Template:UC:Use cases/table: Difference between revisions
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
(addition of involved schemas) |
(Data consolidation including default order.) |
||
Line 8: | Line 8: | ||
|3.2 | |3.2 | ||
|X | |X | ||
| [[UC:IL: | |[[UC:IL:InterlockingEngineering|Interlocking module engineering data <br/> ''(former: Interlocking engineering)'']] | ||
| {{Deu| | |{{Deu|Stellwerksprojektierung}} | ||
|{{Fra|< | |{{Fra|Invariants des système d’enclenchement}} | ||
| | |IMED | ||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-germany.html Thales Germany]</font color> | ||
| | |model | ||
|{{edited|UC: | |{{edited|UC:IL:InterlockingEngineering}} | ||
|- | |||
|{{anchor|NEST}}IS | |||
|– | |||
|3.1 | |||
|3.2 | |||
|X | |||
|[[UC:IS:NetworkStatement|Network statement of an infrastructure manager]] | |||
|{{Deu|Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers}} | |||
|{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}} | |||
|NEST | |||
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/szdc.html Správa železnic] (former: SŽDC) / [https://www.railml.org/en/introduction/partners/detail/prorail.html ProRail] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR]</font color> | |||
|model | |||
|{{edited|UC:IS:NetworkStatement}} | |||
|- | |||
|IS | |||
| | |||
|3.1 | |||
|3.2 | |||
|X | |||
|[[UC:IS:RINFReporting|RINF Reporting]] | |||
|{{Deu|RINF Meldung}} | |||
|{{Fra|Rapports RINF}} | |||
|RINR | |||
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/sncf-reseau.html SNCF Réseau]</font color> | |||
|merged into [[UC:IS:NetworkStatement|NEST]] | |||
|{{edited|UC:IS:RINFReporting}} | |||
|- | |- | ||
|IL | |IL | ||
Line 20: | Line 46: | ||
|3.1 | |3.1 | ||
|3.2 | |3.2 | ||
| X | |X | ||
| [[UC:IL: | |[[UC:IL:Simulation|Routes for timetable simulation <br/> ''(former: Capacity operational simulation)'']] | ||
|{{Deu|Fahrstrassen für Fahrplan simulieren <br/> ''(ehemals: Leistungsfähigkeit Simulation)''}} | |||
|{{Fra| <br/> ''(ancien: Simulation de la capacité)''}} | |||
| | |RSIM | ||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/jernbanedirektoratet.html Jernbanedirektoratet] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR] <br />(erstwhile: Jernbanedirektoratet Capacity Dpt)</font color> | ||
| | |model | ||
|{{edited|UC:IL: | |{{edited|UC:IL:Simulation}} | ||
|- | |- | ||
|IS | |IS | ||
Line 38: | Line 64: | ||
|{{Fra|Plan du tracé schématique}} | |{{Fra|Plan du tracé schématique}} | ||
|SCTP | |SCTP | ||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/jernbanedirektoratet.html Jernbanedirektoratet] / [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR]</font color> | ||
| | |model | ||
|{{edited|UC:IS:Schematic Track Plan}} | |{{edited|UC:IS:Schematic Track Plan}} | ||
|- | |- | ||
| | |IS | ||
| | |TT, IL | ||
|3. | |3.2 | ||
|3.2 | |3.2 | ||
|X | |X | ||
|[[UC:IS: | |[[UC:IS:IntegratedTMS|Integrated TMS]] | ||
|{{Deu| | |{{Deu|Integriertes Verkehrsmanagement}} | ||
| | | | ||
| | |ITMS | ||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/bombadier-transportation.html Bombardier Transportation]</font color> | ||
| | |model | ||
|{{edited|UC:IS: | |{{edited|UC:IS:IntegratedTMS}} | ||
|- | |- | ||
|TT | |||
|IL, IS, RS | |||
|3.2 | |||
|3.2 | |||
|X | |||
|[[UC:TT:TrafficManagementPlan|Traffic Management Plan]] | |||
| | |||
| | |||
| | |||
|<font color="red">writer: Thales</font color>; <br /> <font color="red">reviewer: ???</font color> | |||
|model | |||
|{{edited|UC:TT:TrafficManagementPlan}} | |||
|- | |- | ||
|rowspan="4"|IS | |rowspan="4"|IS | ||
Line 65: | Line 103: | ||
