Template:UC:UseCases/implemented
Jump to navigation
Jump to search
Return to UC:Use_cases in the railML® 3 wiki/in the railML® 2 wiki
| Legend (↓) | ||||||||||
Directing Subschema |
Involved Subschemas |
Implemented in railML® version (lowest) |
Implemented in railML® version (highest) |
Description (EN) | Description (DE) | Abbreviation | Reported by | Status how to interpret the status |
Edited | |
|---|---|---|---|---|---|---|---|---|---|---|
| IL | IS | 3.1 | 3.3 | Interlocking module engineering data (former: Interlocking engineering) |
Stellwerksprojektierung | IMED | writer: Thales Germany, reviewer: ETCS subgroup of Interlocking working group |
implemented | December 1st 2025 by User:RailML Coord Documentation | |
| IS | – | 3.1 | 3.3 | Network statement of an infrastructure manager[1] | Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers | NEST | writer: Správa železnic (former: SŽDC) / ProRai / Bane NOR, reviewer: NEST working group |
implemented | December 18th 2025 by User:RailML Coord Documentation | |
| IL | IS | 3.1 | 3.3 | Routes for timetable simulation (former: Capacity operational simulation) |
Fahrstrassen für Fahrplansimulation (ehemals: Leistungsfähigkeit Simulation) |
RSIM | writer: Jernbanedirektoratet / Bane NOR (former: Jernbanedirektoratet Capacity Dpt), reviewer: ETCS subgroup of Interlocking working group |
implemented | February 2nd 2026 by User:RailML Coord Documentation | |
| IS | IL | 3.1 | 3.3 | Schematic Track Plan | Schematische Gleisplandarstellung | SCTP | writer: Jernbanedirektoratet / Bane NOR, reviewer: SCTP working group |
implemented | February 2nd 2026 by User:RailML Coord Documentation | |
| TT | IL, IS, RS | 3.2 | 3.3 | Integrated Traffic Management System | Integriertes Verkehrsmanagement | ITMS | writer: Thales Germany; reviewer: TT developer working group |
implemented | February 2nd 2026 by User:RailML Coord Documentation | |
| IS | IL | 3.2 | 3.3 | ETCS track net | ETCS Streckenatlas | ETCS | writer: Thales Germany, reviewer: ETCS subgroup of Interlocking working group |
implemented | October 05th 2025 by User:RailML Coord Documentation | |
| ETCS track net: Input for Detailed Design of ETCS Trackside | ETCS Streckenatlas: Übergabe der allgemeingültigen Streckendateninformationen (vom Netzbetreiber an den Lieferanten) | ETCS-a | writer: Thales Germany, reviewer: ETCS subgroup of Interlocking working group |
implemented | October 05th 2025 by User:RailML Coord Documentation | |||||
| ETCS track net: Output of Detailed Design of ETCS Trackside | ETCS Streckenatlas: Übergabe der Ergebnisdaten der Projektierung (vom Lieferanten an den Netzbetreiber) | ETCS-b | writer: Thales Germany, reviewer: ETCS subgroup of Interlocking working group |
implemented | October 05th 2025 by User:RailML Coord Documentation | |||||
| ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement | ETCS Streckenatlas: Aktualisierung der Streckendaten vor Balisengruppenplatzierung | ETCS-c | writer: Thales Germany, reviewer: ETCS subgroup of Interlocking working group |
implemented | October 05th 2025 by User:RailML Coord Documentation | |||||
| TT | IS, RS | 3.2 | 3.3 | Passenger information at stations | Fahrgastinformation am Bahnhof | PISY | writer: PSI Transcom (May 20th 2015); reviewer: init |
implemented | September 29th 2025 by User:RailML Coord Documentation | |
| TT | IS, RS, IL | 3.3 | 3.3 | Run Time Calculation Input Data | Eingangsdaten für die Fahrzeitrechnung | RTCI | writer: Jernbanedirektoratet / Bane NOR, reviewer: TT developer working group |
implemented | February 2nd 2026 by User:RailML Coord Documentation | |
| Run Time Calculation Input Data – Infrastructure properties | Eingangsdaten für die Fahrzeitrechnung - Infrastruktur Eigenschaften | RTCI-a | writer: Jernbanedirektoratet, reviewer: TT developer working group |
implemented | ||||||
| Run Time Calculation Input Data – Rolling stock properties | Eingangsdaten für die Fahrzeitrechnung - Fahrzeug Eigenschaften | RTCI-b | writer: Jernbanedirektoratet, reviewer: TT developer working group |
implemented | ||||||
| Run Time Calculation Input Data – Timetable properties | Eingangsdaten für die Fahrzeitrechnung - Fahrplan Eigenschaften | RTCI-c | writer: Jernbanedirektoratet, reviewer: TT developer working group |
implemented | ||||||
| TT | IS, RS | 3.3 | 3.3 | Long Term Circulation Planning | Langfristige Umlaufplanung | LTCP | writer: IVU & TT developer working group, reviewer: TT developer working group |
implemented | June 30th 2025 by User:RailML Coord Documentation | |
| IS | TT | 3.3 | 3.3 | Posession Management | Daten für Betra und Gleissperrungen | POMA | writer: Siemens Mobility Germany (January 10th 2022); reviewer: HaCon Ingenieurgesellschaft |
implemented | January 20th 2025 by User:RailML Coord Documentation | |
| Legend: Red: No railML.org e.V. partner so far reviewed this use case. | ||||||||||