Search results

Jump to navigation Jump to search
  • g. <operationalPoint id="04b6f736-23f7-429c-be8a-e286172de2c1">... Please note: a Nil UUID () shall not be used; UUID's Version 4 () is commonly used. Sometimes
    5 KB (463 words) - 12:22, 3 November 2023
  • IS:switchIS (section Notes)
    coordinates, as well as their names, are marked in the following figure: Please note: The switch is an element that is relevant in both domains: infrastructure
    5 KB (519 words) - 10:51, 15 May 2024
  • IL:route (section Notes)
    elements with their position or state, which are relevant for the route. Note that information about the route path, which is derivable by using the entry
    9 KB (1,077 words) - 08:15, 7 May 2022
  • mechanisms (see following subsections). Note The XSD file location should be considered as nothing more than a "note" for the software which reads the railML
    15 KB (1,996 words) - 12:36, 20 August 2021
  • configuration is always considered diagonal when describing its features. Note: The above picture shows the often-used combination of four switches with
    15 KB (1,510 words) - 19:13, 14 February 2022
  • 6.0, section 3.11.4: an Axle Load Speed Profile or other speed profiles. Note that the information of Temporary Speed Restrictions (TSR) according to UNISIG
    19 KB (2,085 words) - 21:02, 15 January 2024
  • One possible use is for definition of specific flank protection conditions. Note that these relations may well be captured in a control table, once it is
    3 KB (283 words) - 20:54, 29 January 2020
  • IL:derailerIL (section Notes)
    planners to estimate the influence of slow throwing switches on train traffic. Note that this excludes controller (OCS) processing time and communication between
    5 KB (484 words) - 12:44, 27 May 2022
  • an endDate that is the base of the enclosing bitmask. It is important to note that the weekPatterns provided here are not the leading information in terms
    519 bytes (58 words) - 12:41, 8 February 2024
  • TT:connector (section Notes)
    transports the passengers or the freight from the connection point onward. Please note that a connection from an external train to an external train is not permitted
    512 bytes (38 words) - 21:56, 25 April 2022
  • TT:feeder (section Notes)
    transports the passengers or the freight to the connection point. Please note that a connection from an external train to an external train is not permitted
    509 bytes (38 words) - 21:56, 25 April 2022
  • IS:line (section Notes)
    child elements, which provide the reference to the topology layer. Please note, that in the specific example the anchor locations on the <netElement> objects
    9 KB (873 words) - 11:03, 13 May 2024
  • IL:controller (section Notes)
    serial bus. The protocol (IP, UDP, serial, parallel) is irrelevant to railML. Note that a Control Centre (DE: Leitstelle, FR: Poste de controle, NL: VL-post)
    4 KB (460 words) - 05:23, 18 April 2022
  • </linearPositioningSystem> </linearPositioningSystems> </positioning> </common> Please note Although the attribute @units allows you to define any possible unit for
    11 KB (1,110 words) - 09:59, 29 April 2024
  • IL:switchIL (section Notes)
    planners to estimate the influence of slow throwing switches on train traffic. Note that this excludes controller (OCS) processing time and communication between
    19 KB (1,714 words) - 09:32, 3 May 2023
  • IL:overlap (section Notes)
    overlap are locked. Trailing switches in the overlap are may be not locked. Note that there is no need to explicitly identify the switches in the overlap
    5 KB (609 words) - 15:20, 4 April 2024
  • intrinsic location and the railway line coordinates mentioned above. Please note: An <operationalPoint> is modelled as part of the <functionalInfrastructure>
    4 KB (380 words) - 16:53, 20 September 2021
  • IL:keyLockIL (section Notes)
    when the key is inserted and the staff acknowledged relinquishing control. Note that the lock is a track asset defined in infrastructure namespace. The interlocking
    4 KB (531 words) - 19:18, 29 January 2020
  • interlocking for information. In most cases this will be a vendor specific string. Note: in v3.1 attribute was named "SWversion" @signalSystem – This contains the
    3 KB (385 words) - 14:00, 21 August 2021
  • Defining namespaces and validating railML® files and Namespace handling. Please note the following further remarks: The file names (and comments) of the files
    11 KB (1,742 words) - 18:13, 29 November 2023
  • RTM:anchor (section Notes)
    System> is usually used to represent mileages of a railway lines. Please note that mileages can also be referred as “chainages” in the national regulations
    3 KB (269 words) - 17:11, 19 April 2024
  • an endDate that is the base of the enclosing bitmask. It is important to note that the weekPatterns provided here are not the leading information in terms
    3 KB (5 words) - 15:55, 8 February 2024
  • [openStreetMap]. river: linear flow of larger natural waterways, in flow direction. Note that the linear ways should form a complete routable description of the watercourse
    7 KB (15 words) - 10:54, 13 May 2024
