Template:UC:Use cases/table: Difference between revisions
Jump to navigation
Jump to search
[unchecked revision] | [unchecked revision] |
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
|- | |- | ||
! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! style="width:15%"|Description (FR) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[UC:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span> | ! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(lowest)</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(highest)</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! style="width:15%"|Description (FR) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[UC:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span> | ||
|- | |- | ||
|IL | |IL | ||
|IS | |IS | ||
|3.1 | |3.1 | ||
|3.2 | |||
|X | |X | ||
| [[UC:IL:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated | | [[UC:IL:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated | ||
Line 12: | Line 13: | ||
| | | | ||
|3.1 | |3.1 | ||
|3.2 | |||
| X || [[UC:IL:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[UC:IL:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[UC:IL:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated | | X || [[UC:IL:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[UC:IL:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[UC:IL:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated | ||
|- | |- | ||
Line 17: | Line 19: | ||
| | | | ||
|3.1 | |3.1 | ||
|3.2 | |||
|X | |X | ||
|[[UC:IS:Schematic Track Plan|Schematic Track Plan]] | |[[UC:IS:Schematic Track Plan|Schematic Track Plan]] | ||
Line 28: | Line 31: | ||
| | | | ||
|3.1 | |3.1 | ||
|3.2 | |||
|X | |X | ||
|[[UC:IS:RINFReporting|RINF Reporting]] | |[[UC:IS:RINFReporting|RINF Reporting]] | ||
Line 39: | Line 43: | ||
| | | | ||
|3.1 | |3.1 | ||
|3.2 | |||
|X | |X | ||
|[[UC:IS:NetworkStatement|Network statement of an infrastructure manager]] | |[[UC:IS:NetworkStatement|Network statement of an infrastructure manager]] | ||
Line 50: | Line 55: | ||
| | | | ||
|3.2 | |3.2 | ||
| | |||
|1 | |1 | ||
|[[UC:TT:PassengerInformationAtStations|Passenger information at stations]] | |[[UC:TT:PassengerInformationAtStations|Passenger information at stations]] | ||
Line 61: | Line 67: | ||
|TT, IL | |TT, IL | ||
|3.2 | |3.2 | ||
| | |||
|1 | |1 | ||
|[[UC:IS:IntegratedTMS|Integrated TMS]] | |[[UC:IS:IntegratedTMS|Integrated TMS]] | ||
Line 72: | Line 79: | ||
|IL, IS, RS | |IL, IS, RS | ||
|3.2 | |3.2 | ||
| | |||
|1 | |1 | ||
|[[UC:TT:TrafficManagementPlan|Traffic Management Plan]] | |[[UC:TT:TrafficManagementPlan|Traffic Management Plan]] | ||
Line 81: | Line 89: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 92: | Line 101: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 104: | Line 114: | ||
|IS | |IS | ||
|TT | |TT | ||
| | |||
| | | | ||
|2 | |2 | ||
Line 114: | Line 125: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 125: | Line 137: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 136: | Line 149: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 147: | Line 161: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 158: | Line 173: | ||
|- | |- | ||
|IL | |IL | ||
| | |||
| | | | ||
| | | | ||
Line 163: | Line 179: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 174: | Line 191: | ||
|- | |- | ||
|IL | |IL | ||
| | |||
| | | | ||
| | | | ||
Line 179: | Line 197: | ||
|- | |- | ||
|IL | |IL | ||
| | |||
| | | | ||
| | | | ||
Line 184: | Line 203: | ||
|- | |- | ||
|IL | |IL | ||
| | |||
| | | | ||
| | | | ||
