Template:UC:Use cases/table: Difference between revisions
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
(Data consolidation including default order.) |
(Correction of writer.) |
||
Line 103: | Line 103: | ||
| | | | ||
|ETCS | |ETCS | ||
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/ | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color> | ||
|model | |model | ||
|{{edited|UC:IS:ETCS track net}} | |{{edited|UC:IS:ETCS track net}} | ||
Line 116: | Line 116: | ||
| | | | ||
|ETCS-a | |ETCS-a | ||
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/ | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color> | ||
|model | |model | ||
|{{edited|UC:IS:ETCS track net}} | |{{edited|UC:IS:ETCS track net}} | ||
Line 129: | Line 129: | ||
| | | | ||
|ETCS-b | |ETCS-b | ||
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/ | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color> | ||
|model | |model | ||
|{{edited|UC:IS:ETCS track net}} | |{{edited|UC:IS:ETCS track net}} | ||
Line 142: | Line 142: | ||
| | | | ||
|ETCS-c | |ETCS-c | ||
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/ | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color> | ||
|model | |model | ||
|{{edited|UC:IS:ETCS track net}} | |{{edited|UC:IS:ETCS track net}} | ||
Line 574: | Line 574: | ||
|draft | |draft | ||
|{{edited|UC:RS:TractionPowerSupplySimulation}} | |{{edited|UC:RS:TractionPowerSupplySimulation}} | ||
|}{{interwiki}} | |}{{interwiki}} |
Revision as of 18:38, 23 February 2023
Directing Subschema |
Involved Subschemas |
Implemented in railML® version (lowest) |
Implemented in railML® version (highest) |
Priority |
Description (EN) | Description (DE) | Description (FR) | Abbreviation |
Reported by | Status how to interpret the status |
Edited |
---|---|---|---|---|---|---|---|---|---|---|---|
IL | IS | 3.1 | 3.2 | X | Interlocking module engineering data (former: Interlocking engineering) |
Stellwerksprojektierung | IMED | writer: Thales Germany | model | January 20th 2025 by User:RailML Coord Documentation | |
IS | – | 3.1 | 3.2 | X | Network statement of an infrastructure manager | Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers | NEST | writer: Správa železnic (former: SŽDC) / ProRail / Bane NOR | model | January 24th 2025 by User:RailML Orga Ontology | |
IS | 3.1 | 3.2 | X | RINF Reporting | RINF Meldung | RINR | writer: SNCF Réseau | merged into NEST | January 20th 2025 by User:RailML Coord Documentation | ||
IL | IS | 3.1 | 3.2 | X | Routes for timetable simulation (former: Capacity operational simulation) |
Fahrstrassen für Fahrplan simulieren (ehemals: Leistungsfähigkeit Simulation) |
RSIM | writer: Jernbanedirektoratet / Bane NOR (erstwhile: Jernbanedirektoratet Capacity Dpt) |
model | January 20th 2025 by User:RailML Coord Documentation | |
IS | IL | 3.1 | 3.2 | X | Schematic Track Plan | Schematische Gleisplandarstellung | SCTP | writer: Jernbanedirektoratet / Bane NOR | model | February 21st 2025 by User:RailML Orga Ontology | |
IS | TT, IL | 3.2 | 3.2 | X | Integrated TMS | Integriertes Verkehrsmanagement | ITMS | writer: Bombardier Transportation | model | FIXME Page does not exist yet. | |
TT | IL, IS, RS | 3.2 | 3.2 | X | Traffic Management Plan | writer: Thales; reviewer: ??? |
model | FIXME Page does not exist yet. | |||
IS | IL | 3.2 | 3.2 | X | ETCS track net | ETCS | writer: Thales Germany | model | January 20th 2025 by User:RailML Coord Documentation | ||
ETCS track net: Input for Detailed Design of ETCS Trackside | ETCS-a | writer: Thales Germany | model | January 20th 2025 by User:RailML Coord Documentation | |||||||
ETCS track net: Output of Detailed Design of ETCS Trackside | ETCS-b | writer: Thales Germany | model | January 20th 2025 by User:RailML Coord Documentation | |||||||
ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement | ETCS-c | writer: Thales Germany | model | January 20th 2025 by User:RailML Coord Documentation | |||||||
TT | IS, RS | 3.2 | 3.2 | X | Passenger information at stations | Fahrgastinformation am Bahnhof | writer: PSI Transcom (20. 05. 15); reviewer: init |
model | February 19th 2025 by User:RailML Coord Timetable | ||
TT | IS, RS | A timetable for a competition (call for proposals) | Ausschreibungsfahrplan | writer: iRFP (21. 05. 15); reviewer: IVU Traffic Technologies (22. 09. 16) |
consolidated | March 13th 2023 by User:RailML Coord Documentation | |||||
TT | CO, IS, RS | Adopt vehicle working scheduling to timetable changes | Umlauf an Jahresfahrplan anpassen | writer: IVU Traffic Technologies (21. 05. 15); reviewer: HaCon Ingenieurgesellschaft |
consolidated | June 27th 2022 by User:RailML Coord Documentation | |||||
TT | RS, IS | Duty planning and staff shifts | Dienstplanung und Personalschichten | SHFT | writer: ÖBB Personenverkehr; reviewer: init |
consolidated | January 24th 2025 by User:RailML Coord Documentation | ||||
TT | IS, RS | Exchange of formation data | Austausch von Wagenreihungen/ Behängungsdaten | writer: iRFP (21. 05. 15); reviewer: IVU Traffic Technologies (22. 09. 16) |