| | | | ||
|ETCS | |ETCS | ||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft]</font color> | ||
| | |model | ||
|{{edited|UC:IS:ETCS track net}} | |{{edited|UC:IS:ETCS track net}} | ||
|- class="expand-child" | |- class="expand-child" | ||
|[[UC:IS:ETCS track net|ETCS track net: Input for Detailed Design of ETCS Trackside]] | |[[UC:IS:ETCS track net|ETCS track net: Input for Detailed Design of ETCS Trackside]] | ||
| | | | ||
| | | | ||
|ETCS-a | |ETCS-a | ||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/psi-transcom.html PSI Transcom]</font color> | ||
| | |model | ||
|{{edited|UC:IS:ETCS track net}} | |{{edited|UC:IS:ETCS track net}} | ||
|- class="expand-child" | |- class="expand-child" | ||
|[[UC:IS:ETCS track net|ETCS track net: Output of Detailed Design of ETCS Trackside]] | |[[UC:IS:ETCS track net|ETCS track net: Output of Detailed Design of ETCS Trackside]] | ||
| | | | ||
| | | | ||
|ETCS-b | |ETCS-b | ||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies]</font color> | ||
| | |model | ||
|{{edited|UC:IS:ETCS track net}} | |{{edited|UC:IS:ETCS track net}} | ||
|- class="expand-child" | |- class="expand-child" | ||
|[[UC:IS:ETCS track net|ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement]] | |[[UC:IS:ETCS track net|ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement]] | ||
| | | | ||
| | | | ||
|ETCS-c | |ETCS-c | ||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP]</font color> | ||
| | |model | ||
|{{edited|UC:IS:ETCS track net}} | |{{edited|UC:IS:ETCS track net}} | ||
|- | |- | ||
|TT | |TT | ||
|RS | |IS, RS | ||
|3.2 | |||
|3.2 | |||
|X | |||
|[[UC:TT:PassengerInformationAtStations|Passenger information at stations]] | |||
|{{Deu|Fahrgastinformation am Bahnhof}} | |||
|{{Fra|Information voyageurs en station}} | |||
| | | | ||
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/psi-transcom.html PSI Transcom] (20. 05. 15)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/initplan-karlsruhe.html init]</font color> | |||
|model | |||
|{{edited|UC:TT:PassengerInformationAtStations}} | |||
|<font color="green">writer: | |||
| | |||
|{{edited|UC:TT: | |||
|- | |- | ||
|TT | |TT | ||
Line 113: | Line 164: | ||
| | | | ||
| | | | ||
|[[UC:TT: | |[[UC:TT:ATimetableForACompetition|A timetable for a competition (call for proposals)]] | ||
|{{Deu| | |{{Deu|Ausschreibungsfahrplan}} | ||
| | | | ||
| | | | ||
|<font color="green">writer: | |<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP] (21. 05. 15)</font color>; <br /> <font color="green">reviewer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies] (22. 09. 16)</font color> | ||
|consolidated | |consolidated | ||
|{{edited|UC:TT: | |{{edited|UC:TT:ATimetableForACompetition}} | ||
|- | |- | ||
|TT | |TT | ||
Line 145: | Line 181: | ||
| | | | ||
| | | | ||
|<font color="green">writer: IVU (21.05.15) </font color>; <font color=" | |<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies] (21. 05. 15)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft]</font color> | ||
|consolidated | |consolidated | ||
|{{edited|UC:TT:AdoptVehicleWorkingSchedulingToTimetableChanges}} | |{{edited|UC:TT:AdoptVehicleWorkingSchedulingToTimetableChanges}} | ||
|- | |||
|TT | |||
|RS, IS | |||
| | |||
| | |||
| | |||
|[[UC:TT:DutyShiftsPersonnelRoster|Duty planning and staff shifts]] | |||
|{{Deu|Dienstplanung und Personalschichten}} | |||
|{{Fra|Planification des permanences et affectation du personnel}} | |||
|SHFT | |||
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/oebb-personenverkehr.html ÖBB Personenverkehr]</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/initplan-karlsruhe.html init]</font color> | |||