Line 189: | Line 209: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 200: | Line 221: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 211: | Line 233: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 222: | Line 245: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 233: | Line 257: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 244: | Line 269: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 255: | Line 281: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 266: | Line 293: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | | ||
Line 278: | Line 306: | ||
|IS | |IS | ||
|IL | |IL | ||
| | |||
| | | | ||
|3 | |3 | ||
Line 288: | Line 317: | ||
|- | |- | ||
|RS | |RS | ||
| | |||
| | | | ||
| | | | ||
Line 299: | Line 329: | ||
|- | |- | ||
|RS | |RS | ||
| | |||
| | | | ||
| | | | ||
Line 311: | Line 342: | ||
|TT | |TT | ||
|RS, IS | |RS, IS | ||
| | |||
| | | | ||
| | | | ||
Line 321: | Line 353: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 332: | Line 365: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 343: | Line 377: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 354: | Line 389: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 365: | Line 401: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 376: | Line 413: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 387: | Line 425: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 398: | Line 437: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 409: | Line 449: | ||
|- | |- | ||
|TT | |TT | ||
| | |||
| | | | ||
| | | | ||
Line 421: | Line 462: | ||
|IS | |IS | ||
|IL, RS, TT | |IL, RS, TT | ||
| | |||
| | | | ||
| | | | ||
Line 431: | Line 473: | ||
|- | |- | ||
|IS | |IS | ||
| | |||
| | | | ||
| | | |
Revision as of 13:00, 27 June 2022
Directing Subschema |
Involved Subschemas |
Implemented in railML® version (lowest) |
Implemented in railML® version (highest) |
Priority |
Description (EN) | Description (DE) | Description (FR) | Abbreviation |
Reported by | Status how to interpret the status |
---|---|---|---|---|---|---|---|---|---|---|
IL | IS | 3.1 | 3.2 | X | Routes for timetable simulation (former: Capacity operational simulation) |
Fahrstrassen für Fahrplan simulieren (ehemals: Leistungsfähigkeit Simulation) |
RSIM | Jernbanedirektoratet/BaneNOR (erstwhile: Jernbanedirektoratet Capacity Dpt) |
consolidated | |
IL | 3.1 | 3.2 | X | Interlocking module engineering data (former: Interlocking engineering) |
Stellwerksprojektierung | [[UC:IL:InterlockingEngineering|]] | IMED | Thales Germany | consolidated | |
IS | 3.1 | 3.2 | X | Schematic Track Plan | Schematische Gleisplandarstellung | SCTP | JBD/BaneNOR | consolidated | ||
IS | 3.1 | 3.2 | X | RINF Reporting | RINF Meldung | RINR | SNCF Réseau | merged into NEST | ||
IS | 3.1 | 3.2 | X | Network statement of an infrastructure manager | Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers | NEST | SŽDC/ProRail/BaneNOR | consolidated | ||
TT | 3.2 | 1 | Passenger information at stations | Fahrgastinformation am Bahnhof | writer: PSI (20.05.15); reviewer: Init | consolidated | ||||
IS | TT, IL | 3.2 | 1 | Integrated TMS | Integriertes Verkehrsmanagement | ITMS | Bombardier | draft | ||
TT | IL, IS, RS | 3.2 | 1 | Traffic Management Plan | writer: Thales; reviewer: ??? | draft | ||||
IS | 2 | Passenger Information System | Fahrgast-Informationssystem | PISY | draft | |||||
IS | 2 | Track Geometry | Gleisgeometrie | TRGE | ÖBB Infrastruktur | review | ||||
IS | TT | 2 | Driver Advisory System (DAS) | Fahrerassistenzsystem | DASY | IS | draft | |||
IS | 2 | Railway Infrastructure Recording | Erfassung der Schieneninfrastruktur | ISRC | Bahnkonzept | draft | ||||
