Template:UC:Use cases/table
Jump to navigation
Jump to search
Directing Subschema |
Involved Subschemas |
Implemented in railML® version |
Priority |
Description (EN) | Description (DE) | Description (FR) | Abbreviation |
Reported by | Status how to interpret the status |
---|---|---|---|---|---|---|---|---|---|
IL | IS | 3.1 | X | Routes for timetable simulation (former: Capacity operational simulation) |
Fahrstrassen für Fahrplan simulieren (ehemals: Leistungsfähigkeit Simulation) |
RSIM | Jernbanedirektoratet/BaneNOR (erstwhile: Jernbanedirektoratet Capacity Dpt) |
consolidated | |
IL | 3.1 | X | Interlocking module engineering data (former: Interlocking engineering) |
Stellwerksprojektierung | [[UC:IL:InterlockingEngineering|]] | IMED | Thales Germany | consolidated | |
IL | 3 | Data prepration for signalling | Datenbereitstellung für Stellwerkssysteme | [[UC:IL:EulynxDataPreparationInterlocking|]] | DPRS | EULYNX (erstwhile) | draft | ||
IL | 3 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | [[UC:IL:InterlockEngineeringForSignallingWithinJBV|]] | Jernbaneverket Signalling Dpt | draft | |||
IL | 4 | Operation and Control | Betriebsführung | draft | |||||
IL | 5 | Site preparation data for Signal Controlled Warning Systems | Daten zur Standortvorbereitung für Rottenwarnsysteme | SCWS | Thales Austria | draft | |||
IL | 6 | Hardware and cable plan | Aussenanlage und Kabelplan | draft | |||||
IS | 3.1 | X | Network statement of an infrastructure manager | Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers | NEST | SŽDC/ProRail/BaneNOR | consolidated | ||
IS | 3.1 | X | Schematic Track Plan | Schematische Gleisplandarstellung | SCTP | JBD/BaneNOR | consolidated | ||
IS | 3.1 | X | RINF Reporting | RINF Meldung | RINR | SNCF Réseau | merged into NEST | ||
IS | TT, IL | 2 | Integrated TMS | Integriertes Verkehrsmanagement | ITMS | Bombardier | draft | ||
IS | 2 | Track Geometry | Gleisgeometrie | TRGE | ÖBB Infrastruktur | review | |||
IS | 2 | Positioning and Map-Matching | Positionierung und Kartenvergleich | POSI | draft | ||||
IS | 2 | Asset status representation | Darstellung des Infrastrukturzustands | ASSR | DLR for IN2Rail project | draft | |||
IS | 3 | Railway Infrastructure Recording | Erfassung der Schieneninfrastruktur | ISRC | Bahnkonzept | draft | |||
IS | TT | 3 | Driver Advisory System (DAS) | Fahrerassistenzsystem | DASY | IS | draft | ||
IS | 3 | Exchange of planning parameters for interlocking with suppliers | Austausch von Planungsparametern für Stellwerke mit Herstellern | ISIL | IS | draft | |||
IS | 3 | Maintenance Planning | Wartungsplanung | MAPL | draft | ||||
IS | 3 | Passenger Information System | Fahrgast-Informationssystem | PISY | draft | ||||
IS | 3 | Capacity Planning | Kapazitätsplanung | CAPL | JBV/BaneNOR | draft | |||
IS | 3 | NRE Reporting | NRE Meldung | NRER | ÖBB Infrastruktur | draft | |||
IS | 3 | Speed directory | Verzeichnis der zulässigen Geschwindigkeiten | SPED | ÖBB Infrastruktur | draft | |||
IS | 3 | Timetabling | Fahrplanerstellung | ISTT | ProRail | draft | |||
IS | 3 | CAD for railway signaling | CAD für Zugsignalisierung | CASP | RailComplete | draft | |||
IS | 3 | Capture schematic visualisation information of track assets | Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen | draft | |||||
IS | 3 | Railway Simulation Laboratory | Eisenbahnbetriebslabor | RLAB | ČVUT | draft | |||
IS | 9 | Railway Infrastructure Visualisation | Visualisierung von Schieneninfrastruktur | ISVI | outdated | ||||
IS | IL | 3 | ETCS track net | ETCS | Thales | draft | |||
RS | Traction power supply simulation | Simulation der Bahnstromversorgung | |||||||
RS | Operational simulation | Betriebssimulation | |||||||
TT | Timetable Information | Fahrplanauskunft | writer: HaCon (13.03.15); reviewer: IVU | consolidated | |||||
TT | 1 | Passenger information at stations | Fahrgastinformation am Bahnhof | writer: PSI (20.05.15); reviewer: Init | consolidated | ||||
TT | A timetable for a competition (call for proposals) | Ausschreibungsfahrplan | writer: iRFP (21.05.15); reviewer: IVU (22.09.16) | consolidated | |||||
TT | Import complete timetable for vehicle working scheduling and vehicle workings | Umlaufbildung Fahrzeuge Jahresfahrplan | writer: IVU (20.05.15); reviewer: iRFP | draft | |||||
TT | Adopt vehicle working scheduling to timetable changes | Umlauf an Jahresfahrplan anpassen | writer: IVU (21.05.15) ; reviewer: HaCon | consolidated | |||||
TT | Exchange of formation data | Austausch von Wagenreihungen/ Behängungsdaten | writer: iRFP (21.05.15); reviewer: IVU (22.09.16) | consolidated | |||||
TT | TAF/TAP TSI requirements | TAF/TAP TSI Anforderungen | writer: ERA; reviewer: ??? | draft | |||||
TT | Long Term Strategic Timetabling | Langfrist-Fahrplanerstellung | writer: SMA (22.12.16); reviewer: HaCon | draft | |||||
TT | Slot ordering | Trassenbestellung | writer: SMA (17.09.16); reviewer: iRFP | draft | |||||
TT | Passenger information inside the train | Fahrgastinformation im Zug | writer: Interautomation (17.01.17); reviewer: PSI and iRFP | draft | |||||
TT | Automatic Route Setting (ARS) Automatic Train Supervision (ATS) |
Zuglenkung | writer: Toshiba?; reviewer: PSI |
planned | |||||
TT | Betriebsleitsysteme/RBL | writer: PSI; reviewer: IVU | planned | ||||||
TT | Dienstbildung Personal Jahresfahrplan | writer: INIT; reviewer: IVU | postponed | ||||||
TT | Operational simulation timetable | Betriebssimulation Fahrplan | writer: OTRT?; reviewer: SMA | postponed | |||||
TT | IL, IS, RS | 2 | Traffic Management Plan | writer: Thales; reviewer: ??? | draft |