|consolidated | |||
|{{edited|UC:TT:DutyShiftsPersonnelRoster}} | |||
|- | |- | ||
|TT | |TT | ||
Line 158: | Line 207: | ||
| | | | ||
| | | | ||
|<font color="green">writer: iRFP (21.05.15)</font color>; <font color="green">reviewer: IVU (22.09.16)</font color> | |<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP] (21. 05. 15)</font color>; <br /> <font color="green">reviewer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies] (22. 09. 16)</font color> | ||
|consolidated | |consolidated | ||
|{{edited|UC:TT:ExchangeOfFormationData}} | |{{edited|UC:TT:ExchangeOfFormationData}} | ||
|- | |- | ||
|TT | |TT | ||
Line 168: | Line 216: | ||
| | | | ||
| | | | ||
|[[UC:TT: | |[[UC:TT:LongTermStrategicTimetabling|Long Term Strategic Timetabling]] | ||
|{{Deu| | |{{Deu|Langfrist-Fahrplanerstellung}} | ||
| | | | ||
| | |LTST | ||
|<font color="green">writer: | |<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/sma-und-partner.html SMA+Partner] (22. 12. 16)</font color>; <br /> <font color="green">reviewer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft] (28. 6. 22)</font color> | ||
|consolidated | |consolidated | ||
|{{edited|UC:TT: | |{{edited|UC:TT:LongTermStrategicTimetabling}} | ||
|- | |- | ||
|TT | |TT | ||
Line 182: | Line 229: | ||
| | | | ||
| | | | ||
|[[UC:TT:TimetableInformation |Timetable Information]] | |[[UC:TT:TimetableInformation|Timetable Information]] | ||
|{{Deu|Fahrplanauskunft}} | |{{Deu|Fahrplanauskunft}} | ||
|{{Fra|Renseignement sur l'horaire}} | |{{Fra|Renseignement sur l'horaire}} | ||
|TINF | |TINF | ||
|<font color="green">writer: HaCon (13.03.15)</font color>; <font color=" | |<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft] (13. 03. 15)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/ivu-traffic-technologies.html IVU Traffic Technologies]</font color> | ||
|consolidated, | |consolidated, under revision | ||
|{{edited|UC:TT:TimetableInformation}} | |{{edited|UC:TT:TimetableInformation}} | ||
|- | |- | ||
|IS | |IS | ||
Line 213: | Line 246: | ||
| | | | ||
|TRGE | |TRGE | ||
|ÖBB Infrastruktur | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/oebb-infrastruktur.html ÖBB Infrastruktur]</font color> | ||
|review | |review | ||
|{{edited|UC:IS:Track Geometry}} | |{{edited|UC:IS:Track Geometry}} | ||
|- | |- | ||
|IS | |||
| | |||
| | |||
| | |||
|3 | |||
|[[UC:IS:Asset status representation|Asset status representation]] | |||
|{{Deu|Darstellung des Infrastrukturzustands}} | |||
|{{Fra|Représentation de l'actif}} | |||
|ASSR | |||
|<font color="black">writer: DLR for IN2Rail project</font color> | |||
|draft | |||
|{{edited|UC:IS:Asset status representation}} | |||
|- | |- | ||
|IS | |IS | ||
| | |IL | ||
| | | | ||
| | | | ||
| | |3 | ||
|[[UC:IS: | |[[UC:IS:CADForRailwaySignaling|CAD for railway signaling]] | ||
|{{Deu| | |{{Deu|CAD für Zugsignalisierung}} | ||
|{{Fra| | |{{Fra|CAD pour la signalisation ferroviaire}} | ||
| | |CASP | ||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/railcomplete.html Railcomplete AS]</font color> | ||
|draft | |draft | ||
|{{edited|UC:IS: | |{{edited|UC:IS:CADForRailwaySignaling}} | ||
|- | |- | ||
| | |IS | ||
| | |RS | ||
| | | | ||
| | | | ||
| | |3 | ||
|<font color=" | |[[UC:IS:CapacityPlanning|Capacity Planning]] | ||
|{{Deu|Kapazitätsplanung}} | |||
|{{Fra|Planification de la capacité}} | |||
|CAPL | |||
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/banenor.html Bane NOR] (erstwhile: JBV)</font color> | |||
|draft | |draft | ||
|{{edited|UC: | |{{edited|UC:IS:CapacityPlanning}} | ||