IS | 3 | Positioning and Map-Matching | Positionierung und Kartenvergleich | POSI | draft | |||||
IS | 3 | Asset status representation | Darstellung des Infrastrukturzustands | ASSR | DLR for IN2Rail project | draft | ||||
IS | 3 | Exchange of planning parameters for interlocking with suppliers | Austausch von Planungsparametern für Stellwerke mit Herstellern | ISIL | IS | draft | ||||
IL | 4 | Operation and Control | Betriebsführung | draft | ||||||
IS | 3 | Maintenance Planning | Wartungsplanung | MAPL | draft | |||||
IL | 4 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | [[UC:IL:InterlockEngineeringForSignallingWithinJBV|]] | Jernbaneverket Signalling Dpt | draft | ||||
IL | 5 | Site preparation data for Signal Controlled Warning Systems | Daten zur Standortvorbereitung für Rottenwarnsysteme | SCWS | Thales Austria | draft | ||||
IL | 6 | Hardware and cable plan | Aussenanlage und Kabelplan | draft | ||||||
IS | 3 | Capacity Planning | Kapazitätsplanung | CAPL | JBV/BaneNOR | draft | ||||
IS | 3 | NRE Reporting | NRE Meldung | NRER | ÖBB Infrastruktur | draft | ||||
IS | 3 | Speed directory | Verzeichnis der zulässigen Geschwindigkeiten | SPED | ÖBB Infrastruktur | draft | ||||
IS | 3 | Timetabling | Fahrplanerstellung | ISTT | ProRail | draft | ||||
IS | 3 | CAD for railway signaling | CAD für Zugsignalisierung | CASP | RailComplete | draft | ||||
IS | 3 | Capture schematic visualisation information of track assets | Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen | draft | ||||||
IS | 3 | Railway Simulation Laboratory | Eisenbahnbetriebslabor | RLAB | ČVUT | draft | ||||
IS | 9 | Railway Infrastructure Visualisation | Visualisierung von Schieneninfrastruktur | ISVI | outdated | |||||
IS | IL | 3 | ETCS track net | ETCS | Thales | draft | ||||
RS | Traction power supply simulation | Simulation der Bahnstromversorgung | ||||||||
RS | Operational simulation | Betriebssimulation | ||||||||
TT | RS, IS | Duty planning and staff shifts | Dienstplanung und Personalschichten | SHFT | writer: ÖBB Personenverkehr; reviewer: INIT |
consolidated | ||||
TT | Timetable Information | Fahrplanauskunft | TINF | writer: HaCon (13.03.15); reviewer: IVU | consolidated, under revision | |||||
TT | A timetable for a competition (call for proposals) | Ausschreibungsfahrplan | writer: iRFP (21.05.15); reviewer: IVU (22.09.16) | consolidated | ||||||
TT | Import complete timetable for vehicle working scheduling and vehicle workings | Umlaufbildung Fahrzeuge Jahresfahrplan | writer: IVU (20.05.15); reviewer: iRFP | draft | ||||||
TT | Adopt vehicle working scheduling to timetable changes | Umlauf an Jahresfahrplan anpassen | writer: IVU (21.05.15) ; reviewer: HaCon | consolidated | ||||||
TT | Exchange of formation data | Austausch von Wagenreihungen/ Behängungsdaten | writer: iRFP (21.05.15); reviewer: IVU (22.09.16) | consolidated | ||||||
TT | TAF/TAP TSI requirements | TAF/TAP TSI Anforderungen | writer: ERA; reviewer: Bahnkonzept | draft | ||||||
TT | Long Term Strategic Timetabling | Langfrist-Fahrplanerstellung | writer: SMA (22.12.16); reviewer: HaCon | draft | ||||||
TT | Slot ordering | Trassenbestellung | writer: SMA (17.09.16); reviewer: iRFP | draft | ||||||
TT | Passenger information inside the train | Fahrgastinformation im Zug | writer: Interautomation (17.01.17); reviewer: PSI and iRFP | draft | ||||||
IS | IL, RS, TT | Exchange of Logical Train Positions | writer: Siemens Switzerland; reviewer: ??? | draft | ||||||
IS | Posession Management | Daten für Betra und Gleissperrungen | POMA | writer: Siemens Germany (10.01.22); reviewer: HaCon | draft |