Search results
Jump to navigation
Jump to search
- </relatedDerailerInPosition> </hasPositionRestriction> </switchIL> </switchesIL> <derailersIL> <derailerIL returnsToPreferredPosition="true" id="dr_der01" isKeyLocked="false"19 KB (1,714 words) - 09:32, 3 May 2023
- signalIL, signalIS, signalWithAspect, slaveAspect, specificIM, speedSection, spotElementProjection, stoppingPlace, switchIL, switchIS, switchInPosition506 bytes (4 words) - 17:35, 20 April 2020
- signalDelayTime, signalIL, signalIS, signalWithAspect, slaveAspect, specificIM, speedSection, stoppingPlace, switchIL, switchIS, switchInPosition, switchPositionInDepartureTrack1 KB (156 words) - 17:49, 24 January 2022
- spotElementProjection, stationIndicator, stoppingPlace, switchIL, switchIS, switchInPosition, track, trackBed, trackGauge, trackIL, trainDetectionElement, trainNumberField518 bytes (58 words) - 12:39, 8 February 2024
- </relatedDerailerInPosition> </hasPositionRestriction> </switchIL> </switchesIL> <derailersIL> <derailerIL returnsToPreferredPosition="true" id="dr_der01" isKeyLocked="false"5 KB (484 words) - 12:44, 27 May 2022
- IL:movableCrossing (category Missing Attribute Documentation/IL)They shall not be mixed up with single or double slip switches, which are a combination of switches with a crossing within one element. In majority of cases15 KB (1,510 words) - 19:13, 14 February 2022
- ref="rt_sig02_sig04"/> <requiresSwitchInPosition mustOrShould="should" proving="oneOff"> <relatedSwitchAndPosition inPosition="left"> <refersToSwitch ref="pt_swi02" />9 KB (1,077 words) - 08:15, 7 May 2022
- ref="rt_sig02_sig04"/> <requiresSwitchInPosition mustOrShould="should" proving="oneOff"> <relatedSwitchAndPosition inPosition="left"> <refersToSwitch ref="pt_swi02" />5 KB (609 words) - 15:20, 4 April 2024
- infrastructure subschema. In such cases just the suffix “IL” was added to the name, e.g. signalIS vs. signalIL. The element of <assetsForInterlocking> is not only3 KB (359 words) - 13:19, 29 May 2022
- subschema. In such cases just the suffix “IL” was added to the name, e.g. signalIS vs. signalIL. The element of <assetsForIL> is not only a collection of track2 KB (272 words) - 12:02, 21 May 2022
- Automatic Schemaexport for Element switchIL4 KB (5 words) - 14:21, 24 January 2020
- shunter to return control of the area to the signalman. <switchInPosition>– The reference to any switch which shall be in a particular position for this local3 KB (452 words) - 05:55, 18 April 2022
- details refer chapter 1.1.15above. <requiredSwitchPosition> – This is the reference to the related switch, its position and the level of enforcement.3 KB (283 words) - 20:54, 29 January 2020
- IL:switchIL/3.2 (category Missing Attribute Documentation/IL)Automatic Schemaexport for Element switchIL5 KB (5 words) - 12:41, 8 February 2024
- delayBySwitchPosition, facingSwitchInPosition, relatedSwitchAndPosition, relatedSwitchInPosition, switchPositionInDepartureTrack, trailingSwitchInPosition517 bytes (9 words) - 18:47, 19 December 2019
- @numberOfSimultaneousSwitchingActuators – This is the maximum number of switch actuators activated simultaneously with this power supply. If more switch actuators3 KB (356 words) - 18:05, 18 August 2021
- the workers did return the key/token into the lock. <switchInPosition>– The reference to any switch which shall be in a particular position for this work3 KB (476 words) - 19:35, 29 January 2020
- This element does not appear in railML® 3.1 within the IL subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further716 bytes (61 words) - 15:10, 14 May 2022
- This element does not appear in railML® 3.1 within the IL subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further516 bytes (38 words) - 16:16, 5 March 2021
- activatedBy, derailerIL, destinationPoint, genericDetector, keyLockIL, levelCrossingIL, movableCrossing, routeEntry, routeExit, signalIL, switchIL Children None511 bytes (15 words) - 18:47, 19 December 2019