|- | |- | ||
|IS | |IS | ||
| | |IL | ||
| | | | ||
| | | | ||
| | |3 | ||
|[[UC:IS: | |[[UC:IS:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]] | ||
|{{Deu| | |{{Deu|Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen}} | ||
|{{Fra| | |{{Fra|Capture des informations de visualisation schématique des actifs de la piste}} | ||
| | | | ||
| | | | ||
|draft | |draft | ||
|{{edited|UC:IS: | |{{edited|UC:IS:CaptureSchematicVisualisationInformationOfTrackAssets}} | ||
|- | |- | ||
|IS | |IS | ||
Line 266: | Line 311: | ||
|{{Fra|Système d'assistance au conducteur (DAS)}} | |{{Fra|Système d'assistance au conducteur (DAS)}} | ||
|DASY | |DASY | ||
|IS | |<font color="black">writer: IS</font color> | ||
|draft | |draft | ||
|{{edited|UC:IS:DriverAdvisorySystem}} | |{{edited|UC:IS:DriverAdvisorySystem}} | ||
|- | |- | ||
|IS | |IS | ||
| | |IL, RS, TT | ||
| | | | ||
| | | | ||
| | | | ||
|[[UC:IS:ExchangeOfLogicalTrainPositions|Exchange of Logical Train Positions]] | |||
| | | | ||
| | | | ||
| | | | ||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/siemens-switzerland.html Siemens Mobility Switzerland]</font color>; <br /> <font color="red">reviewer: ???</font color> | ||
|draft | |draft | ||
|{{edited|UC:IS: | |{{edited|UC:IS:ExchangeOfLogicalTrainPositions}} | ||
|- | |- | ||
|IS | |IS | ||
Line 315: | Line 334: | ||
|3 | |3 | ||
|[[UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]] | |[[UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]] | ||
|{{Deu|Austausch von Planungsparametern für Stellwerke mit | |{{Deu|Austausch von Planungsparametern für Stellwerke mit Herstellern}} | ||
|{{Fra|Échange de paramètres de planification pour l'interconnexion avec les fournisseurs}} | |{{Fra|Échange de paramètres de planification pour l'interconnexion avec les fournisseurs}} | ||
|ISIL | |ISIL | ||
|IS | |<font color="black">writer: IS</font color> | ||
|draft | |draft | ||
|{{edited|UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers}} | |{{edited|UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers}} | ||
Line 326: | Line 345: | ||
| | | | ||
| | | | ||
| | |6 | ||
| [[UC:IL: | |[[UC:IL:HardwareAndCablePlan|Hardware and cable plan]] | ||
|{{Deu| | |{{Deu|Aussenanlage und Kabelplan}} | ||
|{{Fra| | |{{Fra|Plan matériel et câble}} | ||
| | | | ||
| | | | ||
| draft | |draft | ||
|{{edited|UC:IL: | |{{edited|UC:IL:HardwareAndCablePlan}} | ||
|- | |||
|IL | |||
| | |||
| | |||
| | |||
|4 | |||
|[[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] | |||
|{{Deu|Stellwerkstechnik für Signalisierung}} | |||
|{{Fra|Systèmes de verrouillage de la signalisation}} | |||
| | |||
|<font color="black">writer: Jernbaneverket Signalling Dpt</font color> | |||
|draft | |||
|{{edited|UC:IL:InterlockEngineeringForSignallingWithinJBV}} | |||
|- | |- | ||
|IS | |IS | ||
Line 348: | Line 380: | ||
|{{edited|UC:IS:MaintenancePlanning}} | |{{edited|UC:IS:MaintenancePlanning}} | ||
|- | |- | ||
| | |IS | ||
|– | |||
| | | | ||
| | | | ||
| | |3 | ||
|[[UC:IS:NREReporting|NRE Reporting]] | |||
| [[UC: | |{{Deu|NRE Meldung}} | ||
|{{Fra|Rapports NRE}} | |||
|NRER | |||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/oebb-infrastruktur.html ÖBB Infrastruktur]</font color> | ||
| | |draft | ||
| draft | |{{edited|UC:IS:NREReporting}} | ||
|{{edited|UC: | |||
|- | |- | ||
|IL | |IL | ||
Line 365: | Line 397: | ||
| | | | ||
| | | | ||
| | |4 | ||
| [[UC:IL: | |[[UC:IL:OperationAndControl|Operation and Control]] | ||
|{{Deu| | |{{Deu|Betriebsführung}} | ||
|{{Fra| | |{{Fra|Commande et Control}} | ||
| | | | ||
| | | | ||
| draft | |draft | ||
