Search results

Jump to navigation Jump to search
  • Exchange of formation data; Austausch von Wagenreihungen/Behängungsdaten The usecase describes the exchange of data between a software tool for short term
    6 KB (688 words) - 13:26, 13 March 2023
  • being framed. Do not edit manually! Certification: Compliance with the description in the Wiki is relevant for fulfilling the requirements (see below). Semantics:
    5 KB (653 words) - 16:05, 3 April 2023
  • vehicle. The activities mentioned can be carried out one after the other. Description of parallel work is not included in this use case. For the purposes of
    6 KB (926 words) - 17:00, 4 December 2023
  • apply to train coupling, sharing and "strengthening". See corresponding descriptions for further information.) Usage of tTimeScope="earliest" / ="latest"
    16 KB (1,903 words) - 13:27, 13 March 2023
  • RailTopoModel® compliant railway network description enriched with the design layout and infrastructure description including also the essential information
    5 KB (737 words) - 16:12, 15 April 2024
  • Maintenance Planning; Wartungsplanung The application focuses the transfer of infrastructure data from an asset management source system (e.g. DfA in Switzerland)
    1 KB (133 words) - 13:47, 13 March 2023
  • numberInStack="1" orientation="horizontal" usedForDirection="both"> <rail3:designator description="" entry="" register=""/> <rail3:hasCommand entityCode="" ref=""/> <rail3:hasIndication
    3 KB (348 words) - 13:08, 28 May 2022
  • Network Statement; Network Statement The Network Statement covers the requirements for access and use of the rail network (route network) of the infrastructure
    2 KB (169 words) - 11:34, 12 April 2024
  • Hardware and cable plan; Hardware und Kabelplan Cable plan Parts Lists Number of field element controller Hardware indoor, outdoor (number of point machines
    1 KB (119 words) - 13:51, 13 March 2023
  • Passenger Information System; Passagierinformationssystem The application focuses the transfer of timetable, traction and topology information from the
    1 KB (157 words) - 13:46, 13 March 2023
  • Traffic Management Plan The purpose of a TMS is to optimize rail traffic flow by providing decision support to dispatchers as well as automated functions
    2 KB (178 words) - 18:16, 13 May 2024
  • not be used as leading information, but rather as derived additional description. (obligatory; xs:integer; minInclusive: 0; maxInclusive: 15) *Notice:
    519 bytes (38 words) - 21:49, 25 April 2022
  • downleft-rightup: Description of a logical position of a simple crossing within a route path from the lower left to upper right upleft-rightdown: Description of a logical
    15 KB (1,510 words) - 19:13, 14 February 2022
  • short name for the train clearance gauges in latin letters Children <description>: Internationalized name of the clearance gauge. <validFor>: Gives indication
    6 KB (797 words) - 12:50, 29 November 2023
  • Operation and Control; Betrieb und Kontrolle The operation and control systems for one railway operating company are normally provided by one selected
    2 KB (209 words) - 13:52, 13 March 2023
  • element Generic:vehicleBrakes of railML® version 3.2   Documentation Description of the type of vehicle brakes and their application as brake effort or
    521 bytes (58 words) - 12:43, 8 February 2024
  • for element Generic:trainBrakes of railML® version 3.2   Documentation Description of the type of brakes within the formation and their application as brake
    519 bytes (58 words) - 12:43, 8 February 2024
  • Main items Detailed description Topology Inclusion of use case "Schematic Track Plan" (SCTP) Track IS:Track
    11 KB (828 words) - 13:25, 13 March 2023
  • Passenger Information Inside the Train; Fahrgastinformation im Zug The use case describes the data of the timetable, which will be imported in a real time
    9 KB (677 words) - 18:10, 27 June 2022
  • number of the information. (optional; xs:nonNegativeInteger), description: The verbal description of the information. (optional; xs:string), normalState: The
    977 bytes (5 words) - 12:41, 8 February 2024