  • transports the passengers or the freight to the connection point. Please note that a connection from an external train to an external train is not permitted
    606 bytes (5 words) - 17:41, 15 January 2024
  • transports the passengers or the freight from the connection point onward. Please note that a connection from an external train to an external train is not permitted
    624 bytes (5 words) - 17:41, 15 January 2024
  • the necessary steps and the requirements in general. It is important to note, to which railML® versions a use case or certain aspects of it apply, as
    7 KB (1,035 words) - 17:27, 5 February 2024
  • wait for another train to arrive at a certain location before departing. Note that in order for this dependency to apply the validity of the enclosing
    525 bytes (38 words) - 21:55, 25 April 2022
  • another train variant for the purpose of receiving the other trains crew. Note that in order for this dependency to apply the validity of the enclosing
    525 bytes (38 words) - 21:55, 25 April 2022
  • another route. Automatikfahrstrasse in German, trace automatique in French. Note that this functionality is often part of the control system in which case
    3 KB (5 words) - 14:22, 24 January 2020
  • indicates that data can be used for the purpose of configuring ETCS systems. Note that the Eulynx project, with whom railML cooperates, defines data in terms
    11 KB (828 words) - 13:25, 13 March 2023
  • section from the website and start contributing to the railML Wiki. Please note that the system will automatically switch to the Wiki page for editing. If
    11 KB (1,424 words) - 18:13, 15 April 2024
  • This element does not appear in railML® 3.1 within the generic subschema. It is available only in railML® 3.2. There exists an element <CO:designator>
    518 bytes (58 words) - 12:39, 8 February 2024
  • another route. Automatikfahrstrasse in German, trace automatique in French. Note that this functionality is often part of the control system in which case
    4 KB (5 words) - 12:42, 8 February 2024
  • Generic:name (section Notes)
    This element does not appear in railML® 3.1 within the generic subschema. It is available only in railML® 3.2. There exists an element <CO:name> that might
    512 bytes (58 words) - 12:39, 8 February 2024
  • CO:designator (section Notes)
    This element does not appear in railML® 3.2 within the CO subschema. It is available only in railML® 3.1. There exists an element <generic:designator>
    1 KB (156 words) - 17:49, 24 January 2022
  • planners to estimate the influence of slow throwing switches on train traffic. Note that this excludes controller (OCS) processing time and communication between
    4 KB (5 words) - 14:21, 24 January 2020
  • planners to estimate the influence of slow throwing switches on train traffic. Note that this excludes controller (OCS) processing time and communication between
    4 KB (5 words) - 14:21, 24 January 2020
  • planners to estimate the influence of slow throwing switches on train traffic. Note that this excludes controller (OCS) processing time and communication between
    4 KB (5 words) - 14:21, 24 January 2020
  • [openStreetMap]. river: linear flow of larger natural waterways, in flow direction. Note that the linear ways should form a complete routable description of the watercourse
    4 KB (5 words) - 12:40, 8 February 2024
  • railML® 2 ticket system and the railML® 3 ticket system respectively. Please note that 2023-04-24 Common was split into Common and Generic due to technical
    10 KB (1,041 words) - 10:56, 2 May 2024
  • XS:any (section Notes)
    The parents have changed.
    506 bytes (4 words) - 17:35, 20 April 2020
  • Regarding its content the second approach is no different than the first one. Note that we are using elementFormDefault="qualified" here, as well as attrib
    18 KB (2,309 words) - 14:28, 1 August 2022
  • CO:name (section Notes)
    This element does not appear in railML® 3.2 within the CO subschema. It is available only in railML® 3.1. There exists an element <generic:name> that might
    507 bytes (58 words) - 18:40, 19 December 2019
  • The parents have changed.
    515 bytes (4 words) - 18:41, 19 December 2019
  • The children have changed.
    527 bytes (4 words) - 18:42, 19 December 2019
  • The parents have changed. The attributes have been changed.
    518 bytes (9 words) - 18:41, 19 December 2019
  • This element does not appear in railML® 3.1 within the generic subschema. It is available only in railML® 3.2. There exists an element <CO:external> that
    516 bytes (58 words) - 12:39, 8 February 2024
  • RTM:isValid (section Notes)
    The element documentation has been changed. The parents have changed. The attributes have been changed.
    750 bytes (15 words) - 13:44, 18 April 2024
  • This element does not appear in railML® 3.1 within the IS subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further
    517 bytes (38 words) - 21:50, 25 April 2022
  • IL:hasCommand (section Notes)
    This element does not appear in railML® 3.1 within the IL subschema. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further
    716 bytes (61 words) - 15:10, 14 May 2022
View (previous 50 | ) (20 | 50 | 100 | 250 | 500)