|{{edited|UC:IL: | |{{edited|UC:IL:OperationAndControl}} | ||
|- | |- | ||
|IL | |RS | ||
| | |IS, TT, IL | ||
| | |||
| | | | ||
| | | | ||
|[[UC:RS:OperationalSimulation|Operational simulation]] | |||
| [[UC: | |{{Deu|Betriebssimulation}} | ||
|{{Deu| | | | ||
| | |||
| | | | ||
| | | | ||
|draft | |draft | ||
|{{edited|UC: | |{{edited|UC:RS:OperationalSimulation}} | ||
|- | |- | ||
|IS | |TT | ||
| | |IS, RS | ||
| | |||
| | |||
| | |||
|[[UC:TT:FGIInTrain|Passenger information inside the train]] | |||
|{{Deu|Fahrgastinformation im Zug}} | |||
| | | | ||
| | | | ||
| | |<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/interautomation.html Interautomation] (17. 01. 17)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/psi-transcom.html PSI Transcom] and [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP]</font color> | ||
|draft | |draft | ||
|{{edited|UC: | |{{edited|UC:TT:FGIInTrain}} | ||
|- | |- | ||
|IS | |IS | ||
|RS, TT | |||
| | | | ||
| | | | ||
|2 | |||
|[[UC:IS:PassengerInformationSystem|Passenger Information System]] | |||
|{{Deu|Fahrgast-Informationssystem}} | |||
|{{Fra|Système d'information voyageurs}} | |||
|PISY | |||
| | | | ||
|draft | |draft | ||
|{{edited|UC:IS: | |{{edited|UC:IS:PassengerInformationSystem}} | ||
|- | |- | ||
|IS | |IS | ||
| | | | ||
| | | | ||
| | | | ||
|[[UC:IS: | | | ||
|{{Deu| | |[[UC:IS:PosessionManagement|Posession Management]] | ||
| | |{{Deu|Daten für Betra und Gleissperrungen}} | ||
| | | | ||
| | |POMA | ||
|<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/siemens-mo-mm-germany.html Siemens Mobility Germany] (10. 01. 22)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/hacon-ingenieurgesellschaft.html HaCon Ingenieurgesellschaft]</font color> | |||
|draft | |draft | ||
|{{edited|UC:IS: | |{{edited|UC:IS:PosessionManagement}} | ||
|- | |- | ||
|IS | |IS | ||
| | |– | ||
| | | | ||
| | | | ||
|3 | |3 | ||
|[[UC:IS: | |[[UC:IS:PositioningAndMap-Matching|Positioning and Map-Matching]] | ||
|{{Deu| | |{{Deu|Positionierung und Kartenvergleich}} | ||
|{{Fra| | |{{Fra|Positionnement et correspondance avec la carte}} | ||
| | |POSI | ||
| | | | ||
|draft | |draft | ||
|{{edited|UC:IS: | |{{edited|UC:IS:PositioningAndMap-Matching}} | ||
|- | |- | ||
|IS | |IS | ||
| | |– | ||
| | | | ||
| | | | ||
|2 | |||
|[[UC:IS:RailwayInfrastructureRecording|Railway Infrastructure Recording]] | |||
|{{Deu|Erfassung der Schieneninfrastruktur}} | |||
|{{Fra|Enregistrement des infrastructures ferroviaires}} | |||
|ISRC | |||
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/bahnkonzept.html Bahnkonzept]</font color> | |||
|draft | |draft | ||
|{{edited|UC:IS: | |{{edited|UC:IS:RailwayInfrastructureRecording}} | ||
|- | |- | ||
|IS | |IS | ||
Line 474: | Line 493: | ||
|{{Fra|Laboratoire de simulation ferroviaire}} | |{{Fra|Laboratoire de simulation ferroviaire}} | ||
|RLAB | |RLAB | ||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/czech-technical-university-prague.html Czech Technical University Prague]</font color> | ||
|draft | |draft | ||
|{{edited|UC:IS:Railway Simulation Laboratory}} | |{{edited|UC:IS:Railway Simulation Laboratory}} | ||
|- | |- | ||
| | |IL | ||
| | |IL | ||
| | | | ||
| | | | ||
| | |5 | ||
|[[UC: | |[[UC:IL:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]] | ||
|{{Deu| | |{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} | ||
| | |{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}} | ||
| | |SCWS | ||
|<font color=" | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/thales-austria.html Thales Austria]</font color> | ||
|draft | |draft | ||
