Search results
Jump to navigation
Jump to search
- – The name of the asset in the related language. @description – The additional optional description for the asset. @language – The identification of the3 KB (356 words) - 18:05, 18 August 2021
- <gmlLocations> <lineString> <description> <descriptionReference> <identifier> <name> <pos> <posList> <point> <description> <descriptionReference> <identifier>125 KB (1,906 words) - 03:09, 26 October 2023
- <rail3:etcsAreas> <rail3:etcsArea id="etcsArea01" mVersion="33"> <rail3:name description="ETCS area Border: M_VERSION 1.1 -> 2.1" language="EN" name="etcsArea_Border_BON"/>5 KB (655 words) - 16:22, 15 January 2024
- Rtm4railml Parents* network Children networkResource (0..*) Attributes: descriptionLevel: specifies the network aggregation, such as micro, macro or meso599 bytes (28 words) - 11:08, 26 February 2024
- IL:routeActivationSection of railML® version 3.2 UML-visualization of IL Documentation Description of the route activation, i.e. automatic setting or locking when the route2 KB (271 words) - 20:16, 29 January 2020
- Dev:catalog (category GeneralDescription)Xerces with some additional flags/parameter: <target name="xml-validate" description="Validate ${xml-file} against its schema files"> <schemavalidate file="${xml-file}15 KB (1,996 words) - 12:36, 20 August 2021
- IL:reasonForConflict of railML® version 3.2 UML-visualization of IL Documentation Description of the reason for the conflict. Subschema interlocking Parents* conflictingRoute520 bytes (9 words) - 18:50, 19 December 2019
- Example entry <trainClearanceGauge code="GA"> <description>stucture gauge GA according European standard</description> <validFor>interoperable</validFor> </trainClearanceGauge>6 KB (294 words) - 14:03, 7 December 2023
- IL:overlapReleaseTimer of railML® version 3.2 UML-visualization of IL Documentation Description of overlap release timer (duration, start condition) Subschema interlocking522 bytes (5 words) - 18:51, 19 December 2019
- Dev:versions (category GeneralDescription)Reason Commited changes have affects on XML-instance files and should be announced in advance in corresponding railML® newsgroups. Decision Tagging a major9 KB (1,043 words) - 11:28, 15 February 2023
- Exchange of Logical Train Positions Current train positions should be exchanged between a TMS and other systems. Current position means: the position16 KB (1,407 words) - 11:50, 18 July 2022
- UC:IS:Timetabling (section Description / Beschreibung)Timetabling; Fahrplan Each RU has to provide a timetable for their train- and shunting movements in a coming time period. Besides the RU itself the involved3 KB (343 words) - 13:44, 13 March 2023
- the objects associated with this route and set them accordingly. The description of a route starts with the following information: @locksAutomatically9 KB (1,077 words) - 08:15, 7 May 2022
- UC:IL:Simulation (section Description / Beschreibung)instance routesetting. An interlocking is required to set and lock routes. A description of routes in terms of railML is of interest to both engineering and simulation7 KB (959 words) - 14:06, 7 December 2023
- InfrastructureInstallations OperationalPlanning Rollingstock SecondaryCauses, reasonDescription: May be used to provide a textual reasoning for the cancellation intended514 bytes (38 words) - 21:55, 25 April 2022
- Rail Inspection Data ; Schienenprüfdaten The application broaches the issue of railway track inspection and maintenance. With the help of railML data,4 KB (354 words) - 16:37, 4 December 2023
- RS:brakes of railML® version 3.2 UML-visualization of RS Documentation The description and technical data of the installed brake system of the vehicle. Subschema509 bytes (38 words) - 16:19, 5 March 2021
- UC:TT:TAF/TAP TSI (section Description / Beschreibung)connections: <connection> element(s) with connType='commercial' stop description: only <stopDescription> elements with commercial='true' will be relevant including4 KB (592 words) - 18:06, 7 December 2023
- scope='commercial' connections: <commercialConnection> element(s) stop description: only <stop> elements which contain a <isCommercial> elemente will be5 KB (751 words) - 13:28, 13 March 2023
- Automatic Schemaexport for Element description772 bytes (5 words) - 15:45, 17 May 2024
- Automatic Schemaexport for Element descriptionReference658 bytes (5 words) - 15:45, 17 May 2024
- RS:brakeEffort of railML® version 3.2 UML-visualization of RS Documentation The description of the resulting brake effort for regular brake application as x-y-curve514 bytes (38 words) - 16:19, 5 March 2021
- RS:tractiveEffort of railML® version 3.2 UML-visualization of RS Documentation The description of the tractive effort of this engine as x-y-curve vs. speed. Subschema517 bytes (38 words) - 16:19, 5 March 2021
- Automatic Schemaexport for Element description359 bytes (5 words) - 18:41, 19 December 2019
- Automatic Schemaexport for Element descriptionReference500 bytes (5 words) - 18:41, 19 December 2019
