UC:TT:AdoptVehicleWorkingSchedulingToTimetableChanges: Difference between revisions

From railML 3 Wiki
Jump to navigation Jump to search
[unchecked revision][checked revision]
({{mirror}})
(Versionfix)
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{mirror}}
{{UseCase|TT|title=Adopt vehicle working scheduling to timetable changes|CO=1|IS=1|RS=1|reporter=IVU}}
 
{{UC title}}
Adopt vehicle working scheduling to timetable changes; {{Deu|Umlauf an Jahresfahrplan anpassen }}
 
{{UC description}}
The importing system holds timetable and vehicle working data. A change in the timetable shall be imported.
 
{{UC flows}}
The import may be performed manually via a file based interface, or online via a message (SOAP) based interface.
 
{{UC interference}}
* Common
* Infrastructure
* Rolling stock
 
{{UC data}}
 
{{UC update}}
* could be daily
 
{{UC complexity}}
 
* small (single train run)
 
{{UC focus}}
 
* any
 
{{UC elements|TT}}
 
* see _Import complete timetable for vehicle working scheduling_
 
We describe different subtypes of the _adopt to timetable changes_ usecase.
 
'''Change train data (commercial or operational) in a given validity'''
 
Precondition:
* Import data contains commercial train information with valid id and validity.
* System holds data on a train with this id, and the validity of the train covers the validity change request.
 
Execution
* The system splits the train into one with validity of the change request, and one with the remaining validity.
* The changes are applied to the first train, according to the usecase in _Import complete timetable for vehicle working scheduling_.
 
Postcondition
* The train is changed within the validity of the change request, and unchanged outside.
 
'''Change validity of a train'''
 
Precondition:
* Import data contains commercial train information with valid id and validity.
* System holds data on a train with this id
 
Execution:
* The validity of the train is changed.

Latest revision as of 18:11, 27 June 2022

Adopt vehicle working scheduling to timetable changes
Subschema: Timetable and Rostering
 
Related subschemas: IS RS CO
Reported by: IVU
Stift.png (version(s) not yet specified)
For general information on use cases see UC:Use cases


Use case / Anwendungsfall

Adopt vehicle working scheduling to timetable changes; Umlauf an Jahresfahrplan anpassen

Description / Beschreibung

The importing system holds timetable and vehicle working data. A change in the timetable shall be imported.

Data Flows and Interfaces / Datenflüsse und Schnittstellen

The import may be performed manually via a file based interface, or online via a message (SOAP) based interface.

Interference with other railML® schemas / Interferenz mit anderen railML®-Schemen

  • Common
  • Infrastructure
  • Rolling stock

Characterizing Data / Charakterisierung der Daten

How often do the data change (update)?

  • could be daily

How big are the data fragments to be exchanged (complexity)?

  • small (single train run)

Which views are represented by the data (focus)?

  • any

Which specific TT data do you expect to receive/send (elements)?

  • see _Import complete timetable for vehicle working scheduling_

We describe different subtypes of the _adopt to timetable changes_ usecase.

Change train data (commercial or operational) in a given validity

Precondition:

  • Import data contains commercial train information with valid id and validity.
  • System holds data on a train with this id, and the validity of the train covers the validity change request.

Execution

  • The system splits the train into one with validity of the change request, and one with the remaining validity.
  • The changes are applied to the first train, according to the usecase in _Import complete timetable for vehicle working scheduling_.

Postcondition

  • The train is changed within the validity of the change request, and unchanged outside.

Change validity of a train

Precondition:

  • Import data contains commercial train information with valid id and validity.
  • System holds data on a train with this id

Execution:

  • The validity of the train is changed.