|{{edited|UC: | |{{edited|UC:IL:SitePreparationDataForSignalControlledWarningSystems}} | ||
|- | |- | ||
|TT | |TT | ||
Line 498: | Line 515: | ||
| | | | ||
| | | | ||
|[[UC:TT:SlotOrdering |Slot ordering]] | |[[UC:TT:SlotOrdering|Slot ordering]] | ||
|{{Deu|Trassenbestellung}} | |{{Deu|Trassenbestellung}} | ||
| | | | ||
| | | | ||
|<font color="green">writer: SMA (17.09.16)</font color>; <font color=" | |<font color="green">writer: [https://www.railml.org/en/introduction/partners/detail/sma-und-partner.html SMA+Partner] (17. 09. 16)</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/irfp-dresden.html iRFP]</font color> | ||
|draft | |draft | ||
|{{edited|UC:TT:SlotOrdering}} | |{{edited|UC:TT:SlotOrdering}} | ||
|- | |- | ||
|IS | |||
|IS | |||
| | | | ||
| | | | ||
| | | | ||
|[[UC: | |3 | ||
|{{Deu| | |[[UC:IS:Speeddirectory|Speed directory]] | ||
| | |{{Deu|Verzeichnis der zulässigen Geschwindigkeiten}} | ||
| | |{{Fra|Liste des vitesses autorisées}} | ||
|<font color=" | |SPED | ||
|<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/bombadier-transportation.html Bombardier Transportation]</font color> | |||
|draft | |draft | ||
|{{edited|UC: | |{{edited|UC:IS:Speeddirectory}} | ||
|- | |- | ||
|TT | |||
|IS | |IS | ||
| | | | ||
| | | | ||
| | | | ||
|[[UC: | |[[UC:TT:TAF/TAP TSI|TAF/TAP TSI requirements]] | ||
|{{Deu|TAF/TAP TSI Anforderungen}} | |||
| | | | ||
| | | | ||
|<font color="black">writer: ERA</font color>; <br /> <font color="black">reviewer: [https://www.railml.org/en/introduction/partners/detail/bahnkonzept.html Bahnkonzept]</font color> | |||
|<font color=" | |||
|draft | |draft | ||
|{{edited|UC: | |{{edited|UC:TT:TAF/TAP TSI}} | ||
|- | |- | ||
|IS | |IS | ||
|TT, IL, RS | |||
| | | | ||
| | | | ||
| | |3 | ||
|[[UC:IS:Timetabling|Timetabling]] | |||
|[[UC:IS: | |{{Deu|Fahrplanerstellung}} | ||
| | |{{Fra|horaires}} | ||
| | |ISTT | ||
| | |<font color="black">writer: [https://www.railml.org/en/introduction/partners/detail/prorail.html ProRail]</font color> | ||
|<font color=" | |||
|draft | |draft | ||
|{{edited|UC:IS: | |{{edited|UC:IS:Timetabling}} | ||
|- | |- | ||
|RS | |RS | ||
Line 556: | Line 572: | ||
| | | | ||
| | | | ||
| | |draft | ||
|{{edited|UC:RS:TractionPowerSupplySimulation}} | |{{edited|UC:RS:TractionPowerSupplySimulation}} | ||
|}{{interwiki}} | |}{{interwiki}} |
Revision as of 18:26, 23 February 2023
Directing Subschema |
Involved Subschemas |
Implemented in railML® version (lowest) |
Implemented in railML® version (highest) |
Priority |
Description (EN) | Description (DE) | Description (FR) | Abbreviation |
Reported by | Status how to interpret the status |
Edited |
---|---|---|---|---|---|---|---|---|---|---|---|
IL | IS | 3.1 | 3.2 | X | Interlocking module engineering data (former: Interlocking engineering) |
Stellwerksprojektierung | IMED | writer: Thales Germany | model | January 20th 2025 by User:RailML Coord Documentation | |
IS | – | 3.1 | 3.2 | X | Network statement of an infrastructure manager | Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers | NEST | writer: Správa železnic (former: SŽDC) / ProRail / Bane NOR | model | January 24th 2025 by User:RailML Orga Ontology | |
IS | 3.1 | 3.2 | X | RINF Reporting | RINF Meldung | RINR | writer: SNCF Réseau | merged into NEST | January 20th 2025 by User:RailML Coord Documentation | ||
IL | IS | 3.1 | 3.2 | X | Routes for timetable simulation (former: Capacity operational simulation) |
Fahrstrassen für Fahrplan simulieren (ehemals: Leistungsfähigkeit Simulation) |
RSIM | writer: Jernbanedirektoratet / Bane NOR (erstwhile: Jernbanedirektoratet Capacity Dpt) |