  • number of the information. (optional; xs:nonNegativeInteger), description: The verbal description of the information. (optional; xs:string), normalState: The
    973 bytes (5 words) - 12:41, 8 February 2024
  • [Wikipedia] Subschema infrastructure Parents* polygon Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (0..1)
    1 KB (5 words) - 15:47, 17 May 2024
  • Driver Advisory System (DAS); Fahrerassistentsystem The Driver Advisory System (DAS) is an on-train driver support system which advises a driver on the
    3 KB (306 words) - 13:48, 13 March 2023
  • Positioning and Map-Matching; Positionierung und Kartenabgleich With a train-borne positioning system, which is a multi-sensor on-board positioning device
    3 KB (367 words) - 13:49, 13 March 2023
  • Subschema generic Parents* hasCommunicationSettings Children None Attributes: description: should be interpreted in its elements' context, substantiates the name
    519 bytes (58 words) - 12:42, 8 February 2024
  • Topology (schematic drawing) on micro, meso and macroscopic level, with description of data (values and position) Timetable graph, Platform occupation diagram
    5 KB (687 words) - 13:46, 13 March 2023
  • select such a group and configure the toplogy would be useful. There is no description of this as of today. If RailML is introduced, the system will need to
    5 KB (558 words) - 13:53, 13 March 2023
  • DirectPositionType. Subschema infrastructure Parents* gmlLocations Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (1..1)
    1 KB (5 words) - 15:45, 17 May 2024
  • [Wikipedia]. Subschema infrastructure Parents* circle Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (1..1)
    1 KB (5 words) - 15:47, 17 May 2024
  • Generic:hasName of railML® version 3.2   Documentation particular name and description of the system asset dependent on language Subschema generic Parents* controller
    899 bytes (5 words) - 15:48, 17 May 2024
  • Railway Infrastructure Recording; Erfassung der Schieneninfrastruktur There are several systems and projects that follow the aim to record and visualize
    3 KB (335 words) - 13:48, 13 March 2023
  • Exchange of planning parameters for interlocking with suppliers; Austausch von Planungsparametern für Stellwerke mit Anbietern All the planning parameters
    3 KB (367 words) - 13:47, 13 March 2023
  • element Generic:objectName of railML® version 3.2   Documentation name and description of the object dependent on the language Subschema generic Parents* combinedRoute
    1 KB (5 words) - 15:48, 17 May 2024
  • *.xml or *.railml, that is the question. The answer is: Both. It was not a convention from the beginning, but best practice should be: *.railml shall only
    11 KB (1,742 words) - 18:13, 29 November 2023
  • number of the information. (optional; xs:nonNegativeInteger), description: The verbal description of the information. (optional; xs:string), normalState: The
    1 KB (5 words) - 14:22, 24 January 2020
  • downleft-rightup: Description of a logical position of a simple crossing within a route path from the lower left to upper right upleft-rightdown: Description of a logical
    1 KB (5 words) - 12:42, 8 February 2024
  • number of the information. (optional; xs:nonNegativeInteger), description: The verbal description of the information. (optional; xs:string), normalState: The
    1 KB (5 words) - 14:22, 24 January 2020
  • two. Subschema infrastructure Parents* gmlLocations Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (0..1)
    2 KB (5 words) - 15:45, 17 May 2024
  • tunnelGateIS, underCrossing, weightLimit Children None Attributes: description: description of the external identifier or reference, providing basic information
    2 KB (5 words) - 15:45, 17 May 2024
  • underCrossing, weightLimit Children None Attributes: description: Human-readable, more detailed description as addition to the entry. It should give additional
    2 KB (5 words) - 15:45, 17 May 2024
  • element Generic:assetName of railML® version 3.2   Documentation name and description of the asset dependent on the language Subschema generic Parents* derailerIL
    1 KB (5 words) - 15:47, 17 May 2024
