Template:UC:Use cases/table: Difference between revisions

From railML 3 Wiki
Jump to navigation Jump to search
[unchecked revision][unchecked revision]
(Set abbreviation for long term strategic timetabling)
(+Last edit)
Line 1: Line 1:
{| class="wikitable sortable"
{| class="wikitable sortable"
|-
|-
! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(lowest)</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(highest)</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! style="width:15%"|Description (FR) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[UC:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span>
! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(lowest)</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version<br />(highest)</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! style="width:15%"|Description (FR) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[UC:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span> !! Edited
|-
|-
|IL
|IL
Line 9: Line 9:
|X
|X
| [[UC:IL:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated
| [[UC:IL:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated
|{{edited|UC:IL:Simulation}}
|-
|-
|IL
|IL
Line 15: Line 16:
|3.2
|3.2
| X || [[UC:IL:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[UC:IL:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[UC:IL:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated
| X || [[UC:IL:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[UC:IL:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[UC:IL:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated
|{{edited|UC:IL:InterlockingEngineering}}
|-
|-
|IS
|IS
Line 27: Line 29:
|JBD/BaneNOR
|JBD/BaneNOR
|consolidated
|consolidated
|{{edited|UC:IS:Schematic Track Plan}}
|-
|-
|IS
|IS
Line 39: Line 42:
|SNCF Réseau
|SNCF Réseau
|merged into [[#NEST|NEST]]
|merged into [[#NEST|NEST]]
|{{edited|UC:IS:RINFReporting}}
|-
|-
|{{anchor|NEST}}IS
|{{anchor|NEST}}IS
Line 51: Line 55:
|SŽDC/&#8203;ProRail/&#8203;BaneNOR
|SŽDC/&#8203;ProRail/&#8203;BaneNOR
|consolidated
|consolidated
|{{edited|UC:IS:NetworkStatement}}
|-
|-
|TT
|TT
Line 63: Line 68:
|<font color="green">writer: PSI (20.05.15)</font color>; <font color="green">reviewer: Init</font color>
|<font color="green">writer: PSI (20.05.15)</font color>; <font color="green">reviewer: Init</font color>
|consolidated
|consolidated
|{{edited|UC:TT:PassengerInformationAtStations}}
|-
|-
|IS
|IS
Line 75: Line 81:
|Bombardier
|Bombardier
|draft
|draft
|{{edited|UC:IS:IntegratedTMS}}
|-
|-
|TT
|TT
Line 87: Line 94:
|<font color="red">writer: Thales</font color>; <font color="red">reviewer: ???</font color>
|<font color="red">writer: Thales</font color>; <font color="red">reviewer: ???</font color>
|draft
|draft
|{{edited|UC:TT:TrafficManagementPlan}}
|-
|-
|IS
|IS
Line 99: Line 107:
|
|
|draft
|draft
|{{edited|UC:IS:PassengerInformationSystem}}
|-
|-
|IS
|IS
Line 111: Line 120:
|ÖBB Infrastruktur
|ÖBB Infrastruktur
|review
|review
|{{edited|UC:IS:Track Geometry}}
|-
|-
|IS
|IS
Line 123: Line 133:
|IS
|IS
|draft
|draft
|{{edited|UC:IS:DriverAdvisorySystem}}
|-
|-
|IS
|IS
Line 135: Line 146:
|Bahnkonzept
|Bahnkonzept
|draft
|draft
|{{edited|UC:IS:RailwayInfrastructureRecording}}
|-
|-
|IS
|IS
Line 147: Line 159:
|
|
|draft
|draft
|{{edited|UC:IS:PositioningAndMap-Matching}}
|-
|-
|IS
|IS
Line 159: Line 172:
|DLR for IN2Rail project
|DLR for IN2Rail project
|draft
|draft
|{{edited|UC:IS:Asset status representation}}
|-
|-
|IS
|IS
Line 171: Line 185:
|IS
|IS
|draft
|draft
|{{edited|UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers}}
|-
|-
|IL
|IL
Line 177: Line 192:
|
|
| 4 || [[UC:IL:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}||  || || draft
| 4 || [[UC:IL:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}||  || || draft
|{{edited|UC:IL:OperationAndControl}}
|-
|-
|IS
|IS
Line 189: Line 205:
|
|
|draft
|draft
|{{edited|UC:IS:MaintenancePlanning}}
|-
|-
|IL
|IL
Line 195: Line 212:
|
|
| 4 || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
| 4 || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
