Template:Table/Dev:Semantic Constraints

From railML 3 Wiki
Revision as of 11:55, 29 January 2024 by RailML Orga Ontology (talk | contribs) (added IS:007)
Jump to navigation Jump to search

Return to article

Element ID Proposal date Date of acception Date of deprecation Description
<TT:operationalTrainSectionPart> TT:001 2022-09-15 2022-10-13 There is always only a single successor and predecessor for an <operationalTrainSectionPart> in the chain of <operationalTrainSectionPart>s that are linked via the attribute @next.
<TT:operationalTrainVariant> TT:002 2023-01-12 2023-04-06 When calculating which <operationalTrainVariant> of an <operationalTrain> is valid on a particular day always a maximum of one active <operationalTrainVariant> shall be the result. If the result is more than one <operationalTrainVariant>, all except one shall be marked as <isCancelled> or <isOnRequest>.
<TT:commercialTrainVariant> TT:003 2023-01-12 2023-04-06 When calculating which <commercialTrainVariant> of an <commercialTrain> is valid on a particular day always a maximum of one active <commercialTrainVariant> shall be the result. If the result is more than one <commercialTrainVariant>, all except one shall be marked as <isCancelled> or <isOnRequest>.
<TT:operationalTrainSection> TT:004 2022-01-12 2023-03-09 The itinerary sections of an <operationalTrainVariant>, defined by the <operationalTrainSection>s and their respective <range>s, that are not <isCancelled> and not marked as <isOnRequest>, must be pairwise disjoint, except for their respective first and last <baseItineraryPoint>s.
<TT:operationalTrainSection> TT:005 2022-01-12 2023-03-09 The first(last) <baseItineraryPoint> of each <operationalTrainSection> within an <operationalTrainVariant> must either be the referenced <itinerary>'s first(last) <baseItineraryPoint>, or coincide with another section's last(first) <baseItineraryPoint>.
<TT:commercialTrainSection> TT:006 2022-01-12 2023-03-09 The itinerary sections of an <commercialTrainVariant>, defined by the <commercialTrainSection>s and their respective <range>s, that are not <isCancelled> and not marked as <isOnRequest>, must be pairwise disjoint, except for their respective first and last <baseItineraryPoint>s.
<TT:commercialTrainSection> TT:007 2022-01-12 2023-03-09 The first(last) <baseItineraryPoint> of each <commercialTrainSection> within an <commercialTrainVariant> must either be the referenced <itinerary>'s first(last) <baseItineraryPoint>, or coincide with another section's last(first) <baseItineraryPoint>.
<RTM:isValid>, <CO:validityTime:period> IS:001 2024-01-15

Starting time stamp (e.g. "from") shall be lower or equal any ending time stamp (e.g. "to") if both are given. Must not overlap with other validity periods.

<IS:trainProtectionElement> IS:002 2021-02-26

<trainProtectionElement> shall only be used for national and/or legacy train protection systems. ETCS-based systems must not be modeled using <trainProtectionElement>.

<IS:levelCrossingIS> IS:003 2023-10-23

<levelCrossingIS> should not have a <crossesElement> child of type railway. This case should be represented either by a <crossing> in case of a simple crossing, or by a <switchIS> of type doubleSwitchCrossing or singleSwitchCrossing.

<IS:underCrossing>, <IS:overCrossing> IS:004 2023-10-23

should only have a <crossesElement> child of type railway when your railway line is crossing itself (not on the same level!).

<IS:signalConstruction> IS:005 2024-01-22

@height and @positionAtTrack should not be used with @type=virtual.

<IS:line> IS:006 2024-01-29

each line with own mileage should always be associated with its own <linearPositioningSystem>, i.e. Advanced example of railML has three lines with their own mileages, thus should have thee <linearPositioningSystem>s.

<IS:border> IS:007 2024-01-29

if @isOpenEnd="true" then statement @type="area" is true.