  • Posession Management   Possession is a takeover of responsibility for a part of railway network from the “train operator” to the PICOP (Person In Charge
    3 KB (394 words) - 12:02, 18 July 2022
  • Site preparation data for Signal Controlled Warning Systems (SCWS); Daten zur Standortvorbereitung für signalkontrollierte Warnsysteme An SCWS is a system
    4 KB (571 words) - 13:51, 13 March 2023
  • Import complete timetable for vehicle working scheduling and vehicle workings; Umlaufbildung Fahrzeuge Jahresfahrplan A complete timetable shall be imported
    3 KB (355 words) - 18:11, 27 June 2022
  • passable during traversal of a vessel. (optional; xs:duration), description: Description of the logic. (optional; xs:string), elementNumber: element number
    2 KB (5 words) - 15:47, 17 May 2024
  • interlocking is depending on the way of control. In the generic type description the following information can be included: @isControlType – This describes
    3 KB (405 words) - 15:31, 29 October 2023
  • will be automatically relocked again. (optional; xs:duration), description: Description of the logic. (optional; xs:string), id: unique identifier (optional;
    2 KB (5 words) - 14:22, 24 January 2020
  • initiated or triggered from interlocking. (optional; xs:duration), description: Description of the logic. (optional; xs:string), id: unique identifier (optional;
    2 KB (5 words) - 14:22, 24 January 2020
  • ref: a reference to an external element (optional; xs:string), description: description of the external identifier or reference, providing basic information
    2 KB (5 words) - 18:42, 19 December 2019
  • be tolerated due to running self-test. (optional; xs:duration), description: Description of the logic. (optional; xs:string), elementNumber: element number
    2 KB (5 words) - 15:47, 17 May 2024
  • <rail3:etcsLevelTransition id="8c37ad44-990c-4130-8e16-ebe685f63db5"> <rail3:name description="ETCS Level Transition: L1LS -> L2" language="EN" name="etcsLevelTransition_BON"/>
    2 KB (236 words) - 17:21, 15 January 2024
  • path (given by OCPs) Station Tracks are used to provide a more detailed description which is the desired location inside the Operating Point. Station Track:
    16 KB (1,744 words) - 18:21, 13 May 2024
  • Dev:Guides (category GeneralDescription)
    Guides and Developer Pages   This page provides an overview over pages from the Dev-namespace that offer User Guides, information for developers and connected
    702 bytes (25 words) - 14:53, 7 December 2023
  • schema! Subschema infrastructure Parents* gmlLocations Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (1..1)
    716 bytes (5 words) - 14:21, 24 January 2020
  • vehicle, vehiclePart, weightLimit, workZone Children None Attributes: description: description of the designator, which can be used to provide basic information
    6 KB (5 words) - 15:44, 17 May 2024
  • RS:brakes of railML® version 3.2 UML-visualization of RS Documentation The description and technical data of the installed brake system of the vehicle. Subschema
    435 bytes (5 words) - 15:48, 17 May 2024
  • line network Construction: assets along the track / line Track layout description ETCS level transition locations Points Signals BaliseGroups (if available
    5 KB (441 words) - 09:30, 12 June 2023
  • schema! Subschema infrastructure Parents* gmlLocations Children description (0..1), descriptionReference (0..1), identifier (0..1), name (0..*), pos (0..1)
    789 bytes (5 words) - 14:21, 24 January 2020
  • release is indicated to the operator. (optional; xs:duration), description: Description of the logic. (optional; xs:string), elementNumber: element number
    3 KB (5 words) - 15:47, 17 May 2024
  • RS:tractiveEffort of railML® version 3.2 UML-visualization of RS Documentation The description of the tractive effort of this engine as x-y-curve vs. speed. Subschema
    440 bytes (5 words) - 21:53, 25 April 2022
  • IL:deactivatedBy of railML® version 3.2 UML-visualization of IL Documentation The description of deactivation conditions for this level crossing. Subschema interlocking
    603 bytes (5 words) - 21:51, 25 April 2022