consolidated | March 13th 2023 by User:RailML Coord Documentation | |||||
TT | IS, RS | Long Term Strategic Timetabling | Langfrist-Fahrplanerstellung | LTST | writer: SMA+Partner (22. 12. 16); reviewer: HaCon Ingenieurgesellschaft (28. 6. 22) |
consolidated | July 18th 2022 by User:RailML Coord Timetable | ||||
TT | IS, RS | Timetable Information | Fahrplanauskunft | TINF | writer: HaCon Ingenieurgesellschaft (13. 03. 15); reviewer: IVU Traffic Technologies |
consolidated, under revision | March 13th 2023 by User:RailML Coord Documentation | ||||
IS | – | 2 | Track Geometry | Gleisgeometrie | TRGE | writer: ÖBB Infrastruktur | review | April 15th 2024 by User:RailML Coord Documentation | |||
IS | 3 | Asset status representation | Darstellung des Infrastrukturzustands | ASSR | writer: DLR for IN2Rail project | draft | November 25th 2024 by User:Gulruh Farmonova | ||||
IS | IL | 3 | CAD for railway signaling | CAD für Zugsignalisierung | CASP | writer: Railcomplete AS | draft | November 25th 2024 by User:Gulruh Farmonova | |||
IS | RS | 3 | Capacity Planning | Kapazitätsplanung | CAPL | writer: Bane NOR (erstwhile: JBV) | draft | November 25th 2024 by User:Gulruh Farmonova | |||
IS | IL | 3 | Capture schematic visualisation information of track assets | Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen | draft | March 13th 2023 by User:RailML Coord Documentation | |||||
IS | TT, RS | 2 | Driver Advisory System (DAS) | Fahrerassistenzsystem | DASY | writer: IS | draft | March 13th 2023 by User:RailML Coord Documentation | |||
IS | IL, RS, TT | Exchange of Logical Train Positions | writer: Siemens Mobility Switzerland; reviewer: ??? |
draft | July 18th 2022 by User:RailML Coord Documentation | ||||||
IS | IL | 3 | Exchange of planning parameters for interlocking with suppliers | Austausch von Planungsparametern für Stellwerke mit Herstellern | ISIL | writer: IS | draft | November 25th 2024 by User:Gulruh Farmonova | |||
IL | IS | 6 | Hardware and cable plan | Aussenanlage und Kabelplan | draft | March 13th 2023 by User:RailML Coord Documentation | |||||
IL | 4 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | writer: Jernbaneverket Signalling Dpt | draft | November 25th 2024 by User:RailML Coord Documentation | |||||
IS | RS | 3 | Maintenance Planning | Wartungsplanung | MAPL | draft | March 13th 2023 by User:RailML Coord Documentation | ||||
IS | – | 3 | NRE Reporting | NRE Meldung | NRER | writer: ÖBB Infrastruktur | draft | November 25th 2024 by User:Gulruh Farmonova | |||
IL | IS | 4 | Operation and Control | Betriebsführung | draft | March 13th 2023 by User:RailML Coord Documentation | |||||
RS | IS, TT, IL | Operational simulation | Betriebssimulation | draft | March 13th 2023 by User:RailML Coord Documentation | ||||||
TT | IS, RS | Passenger information inside the train | Fahrgastinformation im Zug | writer: Interautomation (17. 01. 17); reviewer: PSI Transcom and iRFP |
draft | June 04th 2024 by User:RailML Coord Timetable | |||||
IS | RS, TT | 2 | Passenger Information System | Fahrgast-Informationssystem | PISY | draft | March 13th 2023 by User:RailML Coord Documentation | ||||
IS | Posession Management | Daten für Betra und Gleissperrungen | POMA | writer: Siemens Mobility Germany (10. 01. 22); reviewer: HaCon Ingenieurgesellschaft |
draft | January 20th 2025 by User:RailML Coord Documentation | |||||
IS | – | 3 | Positioning and Map-Matching | Positionierung und Kartenvergleich | POSI | draft | March 13th 2023 by User:RailML Coord Documentation | ||||
IS | – | 2 | Railway Infrastructure Recording | Erfassung der Schieneninfrastruktur | ISRC | writer: Bahnkonzept | draft | January 20th 2025 by User:RailML Coord Documentation | |||
IS | 3 | Railway Simulation Laboratory | Eisenbahnbetriebslabor | RLAB | writer: Czech Technical University Prague | draft | June 27th 2022 by User:RailML Coord Documentation | ||||
IL | IL | 5 | Site preparation data for Signal Controlled Warning Systems | Daten zur Standortvorbereitung für Rottenwarnsysteme | SCWS | writer: Thales Austria | draft | March 13th 2023 by User:RailML Coord Documentation | |||
TT | IS, RS | Slot ordering | Trassenbestellung | writer: SMA+Partner (17. 09. 16); reviewer: iRFP |
draft | September 23rd 2024 by User:RailML Orga Ontology | |||||
IS | 3 | Speed directory | Verzeichnis der zulässigen Geschwindigkeiten | SPED | writer: Bombardier Transportation | draft | November 25th 2024 by User:Gulruh Farmonova | ||||
TT | IS | TAF/TAP TSI requirements | TAF/TAP TSI Anforderungen | writer: ERA; reviewer: Bahnkonzept |
draft | January 20th 2025 by User:RailML Coord Documentation | |||||
IS | TT, IL, RS | 3 | Timetabling | Fahrplanerstellung | ISTT | writer: ProRail | draft | November 25th 2024 by User:Gulruh Farmonova | |||
RS | IS, TT | Traction power supply simulation | Simulation der Bahnstromversorgung | draft | March 13th 2023 by User:RailML Coord Documentation |