|{{edited|UC:IL:InterlockEngineeringForSignallingWithinJBV}}
|-
|-
|IL
|IL
Line 201: Line 219:
|
|
| 5 || [[UC:IL:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft
| 5 || [[UC:IL:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft
|{{edited|UC:IL:SitePreparationDataForSignalControlledWarningSystems}}
|-
|-
|IL
|IL
Line 207: Line 226:
|
|
| 6 || [[UC:IL:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft
| 6 || [[UC:IL:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft
|{{edited|UC:IL:HardwareAndCablePlan}}
|-
|-
|IS
|IS
Line 219: Line 239:
|JBV/BaneNOR
|JBV/BaneNOR
|draft
|draft
|{{edited|UC:IS:CapacityPlanning}}
|-
|-
|IS
|IS
Line 231: Line 252:
|ÖBB Infrastruktur
|ÖBB Infrastruktur
|draft
|draft
|{{edited|UC:IS:NREReporting}}
|-
|-
|IS
|IS
Line 243: Line 265:
|ÖBB Infrastruktur
|ÖBB Infrastruktur
|draft
|draft
|{{edited|UC:IS:Speeddirectory}}
|-
|-
|IS
|IS
Line 255: Line 278:
|ProRail
|ProRail
|draft
|draft
|{{edited|UC:IS:Timetabling}}
|-
|-
|IS
|IS
Line 267: Line 291:
|RailComplete
|RailComplete
|draft
|draft
|{{edited|UC:IS:CADForRailwaySignaling}}
|-
|-
|IS
|IS
Line 279: Line 304:
|
|
|draft
|draft
|{{edited|UC:IS:CaptureSchematicVisualisationInformationOfTrackAssets}}
|-
|-
|IS
|IS
Line 291: Line 317:
|ČVUT
|ČVUT
|draft
|draft
|{{edited|UC:IS:Railway Simulation Laboratory}}
|-
|-
|IS
|IS
Line 303: Line 330:
|
|
|outdated
|outdated
|{{edited|UC:IS:RailwayInfrastructureVisualisation}}
|-
|-
|IS
|IS
Line 315: Line 343:
|Thales
|Thales
|draft
|draft
|{{edited|UC:IS:ETCS track net}}
|-
|-
|RS
|RS
Line 327: Line 356:
|
|
|
|
|{{edited|UC:RS:TractionPowerSupplySimulation}}
|-
|-
|RS
|RS
Line 339: Line 369:
|
|
|
|
|{{edited|UC:RS:OperationalSimulation}}
|-
|-
|TT
|TT
Line 351: Line 382:
|<font color="green">writer: ÖBB Personenverkehr; <br/>reviewer: INIT</font color>
|<font color="green">writer: ÖBB Personenverkehr; <br/>reviewer: INIT</font color>
|consolidated
|consolidated
|{{edited|UC:TT:DutyShiftsPersonnelRoster}}
|-
|-
|TT
|TT
Line 363: Line 395:
|<font color="green">writer: HaCon (13.03.15)</font color>; <font color="green">reviewer: IVU</font color>
|<font color="green">writer: HaCon (13.03.15)</font color>; <font color="green">reviewer: IVU</font color>
|consolidated, <i>under revision</i>
|consolidated, <i>under revision</i>
|{{edited|UC:TT:TimetableInformation}}
|-
|-
|TT
|TT
Line 375: Line 408:
|<font color="green">writer: iRFP (21.05.15)</font color>; <font color="green">reviewer: IVU (22.09.16)</font color>
|<font color="green">writer: iRFP (21.05.15)</font color>; <font color="green">reviewer: IVU (22.09.16)</font color>
|consolidated
|consolidated
|{{edited|UC:TT:ATimetableForACompetition}}
|-
|-
|TT
|TT
Line 387: Line 421:
|<font color="green">writer: IVU (20.05.15)</font color>; <font color="red">reviewer: iRFP</font color>
|<font color="green">writer: IVU (20.05.15)</font color>; <font color="red">reviewer: iRFP</font color>
|draft
|draft
|{{edited|UC:TT:ImportCompleteTimetableForVehicleWorkingSchedulingAndVehicleWorkings}}
|-
|-
|TT
|TT
Line 399: Line 434:
|<font color="green">writer: IVU (21.05.15) </font color>; <font color="green">reviewer: HaCon</font color>
|<font color="green">writer: IVU (21.05.15) </font color>; <font color="green">reviewer: HaCon</font color>
|consolidated
|consolidated
|{{edited|UC:TT:AdoptVehicleWorkingSchedulingToTimetableChanges}}
|-
|-
|TT
|TT
Line 411: Line 447:
|<font color="green">writer: iRFP (21.05.15)</font color>; <font color="green">reviewer: IVU (22.09.16)</font color>
|<font color="green">writer: iRFP (21.05.15)</font color>; <font color="green">reviewer: IVU (22.09.16)</font color>
|consolidated
|consolidated
|{{edited|UC:TT:ExchangeOfFormationData}}
|-
|-
|TT
|TT
Line 423: Line 460:
|<font color="green">writer: ERA</font color>; <font color="red">reviewer: Bahnkonzept</font color>
|<font color="green">writer: ERA</font color>; <font color="red">reviewer: Bahnkonzept</font color>
|draft
|draft
|{{edited|UC:TT:TAF/TAP TSI}}
|-
|-
|TT
|TT
Line 435: Line 473:
|<font color="green">writer: SMA (22.12.16)</font color>; <font color="green">reviewer: HaCon (28.06.22)</font color>