  • RS:brakeEffort of railML® version 3.2 UML-visualization of RS Documentation The description of the resulting brake effort for regular brake application as x-y-curve
    516 bytes (5 words) - 21:53, 25 April 2022
  • direction. Note that the linear ways should form a complete routable description of the watercourse [openStreetMap]. road: unknown road type secondaryRoad:
    7 KB (15 words) - 10:54, 13 May 2024
  • Description: Infrastructure Managers (IM) wish to represent their railway system in terms of standardised data types. Eulynx collects the types and attributes
    3 KB (450 words) - 17:54, 27 June 2022
  • IL:activationCondition of railML® version 3.2 UML-visualization of IL Documentation Description of the possible activation conditions of this level crossing. Subschema
    1 KB (5 words) - 12:41, 8 February 2024
  • Subschema generic Parents* hasCommunicationSettings Children None Attributes: description: should be interpreted in its elements' context, substantiates the name
    845 bytes (5 words) - 15:48, 17 May 2024
  • Parents* hasHmiIndication, hasOperatorCommand Children None Attributes: description: should be interpreted in its elements' context, substantiates the name
    830 bytes (5 words) - 15:48, 17 May 2024
  • Asset Status Representation for TMS Traffic Management Systems (TMS) consider various sorts of input data for the calculation of the current traffic situation
    10 KB (129 words) - 16:01, 27 September 2023
  • IL:routeEntry of railML® version 3.1 UML-visualization of IL Documentation Description of the start point of the route. This is normally a signal. Subschema
    923 bytes (5 words) - 14:22, 24 January 2020
  • IL:overlapReleaseTimer of railML® version 3.1 UML-visualization of IL Documentation Description of overlap release timer (duration, start condition) Subschema interlocking
    744 bytes (5 words) - 18:51, 19 December 2019
  • IL:deactivatedBy of railML® version 3.1 UML-visualization of IL Documentation The description of deactivation conditions for this level crossing. Subschema interlocking
    1 KB (5 words) - 14:21, 24 January 2020
  • Rtm4railml Parents* network Children networkResource (0..*) Attributes: descriptionLevel: specifies the network aggregation, such as micro, macro or meso
    1,004 bytes (5 words) - 15:45, 17 May 2024
  • version 3.1 UML-visualization of IL Documentation Reference to physical description of level crossing interface with list of commands to the field and notifications
    965 bytes (5 words) - 14:21, 24 January 2020
  • IL:interface of railML® version 3.1 UML-visualization of IL Documentation Description of a physical interface with definition of the information to be exchanged
    1 KB (5 words) - 14:22, 24 January 2020
  • IL:routeExit of railML® version 3.1 UML-visualization of IL Documentation Description of the route destination point. In most cases the route destination is
    1,018 bytes (5 words) - 14:22, 24 January 2020
  • version 3.2 UML-visualization of IL Documentation Reference to physical description of level crossing interface with list of commands to the field and notifications
    1 KB (5 words) - 21:51, 25 April 2022
  • IL:activationCondition of railML® version 3.1 UML-visualization of IL Documentation Description of the possible activation conditions of this level crossing. Subschema
    1 KB (5 words) - 14:21, 24 January 2020
  • IL:interface of railML® version 3.2 UML-visualization of IL Documentation Description of a physical interface with definition of the information to be exchanged
    2 KB (5 words) - 15:48, 17 May 2024
  • IL:routeEntry of railML® version 3.2 UML-visualization of IL Documentation Description of the start point of the route. This is normally a signal. Subschema
    1 KB (5 words) - 15:48, 17 May 2024
  • IL:overlapReleaseTimer of railML® version 3.2 UML-visualization of IL Documentation Description of overlap release timer (duration, start condition) Subschema interlocking
    1 KB (5 words) - 12:42, 8 February 2024
  • IL:routeExit of railML® version 3.2 UML-visualization of IL Documentation Description of the route destination point. In most cases the route destination is
