 2024 by User:Gulruh Farmonova | ||||
IS | 3 | CAD for railway signaling | CAD für Zugsignalisierung | CASP | RailComplete | draft | November 25th 2024 by User:Gulruh Farmonova | ||||
IS | 3 | Capture schematic visualisation information of track assets | Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen | draft | March 13th 2023 by User:RailML Coord Documentation | ||||||
IS | 3 | Railway Simulation Laboratory | Eisenbahnbetriebslabor | RLAB | ČVUT | draft | June 27th 2022 by User:RailML Coord Documentation | ||||
TT | TAF/TAP TSI requirements | TAF/TAP TSI Anforderungen | writer: ERA; reviewer: Bahnkonzept | draft | January 20th 2025 by User:RailML Coord Documentation | ||||||
TT | Slot ordering | Trassenbestellung | writer: SMA (17.09.16); reviewer: iRFP | draft | September 23rd 2024 by User:RailML Orga Ontology | ||||||
TT | Passenger information inside the train | Fahrgastinformation im Zug | writer: Interautomation (17.01.17); reviewer: PSI and iRFP | draft | June 04th 2024 by User:RailML Coord Timetable | ||||||
IS | IL, RS, TT | Exchange of Logical Train Positions | writer: Siemens Switzerland; reviewer: ??? | draft | July 18th 2022 by User:RailML Coord Documentation | ||||||
IS | Posession Management | Daten für Betra und Gleissperrungen | POMA | writer: Siemens Germany (10.01.22); reviewer: HaCon | draft | January 20th 2025 by User:RailML Coord Documentation | |||||
RS | Traction power supply simulation | Simulation der Bahnstromversorgung | March 13th 2023 by User:RailML Coord Documentation | ||||||||
RS | Operational simulation | Betriebssimulation | March 13th 2023 by User:RailML Coord Documentation |