|<font color="green">writer: SMA (22.12.16)</font color>; <font color="green">reviewer: HaCon (28.06.22)</font color>
|consolidated
|consolidated
|{{edited|UC:TT:LongTermStrategicTimetabling}}
|-
|-
|TT
|TT
Line 447: Line 486:
|<font color="green">writer: SMA (17.09.16)</font color>; <font color="red">reviewer: iRFP</font color>
|<font color="green">writer: SMA (17.09.16)</font color>; <font color="red">reviewer: iRFP</font color>
|draft
|draft
|{{edited|UC:TT:SlotOrdering}}
|-
|-
|TT
|TT
Line 459: Line 499:
|<font color="green">writer: Interautomation (17.01.17)</font color>; <font color="red">reviewer: PSI and iRFP</font color>
|<font color="green">writer: Interautomation (17.01.17)</font color>; <font color="red">reviewer: PSI and iRFP</font color>
|draft
|draft
|{{edited|UC:TT:FGIInTrain}}
|-
|-
|IS
|IS
Line 471: Line 512:
|<font color="green">writer: Siemens Switzerland</font color>; <font color="red">reviewer: ???</font color>
|<font color="green">writer: Siemens Switzerland</font color>; <font color="red">reviewer: ???</font color>
|draft
|draft
|{{edited|UC:IS:ExchangeOfLogicalTrainPositions}}
|-
|-
|IS
|IS
Line 483: Line 525:
|<font color="green">writer: Siemens Germany (10.01.22)</font color>; <font color="red">reviewer: HaCon</font color>
|<font color="green">writer: Siemens Germany (10.01.22)</font color>; <font color="red">reviewer: HaCon</font color>
|draft
|draft
|{{edited|UC:IS:PosessionManagement}}
|}{{interwiki}}
|}{{interwiki}}

Revision as of 17:30, 15 September 2022

Directing Subschema
Involved Subschemas
Implemented in railML® version
(lowest)
Implemented in railML® version
(highest)
Priority
Description (EN) Description (DE) Description (FR)
Abbreviation
Reported by Status
how to interpret the status
Edited
IL IS 3.1 3.2 X Routes for timetable simulation
(former: Capacity operational simulation)
Fahrstrassen für Fahrplan simulieren
(ehemals: Leistungsfähigkeit Simulation)
RSIM Jernbanedirektoratet/BaneNOR
(erstwhile: Jernbanedirektoratet Capacity Dpt)
consolidated December 07th 2023 by User:RailML Orga Ontology
IL 3.1 3.2 X Interlocking module engineering data
(former: Interlocking engineering)
Stellwerksprojektierung [[UC:IL:InterlockingEngineering|]] IMED Thales Germany consolidated March 13th 2023 by User:RailML Coord Documentation
IS 3.1 3.2 X Schematic Track Plan Schematische Gleisplandarstellung SCTP JBD/BaneNOR consolidated February 13th 2023 by User:RailML Orga Ontology
IS 3.1 3.2 X RINF Reporting RINF Meldung RINR SNCF Réseau merged into NEST March 13th 2023 by User:RailML Coord Documentation
IS 3.1 3.2 X Network statement of an infrastructure manager Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers NEST SŽDC/​ProRail/​BaneNOR consolidated April 12th 2024 by User:RailML Orga Ontology
TT 3.2 3.2 X Passenger information at stations Fahrgastinformation am Bahnhof writer: PSI (20.05.15); reviewer: Init consolidated March 13th 2023 by User:RailML Coord Documentation
IS TT, IL 3.2 3.2 X Integrated TMS Integriertes Verkehrsmanagement ITMS Bombardier draft February 13th 2023 by User:RailML Orga Ontology
TT IL, IS, RS 3.2 3.2 X Traffic Management Plan writer: Thales; reviewer: ??? draft June 27th 2022 by User:RailML Coord Documentation
IS 2 Passenger Information System Fahrgast-Informationssystem PISY draft March 13th 2023 by User:RailML Coord Documentation
IS 2 Track Geometry Gleisgeometrie TRGE ÖBB Infrastruktur review April 15th 2024 by User:RailML Coord Documentation
IS TT 2 Driver Advisory System (DAS) Fahrerassistenzsystem DASY IS draft March 13th 2023 by User:RailML Coord Documentation
IS 2 Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC Bahnkonzept draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Positioning and Map-Matching Positionierung und Kartenvergleich POSI draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Asset status representation Darstellung des Infrastrukturzustands ASSR DLR for IN2Rail project draft September 27th 2023 by User:RailML Orga Ontology
IS 3 Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Her­stel­lern ISIL IS draft March 13th 2023 by User:RailML Coord Documentation