model | January 20th 2025 by User:RailML Coord Documentation | |
IS | IL | 3.1 | 3.2 | X | Schematic Track Plan | Schematische Gleisplandarstellung | SCTP | writer: Jernbanedirektoratet / Bane NOR | model | February 21st 2025 by User:RailML Orga Ontology | |
IS | TT, IL | 3.2 | 3.2 | X | Integrated TMS | Integriertes Verkehrsmanagement | ITMS | writer: Bombardier Transportation | model | FIXME Page does not exist yet. | |
TT | IL, IS, RS | 3.2 | 3.2 | X | Traffic Management Plan | writer: Thales; reviewer: ??? |
model | FIXME Page does not exist yet. | |||
IS | IL | 3.2 | 3.2 | X | ETCS track net | ETCS | writer: HaCon Ingenieurgesellschaft | model | January 20th 2025 by User:RailML Coord Documentation | ||
ETCS track net: Input for Detailed Design of ETCS Trackside | ETCS-a | writer: PSI Transcom | model | January 20th 2025 by User:RailML Coord Documentation | |||||||
ETCS track net: Output of Detailed Design of ETCS Trackside | ETCS-b | writer: IVU Traffic Technologies | model | January 20th 2025 by User:RailML Coord Documentation | |||||||
ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement | ETCS-c | writer: iRFP | model | January 20th 2025 by User:RailML Coord Documentation | |||||||
TT | IS, RS | 3.2 | 3.2 | X | Passenger information at stations | Fahrgastinformation am Bahnhof | writer: PSI Transcom (20. 05. 15); reviewer: init |
model | February 19th 2025 by User:RailML Coord Timetable | ||
TT | IS, RS | A timetable for a competition (call for proposals) | Ausschreibungsfahrplan | writer: iRFP (21. 05. 15); reviewer: IVU Traffic Technologies (22. 09. 16) |
consolidated | March 13th 2023 by User:RailML Coord Documentation | |||||
TT | CO, IS, RS | Adopt vehicle working scheduling to timetable changes | Umlauf an Jahresfahrplan anpassen | writer: IVU Traffic Technologies (21. 05. 15); reviewer: HaCon Ingenieurgesellschaft |
consolidated | June 27th 2022 by User:RailML Coord Documentation | |||||
TT | RS, IS | Duty planning and staff shifts | Dienstplanung und Personalschichten | SHFT | writer: ÖBB Personenverkehr; reviewer: init |
consolidated | January 24th 2025 by User:RailML Coord Documentation | ||||
TT | IS, RS | Exchange of formation data | Austausch von Wagenreihungen/ Behängungsdaten | writer: iRFP (21. 05. 15); reviewer: IVU Traffic Technologies (22. 09. 16) |
consolidated | March 13th 2023 by User:RailML Coord Documentation | |||||
TT | IS, RS | Long Term Strategic Timetabling | Langfrist-Fahrplanerstellung | LTST | writer: SMA+Partner (22. 12. 16); reviewer: HaCon Ingenieurgesellschaft (28. 6. 22) |
consolidated | July 18th 2022 by User:RailML Coord Timetable | ||||
TT | IS, RS | Timetable Information | Fahrplanauskunft | TINF | writer: HaCon Ingenieurgesellschaft (13. 03. 15); reviewer: IVU Traffic Technologies |
consolidated, under revision | March 13th 2023 by User:RailML Coord Documentation | ||||
IS | – | 2 | Track Geometry | Gleisgeometrie | TRGE | writer: ÖBB Infrastruktur | review | April 15th 2024 by User:RailML Coord Documentation | |||
IS | 3 | Asset status representation | Darstellung des Infrastrukturzustands | ASSR | writer: DLR for IN2Rail project | draft | November 25th 2024 by User:Gulruh Farmonova | ||||
IS | IL | 3 | CAD for railway signaling | CAD für Zugsignalisierung | CASP | writer: Railcomplete AS | draft | November 25th 2024 by User:Gulruh Farmonova | |||
IS | RS | 3 | Capacity Planning | Kapazitätsplanung | CAPL | writer: Bane NOR (erstwhile: JBV) | draft | November 25th 2024 by User:Gulruh Farmonova | |||
IS | IL | 3 | Capture schematic visualisation information of track assets | Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen | draft | March 13th 2023 by User:RailML Coord Documentation | |||||
