Autoexport from the XML-Schema for element TT:commercialConnection of railML® version 3.2 | |
Documentation | Commercial connections describe a unidirectional relationship between trains that can be used by passengers or goods to transfer from one train to another. |
Subschema | timetable |
Parents* | commercialConnections |
Children | connector (1..1), feeder (1..1) |
Attributes:
If maxWaitingTime needs to be extended this Organization should be contacted. (optional;
Specifying a zero here means that the connector does not wait for the feeder. Specifying no maximalWaitingTime means that the source system of the railML does not have that information. (optional;
If no minimalTransferTime is specified here the times defined in the connectionTransferTimes at the root level of the timetable subschema apply. (optional; | |
*Notice: Elements may have different parent elements. As a consequence they may be used in different contexts. Please, consider this as well as a user of this wiki as when developing this documentation further. Aspects that are only relevant with respect to one of several parents should be explained exclusively in the documentation of the respective parent element. |
TT:commercialConnection
Jump to navigation
Jump to search
Introduction
Documentation
Syntax
This element does not appear in railML® 3.1. It is available only in railML® 3.2. Do not hesitate to contact railML.org for further questions.
Changes 3.1→3.2
Introduced with version 3.2