    1 KB (5 words) - 15:48, 17 May 2024
  • Réseau nl-BE: Netverklaring fr-BE: Infrabel nl-BE: Infrabel fr-BE: courte description et la source nl-BE: korte beschrijving en de bron Belgium () ENEE ENEE
    13 KB (721 words) - 14:12, 9 October 2023
  • range of signal aspects can be categorised in several groups for the description of their meaning – the so-called @genericAspect. There are the following
    8 KB (1,085 words) - 10:48, 10 November 2023
  • Dev:Reversing trains and formations (category GeneralDescription)
    This article explains basic concepts of handling formation orientation within the timetable subschema. Dieser Artikel erklärt die grundlegenden Konzepte
    7 KB (771 words) - 13:39, 13 March 2023
  • downleft-rightup: Description of a logical position of a simple crossing within a route path from the lower left to upper right upleft-rightdown: Description of a logical
    5 KB (5 words) - 15:47, 17 May 2024
  • IL:reasonForConflict of railML® version 3.1 UML-visualization of IL Documentation Description of the reason for the conflict. Subschema interlocking Parents* conflictingRoute
    2 KB (5 words) - 14:22, 24 January 2020
  • InfrastructureInstallations OperationalPlanning Rollingstock SecondaryCauses, reasonDescription: May be used to provide a textual reasoning for the cancellation intended
    2 KB (5 words) - 12:43, 8 February 2024
  • IL:reasonForConflict of railML® version 3.2 UML-visualization of IL Documentation Description of the reason for the conflict. Subschema interlocking Parents* conflictingRoute
    2 KB (5 words) - 12:42, 8 February 2024
  • IL:routeActivationSection of railML® version 3.1 UML-visualization of IL Documentation Description of the route activation, i.e. automatic setting or locking when the route
    1 KB (5 words) - 14:22, 24 January 2020
  • IL:routeActivationSection of railML® version 3.2 UML-visualization of IL Documentation Description of the route activation, i.e. automatic setting or locking when the route
    1 KB (5 words) - 15:48, 17 May 2024
  • three <netElement> objects are fully covered by the <line>. The resulting description of the railway line looks like this: <lines> <line id="lin01" lineCategory="other:CE"
    9 KB (873 words) - 11:03, 13 May 2024
  • used to direct vehicles from one track to another track. To separate the description of the infrastructure topology from its construction, railML® 3 is based
    18 KB (2,052 words) - 18:20, 15 April 2024
  • vehicleManufacturer, vehicleOperator, weightLimit Children None Attributes: description: should be interpreted in its elements' context, substantiates the name
    5 KB (5 words) - 15:44, 17 May 2024
  • element Generic:vehicleBrakes of railML® version 3.2   Documentation Description of the type of vehicle brakes and their application as brake effort or
    2 KB (5 words) - 15:48, 17 May 2024
  • for element Generic:trainBrakes of railML® version 3.2   Documentation Description of the type of brakes within the formation and their application as brake
    2 KB (5 words) - 15:48, 17 May 2024
  • not be used as leading information, but rather as derived additional description. (obligatory; xs:integer; minInclusive: 0; maxInclusive: 15) *Notice:
    534 bytes (5 words) - 21:49, 25 April 2022
  • elements' context (e.g. signal/name, vehicle/name) (obligatory; xs:string), description: should be interpreted in its elements' context, substantiates the name
    3 KB (5 words) - 11:56, 14 February 2021
  • Infrastructure The railML® Infrastructure subschema is focused on the description of the railway network infrastructure including all its various facets
    10 KB (1,041 words) - 10:56, 2 May 2024
  • direction. Note that the linear ways should form a complete routable description of the watercourse [openStreetMap]. road: unknown road type secondaryRoad:
    4 KB (5 words) - 15:46, 17 May 2024
  • Rtm4railml Parents* network Children networkResource (0..*) Attributes: descriptionLevel: This attribute is not documented in the schema! (optional; xs:string)
    863 bytes (5 words) - 18:16, 23 December 2019
View ( | ) (20 | 50 | 100 | 250 | 500)