IS | TT, RS | 2 | Driver Advisory System (DAS) | Fahrerassistenzsystem | DASY | writer: IS | draft | March 13th 2023 by User:RailML Coord Documentation | |||
IS | IL, RS, TT | Exchange of Logical Train Positions | writer: Siemens Mobility Switzerland; reviewer: ??? |
draft | July 18th 2022 by User:RailML Coord Documentation | ||||||
IS | IL | 3 | Exchange of planning parameters for interlocking with suppliers | Austausch von Planungsparametern für Stellwerke mit Herstellern | ISIL | writer: IS | draft | November 25th 2024 by User:Gulruh Farmonova | |||
IL | IS | 6 | Hardware and cable plan | Aussenanlage und Kabelplan | draft | March 13th 2023 by User:RailML Coord Documentation | |||||
IL | 4 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | writer: Jernbaneverket Signalling Dpt | draft | November 25th 2024 by User:RailML Coord Documentation | |||||
IS | RS | 3 | Maintenance Planning | Wartungsplanung | MAPL | draft | March 13th 2023 by User:RailML Coord Documentation | ||||
IS | – | 3 | NRE Reporting | NRE Meldung | NRER | writer: ÖBB Infrastruktur | draft | November 25th 2024 by User:Gulruh Farmonova | |||
IL | IS | 4 | Operation and Control | Betriebsführung | draft | March 13th 2023 by User:RailML Coord Documentation | |||||
RS | IS, TT, IL | Operational simulation | Betriebssimulation | draft | March 13th 2023 by User:RailML Coord Documentation | ||||||
TT | IS, RS | Passenger information inside the train | Fahrgastinformation im Zug | writer: Interautomation (17. 01. 17); reviewer: PSI Transcom and iRFP |
draft | June 04th 2024 by User:RailML Coord Timetable | |||||
IS | RS, TT | 2 | Passenger Information System | Fahrgast-Informationssystem | PISY | draft | March 13th 2023 by User:RailML Coord Documentation | ||||
IS | Posession Management | Daten für Betra und Gleissperrungen | POMA | writer: Siemens Mobility Germany (10. 01. 22); reviewer: HaCon Ingenieurgesellschaft |
draft | January 20th 2025 by User:RailML Coord Documentation | |||||
IS | – | 3 | Positioning and Map-Matching | Positionierung und Kartenvergleich | POSI | draft | March 13th 2023 by User:RailML Coord Documentation | ||||
IS | – | 2 | Railway Infrastructure Recording | Erfassung der Schieneninfrastruktur | ISRC | writer: Bahnkonzept | draft | January 20th 2025 by User:RailML Coord Documentation | |||
IS | 3 | Railway Simulation Laboratory | Eisenbahnbetriebslabor | RLAB | writer: Czech Technical University Prague | draft | June 27th 2022 by User:RailML Coord Documentation | ||||
IL | IL | 5 | Site preparation data for Signal Controlled Warning Systems | Daten zur Standortvorbereitung für Rottenwarnsysteme | SCWS | writer: Thales Austria | draft | March 13th 2023 by User:RailML Coord Documentation | |||
TT | IS, RS | Slot ordering | Trassenbestellung | writer: SMA+Partner (17. 09. 16); reviewer: iRFP |
draft | September 23rd 2024 by User:RailML Orga Ontology | |||||
IS | 3 | Speed directory | Verzeichnis der zulässigen Geschwindigkeiten | SPED | writer: Bombardier Transportation | draft | November 25th 2024 by User:Gulruh Farmonova | ||||
TT | IS | TAF/TAP TSI requirements | TAF/TAP TSI Anforderungen | writer: ERA; reviewer: Bahnkonzept |
draft | January 20th 2025 by User:RailML Coord Documentation | |||||
IS | TT, IL, RS | 3 | Timetabling | Fahrplanerstellung | ISTT | writer: ProRail | draft | November 25th 2024 by User:Gulruh Farmonova | |||
RS | IS, TT | Traction power supply simulation | Simulation der Bahnstromversorgung | draft | March 13th 2023 by User:RailML Coord Documentation |