Template:UC:UseCases/implemented

From railML 3 Wiki
Jump to navigation Jump to search

Return to UC:Use_cases in the railML® 3 wiki/in the railML® 2 wiki

Legend (↓)
Directing Subschema
Involved Subschemas
Implemented in railML® version
(lowest)
Implemented in railML® version
(highest)
Description (EN) Description (DE) Abbreviation Reported by Status
how to interpret the status
Edited
IL IS 3.1 3.3 Interlocking module engineering data
(former: Interlocking engineering)
Stellwerksprojektierung IMED writer: Thales Germany,
reviewer: ETCS subgroup of Interlocking working group
implemented December 1st 2025 by User:RailML Coord Documentation
IS 3.1 3.3 Network statement of an infrastructure manager[1] Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers NEST writer: Správa železnic (former: SŽDC) / ProRai / Bane NOR,
reviewer: NEST working group
implemented December 18th 2025 by User:RailML Coord Documentation
IL IS 3.1 3.3 Routes for timetable simulation
(former: Capacity operational simulation)
Fahrstrassen für Fahrplansimulation
(ehemals: Leistungsfähigkeit Simulation)
RSIM writer: Jernbanedirektoratet / Bane NOR
(former: Jernbanedirektoratet Capacity Dpt),
reviewer: ETCS subgroup of Interlocking working group
implemented February 2nd 2026 by User:RailML Coord Documentation
IS IL 3.1 3.3 Schematic Track Plan Schematische Gleisplandarstellung SCTP writer: Jernbanedirektoratet / Bane NOR,
reviewer: SCTP working group
implemented February 2nd 2026 by User:RailML Coord Documentation
TT IL, IS, RS 3.2 3.3 Integrated Traffic Management System Integriertes Verkehrsmanagement ITMS writer: Thales Germany;
reviewer: TT developer working group
implemented February 2nd 2026 by User:RailML Coord Documentation
IS IL 3.2 3.3 ETCS track net ETCS Streckenatlas ETCS writer: Thales Germany,
reviewer: ETCS subgroup of Interlocking working group
implemented October 05th 2025 by User:RailML Coord Documentation
ETCS track net: Input for Detailed Design of ETCS Trackside ETCS Streckenatlas: Übergabe der allgemeingültigen Streckendateninformationen (vom Netzbetreiber an den Lieferanten) ETCS-a writer: Thales Germany,
reviewer: ETCS subgroup of Interlocking working group
implemented October 05th 2025 by User:RailML Coord Documentation
ETCS track net: Output of Detailed Design of ETCS Trackside ETCS Streckenatlas: Übergabe der Ergebnisdaten der Projektierung (vom Lieferanten an den Netzbetreiber) ETCS-b writer: Thales Germany,
reviewer: ETCS subgroup of Interlocking working group
implemented October 05th 2025 by User:RailML Coord Documentation
ETCS track net: Alignment on Topology and Properties of Trackside Equipment Before ETCS Balise Placement ETCS Streckenatlas: Aktualisierung der Streckendaten vor Balisengruppenplatzierung ETCS-c writer: Thales Germany,
reviewer: ETCS subgroup of Interlocking working group
implemented October 05th 2025 by User:RailML Coord Documentation
TT IS, RS 3.2 3.3 Passenger information at stations Fahrgastinformation am Bahnhof PISY writer: PSI Transcom (May 20th 2015);
reviewer: init
implemented September 29th 2025 by User:RailML Coord Documentation
TT IS, RS, IL 3.3 3.3 Run Time Calculation Input Data Eingangsdaten für die Fahrzeitrechnung RTCI writer: Jernbanedirektoratet / Bane NOR,
reviewer: TT developer working group
implemented February 2nd 2026 by User:RailML Coord Documentation
Run Time Calculation Input Data – Infrastructure properties Eingangsdaten für die Fahrzeitrechnung - Infrastruktur Eigenschaften RTCI-a writer: Jernbanedirektoratet,
reviewer: TT developer working group
implemented
Run Time Calculation Input Data – Rolling stock properties Eingangsdaten für die Fahrzeitrechnung - Fahrzeug Eigenschaften RTCI-b writer: Jernbanedirektoratet,
reviewer: TT developer working group
implemented
Run Time Calculation Input Data – Timetable properties Eingangsdaten für die Fahrzeitrechnung - Fahrplan Eigenschaften RTCI-c writer: Jernbanedirektoratet,
reviewer: TT developer working group
implemented
TT IS, RS 3.3 3.3 Long Term Circulation Planning Langfristige Umlaufplanung LTCP writer: IVU & TT developer working group,
reviewer: TT developer working group
implemented June 30th 2025 by User:RailML Coord Documentation
IS TT 3.3 3.3 Posession Management Daten für Betra und Gleissperrungen POMA writer: Siemens Mobility Germany (January 10th 2022);
reviewer: HaCon Ingenieurgesellschaft
implemented January 20th 2025 by User:RailML Coord Documentation
Legend:

Red: No railML.org e.V. partner so far reviewed this use case.
Green: Review was performed by the railML.org e.V. partner given in the table.
Priority: "X" means that work is finished, but Use case will be updated when needed by the community. "1" is the highest priority.
Status: How to interpret the status