- after finalizing the use case in the working groups alongside with this description. Rollingstock data usually includes the capabilities of the available6 KB (858 words) - 12:09, 25 March 2024
- CAD for railway signalling; CAD für Zugsignalisierung Engineers of the railway signaling discipline use a Computer-Aided Design (CAD) tool to model a railway1 KB (127 words) - 14:12, 7 December 2023
- Operational simulation; Betriebssimulation For various purposes it is necessary to simulate the process of railway operation for a fragment or an entire1 KB (146 words) - 13:29, 13 March 2023
- UC:TT:SlotOrdering (section Description / Beschreibung)Earliest departure Latest departure Minimum stop time Stop type, stop description Commercial connections Infrastructure <ocpTT> Ordered stops Rolling stock2 KB (273 words) - 13:26, 13 March 2023
- Railway Infrastructure Visualisation; Visualisierung von Schieneninfrastruktur The typical railway planning process involves several iterations with different2 KB (180 words) - 13:43, 13 March 2023
- UC:IS:NREReporting (section Description / Beschreibung)ÖBB-SCHIG-Reporting (NRE Reporting Austria); NRE Meldung Österreich ÖBB Infrastructure reports several properties of the line and track network periodically2 KB (225 words) - 13:45, 13 March 2023
- </netRelation> </netRelations> <networks> <network id="nw01"> <level id="lv0" descriptionLevel="Micro"> <networkResource ref="ne_a01"/> <networkResource ref="ne_a02"/>9 KB (931 words) - 12:07, 4 April 2024
- the use case here. The headline is made with Template: UC description (type {{UC description}}) In this section the data flows should be drafted. The headline2 KB (220 words) - 16:25, 4 December 2023
- document for the equipment of the interlocking logic. An interlocking description consists mainly of: Track and trackside signalling components, Route control4 KB (493 words) - 10:38, 31 May 2021
- Speed directory; VzG – Verzeichnis zulässiger Geschwindigkeiten The VzG Process is the central interface between infrastructure business processes (building3 KB (117 words) - 13:45, 13 March 2023
- Traction power supply simulation; Simulierung der Bahnstromversorgung For various purposes it is necessary to simulate the (electrical) traction power2 KB (236 words) - 13:43, 13 March 2023
- Adopt vehicle working scheduling to timetable changes; Umlauf an Jahresfahrplan anpassen The importing system holds timetable and vehicle working data2 KB (209 words) - 18:11, 27 June 2022
- information of the related network in the interlocking. Therefore the description of is mainly a list of references to the related items needed for the6 KB (597 words) - 13:58, 21 August 2021
- Dev:Git Guidelines (category GeneralDescription)Only commit to the master branch directly if the changes your are commiting are complete in themselves and don't change the syntax of railML®. Changes8 KB (1,082 words) - 13:18, 26 July 2023
- Dev:Extending railML (category GeneralDescription)Extending railML® There exists a wide range of means to extend XML Schemas. As railML® is intended for collaboration with other parties, there is a frame7 KB (985 words) - 10:01, 1 June 2022
- Railway Laboratory (Simulations and Research Support) The aim of our project is to simulate railway traffic in laboratory conditions in order to improve3 KB (427 words) - 17:57, 27 June 2022
- Capture schematic visualisation information of track assets; Erstellung schematischer Visualisierungsinformationen von Schienenanlagen railML data will3 KB (383 words) - 13:44, 13 March 2023
- elementNumber="0" id="" indicatorType="cautiousDriving"> <rail3:designator description="" entry="" register=""/> <rail3:hasCommand entityCode="" ref=""/> <rail3:hasIndication2 KB (240 words) - 13:40, 28 May 2022
- tor elementNumber="0" id="" positionInRoute="end"> <rail3:designator description="" entry="" register=""/> <rail3:hasCommand entityCode="" ref=""/> <rail3:hasIndication2 KB (200 words) - 13:21, 28 May 2022
- Long Term Strategic Timetabling; Langfristfahrplanerstellung The timetable data prepared in this use case is not formally linked to the production process4 KB (523 words) - 11:14, 18 July 2022
- Schematic Track Plan Infrastructure managers use maps for the visualization of their railway infrastructure. These maps comprise: Geographic maps Geoschematic4 KB (198 words) - 16:57, 13 February 2023
- (optional; xs:string) Possible values: backward forward, fromDescription: Textual description of the origin. (optional; xs:string), ref: The actual reference2 KB (5 words) - 12:43, 8 February 2024
- RINF-XML, and therefore support and maintain natively the railML3 RINF file description according to the evolutions of the project. The railML3 file for RINF3 KB (297 words) - 13:49, 13 March 2023
- Dev:Using xsi:type (category GeneralDescription)Using xsi:type Before implementing any extensions to the railML® schema, please consider Dev:Extending_railML#when. The means described in this page18 KB (2,309 words) - 14:28, 1 August 2022
- Parents* hasHmiIndication, hasOperatorCommand Children None Attributes: description: should be interpreted in its elements' context, substantiates the name519 bytes (58 words) - 12:42, 8 February 2024