IL 4 Operation and Control Betriebsführung draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Maintenance Planning Wartungsplanung MAPL draft March 13th 2023 by User:RailML Coord Documentation
IL 4 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung [[UC:IL:InterlockEngineeringForSignallingWithinJBV|]] Jernbaneverket Signalling Dpt draft March 13th 2023 by User:RailML Coord Documentation
IL 5 Site preparation data for Signal Controlled Warning Systems Daten zur Standortvorbereitung für Rottenwarnsysteme SCWS Thales Austria draft March 13th 2023 by User:RailML Coord Documentation
IL 6 Hardware and cable plan Aussenanlage und Kabelplan draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Capacity Planning Kapazitätsplanung CAPL JBV/BaneNOR draft March 13th 2023 by User:RailML Coord Documentation
IS 3 NRE Reporting NRE Meldung NRER ÖBB Infrastruktur draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED ÖBB Infrastruktur draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Timetabling Fahrplanerstellung ISTT ProRail draft March 13th 2023 by User:RailML Coord Documentation
IS 3 CAD for railway signaling CAD für Zugsignalisierung CASP RailComplete draft December 07th 2023 by User:RailML Orga Ontology
IS 3 Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen draft March 13th 2023 by User:RailML Coord Documentation
IS 3 Railway Simulation Laboratory Eisenbahnbetriebslabor RLAB ČVUT draft June 27th 2022 by User:RailML Coord Documentation
IS 9 Railway Infrastructure Visualisation Visualisierung von Schieneninfrastruktur ISVI outdated March 13th 2023 by User:RailML Coord Documentation
IS IL 3.2 3.2 X ETCS track net ETCS Thales draft June 12th 2023 by User:RailML Coord Infrastructure
RS Traction power supply simulation Simulation der Bahnstromversorgung March 13th 2023 by User:RailML Coord Documentation
RS Operational simulation Betriebssimulation March 13th 2023 by User:RailML Coord Documentation
TT RS, IS Duty planning and staff shifts Dienstplanung und Personalschichten SHFT writer: ÖBB Personenverkehr;
reviewer: INIT
consolidated July 18th 2022 by User:RailML Coord Documentation
TT Timetable Information Fahrplanauskunft TINF writer: HaCon (13.03.15); reviewer: IVU consolidated, under revision March 13th 2023 by User:RailML Coord Documentation
TT A timetable for a competition (call for proposals) Ausschreibungsfahrplan writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated March 13th 2023 by User:RailML Coord Documentation
TT Import complete timetable for vehicle working scheduling and vehicle workings Umlaufbildung Fahrzeuge Jahresfahrplan writer: IVU (20.05.15); reviewer: iRFP draft June 27th 2022 by User:RailML Coord Documentation
TT Adopt vehicle working scheduling to timetable changes Umlauf an Jahresfahrplan anpassen writer: IVU (21.05.15) ; reviewer: HaCon consolidated June 27th 2022 by User:RailML Coord Documentation
TT Exchange of formation data Austausch von Wagenreihungen/ Behängungsdaten writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated March 13th 2023 by User:RailML Coord Documentation
TT TAF/TAP TSI requirements TAF/TAP TSI Anforderungen writer: ERA; reviewer: Bahnkonzept draft December 07th 2023 by User:RailML Coord Timetable
TT Long Term Strategic Timetabling Langfrist-Fahrplanerstellung LTST writer: SMA (22.12.16); reviewer: HaCon (28.06.22) consolidated July 18th 2022 by User:RailML Coord Timetable
TT Slot ordering Trassenbestellung writer: SMA (17.09.16); reviewer: iRFP draft March 13th 2023 by User:RailML Coord Documentation
TT Passenger information inside the train Fahrgastinformation im Zug writer: Interautomation (17.01.17); reviewer: PSI and iRFP draft June 27th 2022 by User:RailML Coord Documentation
IS IL, RS, TT Exchange of Logical Train Positions writer: Siemens Switzerland; reviewer: ??? draft July 18th 2022 by User:RailML Coord Documentation
IS Posession Management Daten für Betra und Gleissperrungen POMA writer: Siemens Germany (10.01.22); reviewer: HaCon draft July 18th 2022 by User:RailML Coord Documentation