Search results

Jump to navigation Jump to search
  • UC:TT:TimetableInformation (category Use case (TT)) (section Use case / Anwendungsfall)
    and print material as well as ticketing and real-time information. This use case will focus on the definition of the minimum requirements for passenger
    5 KB (751 words) - 13:28, 13 March 2023
  • IL:conflictingRoute (category Pages using Tabber parser tag)
    value is used in case of any TVD section of the route is also used by the conflicting one. ConflictingHeadProtection – This value is used in case any signal
    5 KB (573 words) - 12:09, 28 May 2022
  • IL:switchIL (category Pages using Tabber parser tag)
    type is called switchIL in railML interlocking subschema, whereas its counterpart in infrastructure is called switchIS. The switch is commonly used for
    19 KB (1,714 words) - 09:32, 3 May 2023
  • with us. To learn where to find, how to use and how to contribute use cases see Dev:Use cases. While use cases follow a top-down approach, starting out
    5 KB (674 words) - 15:49, 15 April 2024
  • and track conditions. A list of use cases for the railML® infrastructure schema can be found on page Category:Use case (IS). →Main Article: Rollingstock
    10 KB (1,041 words) - 10:56, 2 May 2024
  • for a railML® use case: A timetable for a competition (call for proposals) Ausschreibungsfahrplan The use case describes a timetable which is transferred
    16 KB (1,903 words) - 13:27, 13 March 2023
  • UC:RS:OperationalSimulation (category Use case (RS)) (section Use case / Anwendungsfall)
    Operational simulation; Betriebssimulation For various purposes it is necessary to simulate the process of railway operation for a fragment or an entire
    1 KB (146 words) - 13:29, 13 March 2023
  • complete timetable for vehicle working scheduling_. Postcondition The train is changed within the validity of the change request, and unchanged outside.
    2 KB (209 words) - 18:11, 27 June 2022
  • UC:TT:SlotOrdering (category Use case (TT)) (section Use case / Anwendungsfall)
    This use case covers the ordering of slots by Railway Undertakings from Infrastructure Manager(s) and other managers of capacity. A related use case will
    2 KB (273 words) - 13:26, 13 March 2023
  • attributes. In case of consuming "wrong styled" id values the importing software is not required to extract semantics encoded in the id value. The use of this
    5 KB (463 words) - 12:22, 3 November 2023
  • IL:movableCrossing (category Pages using Tabber parser tag)
    crossing whether this is physically needed or not. Subsequently the crossing as represented in the interlocking can have a position. In case of switch actuators
    15 KB (1,510 words) - 19:13, 14 February 2022
  • and Rostering   Related subschemas: IS RS  Reported by: PSI For general information on use cases see UC:Use cases
    6 KB (691 words) - 13:28, 13 March 2023
  • UC:TT:FGIInTrain (category Use case (TT)) (section Use case / Anwendungsfall)
    <rostering> is included, the element <rollingstock> is also required The elements <infrastructure> and <rollingstock> are master data for the use case "passenger
    9 KB (677 words) - 18:10, 27 June 2022
  • UC:TT:ExchangeOfFormationData (category Use case (TT)) (section Use case / Anwendungsfall)
    commercial train elements.) A better modelling for this aspect is, in the author’s opinion, to use the concept of commercial trains in a different way than currently
    6 KB (688 words) - 13:26, 13 March 2023
  • UC:IL:InterlockingEngineering (category Use case (IL)) (section Use case / Anwendungsfall)
    exchange format. This use case concerns the exchange of engineering data for tailoring an interlocking to fit a station. This use case focuses on "legacy"
    11 KB (828 words) - 13:25, 13 March 2023
  • IL:reasonForConflict (category Pages using Tabber parser tag)
    value is used in case any signal that shall provide flank/head protection to either route is used as route destination for the other route, which is excluded
    520 bytes (9 words) - 18:50, 19 December 2019
  • Dev:Use case example/old (category Use case (unknown subschema)) (section Use case / Anwendungsfall)
    good use case. For an actual example see UC:IS:Schematic Track Plan. To get more information on use cases and how to describe them, see Dev:Use cases. Please
    2 KB (220 words) - 16:25, 4 December 2023
  • UC:IL:HardwareAndCablePlan (category Use case (IL)) (section Use case / Anwendungsfall)
    Information Category: Topology (origin: railML IS schema or classic track plan) Cable plan (origin: railML IS schema or classic track plan) infrastructure
    1 KB (119 words) - 13:51, 13 March 2023
  • UC:IL:EulynxDataPreparationInterlocking (category Use case (IL))
    reflect the as-built situation. Please refer to the linked use cases that cover the Eulynx use case. For detailed information please refer to the website https://eulynx
    3 KB (450 words) - 17:54, 27 June 2022
  • IS:baliseGroup (category Pages using Tabber parser tag)
    regular accuracy towards the measured location is +/- 5m (locationAccuracy="5"). UNISIG-baseline 3 is in use (mVersion="32"). Corresponding railML® description:
    19 KB (2,555 words) - 16:55, 18 January 2024
View ( | ) (20 | 50 | 100 | 250 | 500)