Category:Use case (IS): Difference between revisions
Jump to navigation
Jump to search
(Created page with "Use cases of the infrastructure subschema category:Use case") |
No edit summary |
||
Line 1: | Line 1: | ||
[[dev:Use cases|Use cases]] of the [[infrastructure]] subschema | [[dev:Use cases|Use cases]] of the [[infrastructure]] subschema | ||
[[category:Use | [[category:Use cases]] |
Latest revision as of 18:07, 20 November 2023
Use cases of the infrastructure subschema
Pages in category "Use case (IS)"
The following 25 pages are in this category, out of 25 total.
U
- UC:IS:Asset status representation
- UC:IS:CADForRailwaySignaling
- UC:IS:CapacityPlanning
- UC:IS:CaptureSchematicVisualisationInformationOfTrackAssets
- UC:IS:DriverAdvisorySystem
- UC:IS:ETCS track net
- UC:IS:ExchangeOfLogicalTrainPositions
- UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers
- UC:IS:IntegratedTMS
- UC:IS:MaintenancePlanning
- UC:IS:NetworkStatement
- UC:IS:NREReporting
- UC:IS:PassengerInformationSystem
- UC:IS:PosessionManagement
- UC:IS:PositioningAndMap-Matching
- UC:IS:RailInspectionData
- UC:IS:Railway Simulation Laboratory
- UC:IS:RailwayInfrastructureRecording
- UC:IS:RailwayInfrastructureVisualisation
- UC:IS:RINFReporting
- UC:IS:Schematic Track Plan
- UC:IS:Speeddirectory
- UC:IS:Timetabling
- UC:IS:Track Geometry
- Template:UseCase