Search results
Jump to navigation
Jump to search
- UC:Use cases (section What is a use case?)– IL Use Cases – IS Use Cases – RS Use Cases – TT Use Cases View/edit list on the separate source page If you want to reactivate your inactive use case7 KB (287 words) - 16:17, 13 May 2024
- IL:signalIL (category Pages using Tabber parser tag)The block signal is used on open line at the start of a block route. blockInterface - This signal is in most cases a virtual signal used to transfer the actual9 KB (1,314 words) - 10:15, 19 May 2023
- IL:conflictingRoute (category Pages using Tabber parser tag)value is used in case of any TVD section of the route is also used by the conflicting one. ConflictingHeadProtection – This value is used in case any signal5 KB (573 words) - 12:09, 28 May 2022
- Current UML visualization A list of use cases for railML's interlocking scheme can be found here Category:Use_case_(IL). Interlocking Concepts — explanations1 KB (153 words) - 18:26, 3 November 2023
- IL:switchIL (category Missing Attribute Documentation/IL)</relatedDerailerInPosition> </hasPositionRestriction> </switchIL> </switchesIL> <derailersIL> <derailerIL returnsToPreferredPosition="true" id="dr_der01" isKeyLocked="false"19 KB (1,714 words) - 09:32, 3 May 2023
- IL:levelCrossingIL (category Pages using Tabber parser tag)modelled in <levelCrossingIL>. In order to avoid ambiguity with the infrastructure element the related type is called levelCrossingIL in railML interlocking18 KB (1,997 words) - 15:11, 4 June 2022
- IL:route (category Pages using Tabber parser tag)route lock is only applied when a train is approaching the route. In that case this time is the minimum required before the final route lock can be applied9 KB (1,077 words) - 08:15, 7 May 2022
- IL:routeExit (category Pages using Tabber parser tag)is the reference to the physical end of the route path. This is in most cases a signal but can also be a buffer stop or just a train detection device when2 KB (187 words) - 20:37, 29 January 2020
- IL:tvdSection (category Pages using Tabber parser tag)<hasExitSignal> – This is the reference to a <signalIL> which protects the exit from this TVD section. It shall be used in case @isBerthingTrack is set to true. Within7 KB (829 words) - 15:11, 27 May 2022
- IL:assetsForIL (category Pages using Tabber parser tag)infrastructure subschema. In such cases just the suffix “IL” was added to the name, e.g. signalIS vs. signalIL. The element of <assetsForIL> is not only a collection2 KB (272 words) - 12:02, 21 May 2022
- IL:assetsForInterlocking (category Pages using Tabber parser tag)in infrastructure subschema. In such cases just the suffix “IL” was added to the name, e.g. signalIS vs. signalIL. The element of <assetsForInterlocking>3 KB (359 words) - 13:19, 29 May 2022
- IL:derailerIL (category Missing Attribute Documentation/IL)</relatedDerailerInPosition> </hasPositionRestriction> </switchIL> </switchesIL> <derailersIL> <derailerIL returnsToPreferredPosition="true" id="dr_der01" isKeyLocked="false"5 KB (484 words) - 12:44, 27 May 2022
- IL:movableCrossing (category Missing Attribute Documentation/IL)position. In case of switch actuators connected to the crossing for changing its position the attribute @numberOfFrogSwitchActuators shall be used to identify15 KB (1,510 words) - 19:13, 14 February 2022
- IL:reasonForConflict (category Pages using Tabber parser tag)conflictingHeadProtection: This value is used in case any signal that shall provide flank/head protection to either route is used as route destination for the other520 bytes (9 words) - 18:50, 19 December 2019
- IL:hasTVDresetStrategy (category Pages using Tabber parser tag)They deliver mainly the status information vacant, occupied or failed. In case of a failure the particular sections needs to be reset, i.e. declared clear4 KB (406 words) - 17:47, 22 January 2020
- IL:tunnelGateIL (category Pages using Tabber parser tag)tunnelGateIL is installed at tunnel portals or within the tunnel to fulfill various purposes. When installed at the portals they are mainly used to control5 KB (599 words) - 14:26, 27 May 2022
- IL:activationCondition (category Pages using Tabber parser tag)conditions to conclude a train is approaching the level crossing. In first case this happens when the train crosses a detection point, i.e. an insulated4 KB (465 words) - 12:14, 30 May 2020
- IL:relatedMovableElement (category Pages using Tabber parser tag)for element IL:relatedMovableElement of railML® version 3.2 UML-visualization of IL Documentation reference to other movable element in case of single/double524 bytes (5 words) - 18:47, 19 December 2019
- IL:interface (category Pages using Tabber parser tag)element. @bitNr – This is the order number of the command in the list. In case of transmission as complete bitmask it defines the bit position in the byte13 KB (1,119 words) - 17:46, 30 January 2020
- IL:implementsSignalplan (category Pages using Tabber parser tag)signal is showing. This element shall be used for “old-style” signalling systems with separate distant signals or in case of repeaters within the route. <signalsSpeedProfile>17 KB (1,655 words) - 17:19, 30 January 2020