UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers: Difference between revisions
Jump to navigation
Jump to search
[unchecked revision] | [checked revision] |
({{mirror}}) |
(-fra) |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{useCase|IS|title=Exchange of planning parameters for interlocking with suppliers|IL=1|reporter=IS}} | ||
{{UC title}} | |||
Exchange of planning parameters for interlocking with suppliers; {{Deu|Austausch von Planungsparametern für Stellwerke mit Anbietern}} | |||
{{UC description}} | |||
All the planning parameters, which are necessary to build an interlocking (hard- and software), have to be given to the supplier. The content of the data exchange is the result of the planning process, so the data are provided by a specialized planning tool (e.g. ProSig). | |||
Further usages for inventory queries are possible. | |||
[[file:Interlocking use case.png|800px|Interlocking use case.png]] | |||
{{UC flows}} | |||
Import into planning tool: geo data, existing planning data, inventory data | |||
Export of planning tool: planning data, handing-over to the supplier (by using a database). | |||
{{UC interference}} | |||
* interlocking (see also: [[IS:UC:InterlockingEngineering |Interlocking Engineering]]) | |||
{{UC data}} | |||
This section serves to specify the required data regarding certain aspects. | |||
Complete content of a planning for an interlocking: | |||
<ul> | |||
<li> Topology and geometry of the track network (2-dimensional) with punctual information about height and superelevation | |||
<li> Parameters and position of hardware elements (signals, switches etc.) | |||
<ul> <li> Positioning for track-related elements based on topology | |||
<li> Positioning for other elements based on coordinates </ul> | |||
<li> Parameters of software elements (routes, flank protection for switches etc.) </ul> | |||
{{UC update}} | |||
* yearly | |||
* monthly | |||
* weekly | |||
* daily | |||
{{UC complexity}} | |||
* very small (element) | |||
* small (operational point) | |||
* big (station/yard) | |||
* huge (region) | |||
* whole data set (network) | |||
{{UC focus}} | |||
* Signaling | |||
* Geometry | |||
* Construction | |||
* Statistics | |||
* Energy | |||
* Topology | |||
{{UC elements|IS}} | |||
<ul> | |||
<li> Topology of the track network | |||
<ul> <li> Nodes, edges | |||
<li> Inner topology: connections between edges or marker at edges for correct routing at switches </ul> | |||
<li> Geometry of the track network and lines | |||
<ul> <li> Nodes, edges | |||
<li> For edges: length, radius/curvature | |||
<li> Additional: punctual information about height and superelevation </ul> | |||
<li> Infrastructure elements, e. g. | |||
<ul> <li> Platforms and platform edges: <i>position, height, length, identifier for user (e.g. “Bahnsteig A”)</i> | |||
<li> Signals: <i>name, position, effective direction, type, operational function, signaling system, construction details (e. g. height, fundament type, height of light point, diffusion disc), functional details (e g. passing non-stop allowed, clearance of overlap), energy and information supply</i> | |||
<li> Switches: <i>e. g. name, type, basic form, isolation, kind of switch signal, operation mode, priority position, radius and possible speed per leg, kind of point machine(s), energy and information supply</i> | |||
<li> Level crossings: <i>name, position, construction details, functional details, energy and information supply</i> | |||
<li> Elements of automatic train control: <i>position, construction details, functional details, energy and information supply</i> | |||
<li> Key locks or lock combination: <i>name, position, energy and information supply</i> | |||
<li> Bridges, tunnels: <i>position, length along the topology</i></ul> | |||
</ul> | |||
{{interwiki}} |
Latest revision as of 13:47, 13 March 2023
Exchange of planning parameters for interlocking with suppliers Subschema: Infrastructure Related subschemas: IL Reported by: IS | ||
| ||
For general information on use cases see UC:Use cases |
Use case / Anwendungsfall
Exchange of planning parameters for interlocking with suppliers; Austausch von Planungsparametern für Stellwerke mit Anbietern
Description / Beschreibung
All the planning parameters, which are necessary to build an interlocking (hard- and software), have to be given to the supplier. The content of the data exchange is the result of the planning process, so the data are provided by a specialized planning tool (e.g. ProSig). Further usages for inventory queries are possible.
Data Flows and Interfaces / Datenflüsse und Schnittstellen
Import into planning tool: geo data, existing planning data, inventory data Export of planning tool: planning data, handing-over to the supplier (by using a database).
Interference with other railML® schemas / Interferenz mit anderen railML®-Schemen
- interlocking (see also: Interlocking Engineering)
Characterizing Data / Charakterisierung der Daten
This section serves to specify the required data regarding certain aspects.
Complete content of a planning for an interlocking:
- Topology and geometry of the track network (2-dimensional) with punctual information about height and superelevation
- Parameters and position of hardware elements (signals, switches etc.)
- Positioning for track-related elements based on topology
- Positioning for other elements based on coordinates
- Parameters of software elements (routes, flank protection for switches etc.)
How often do the data change (update)?
- yearly
- monthly
- weekly
- daily
How big are the data fragments to be exchanged (complexity)?
- very small (element)
- small (operational point)
- big (station/yard)
- huge (region)
- whole data set (network)
Which views are represented by the data (focus)?
- Signaling
- Geometry
- Construction
- Statistics
- Energy
- Topology
Which specific IS data do you expect to receive/send (elements)?
- Topology of the track network
- Nodes, edges
- Inner topology: connections between edges or marker at edges for correct routing at switches
- Geometry of the track network and lines
- Nodes, edges
- For edges: length, radius/curvature
- Additional: punctual information about height and superelevation
- Infrastructure elements, e. g.
- Platforms and platform edges: position, height, length, identifier for user (e.g. “Bahnsteig A”)
- Signals: name, position, effective direction, type, operational function, signaling system, construction details (e. g. height, fundament type, height of light point, diffusion disc), functional details (e g. passing non-stop allowed, clearance of overlap), energy and information supply
- Switches: e. g. name, type, basic form, isolation, kind of switch signal, operation mode, priority position, radius and possible speed per leg, kind of point machine(s), energy and information supply
- Level crossings: name, position, construction details, functional details, energy and information supply
- Elements of automatic train control: position, construction details, functional details, energy and information supply
- Key locks or lock combination: name, position, energy and information supply
- Bridges, tunnels: position, length along the topology