UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers: Difference between revisions

From railML 3 Wiki
Jump to navigation Jump to search
[unchecked revision][unchecked revision]
No edit summary
 
({{mirror}})
Line 1: Line 1:
{{useCase|IS|2.3|title=Exchange of planning parameters for interlocking with suppliers|IL=1|reporter=IS}}
{{mirror}}
 
{{UC title}}
Exchange of planning parameters for interlocking with suppliers; {{Deu|Austausch von Planungsparametern für Stellwerke mit Anbietern}}; {{Fra|nom descriptif en Francais}}
 
{{UC description}}
All the planning parameters, which are necessary to build an interlocking (hard- and software), have to be given to the supplier. The content of the data exchange is the result of the planning process, so the data are provided by a specialized planning tool (e.g. ProSig).
Further usages for inventory queries are possible.
 
[[file:Interlocking use case.png|800px|Interlocking use case.png]]
{{UC flows}}
Import into planning tool: geo data, existing planning data, inventory data
Export of planning tool: planning data, handing-over to the supplier (by using a database).
 
{{UC interference}}
* interlocking (see also: [[IS:UC:InterlockingEngineering |Interlocking Engineering]])
 
{{UC data}}
This section serves to specify the required data regarding certain aspects.
 
Complete content of a planning for an interlocking:
<ul>
  <li> Topology and geometry of the track network (2-dimensional) with punctual information about height and superelevation
  <li> Parameters and position of hardware elements (signals, switches etc.)
  <ul> <li> Positioning for track-related elements based on topology
      <li> Positioning for other elements based on coordinates </ul>
  <li> Parameters of software elements (routes, flank protection for switches etc.) </ul>
 
{{UC update}}
* yearly
* monthly
* weekly
* daily
 
{{UC complexity}}
* very small (element)
* small (operational point)
* big (station/yard)
* huge (region)
* whole data set (network)
 
{{UC focus}}
* Signaling
* Geometry
* Construction
* Statistics
* Energy
* Topology
 
{{UC elements|IS}}
<ul>
<li> Topology of the track network
<ul> <li> Nodes, edges
      <li> Inner topology: connections between edges or marker at edges for correct routing at switches </ul>
<li> Geometry of the track network and lines
<ul> <li> Nodes, edges
      <li> For edges: length, radius/curvature
      <li> Additional: punctual information about height and superelevation </ul>
<li> Infrastructure elements, e. g.
<ul> <li> Platforms and platform edges: <i>position, height, length, identifier for user (e.g. “Bahnsteig A”)</i>
      <li> Signals: <i>name, position, effective direction, type, operational function, signaling system, construction details (e.  g. height, fundament type, height of light point, diffusion disc), functional details (e  g. passing non-stop allowed, clearance of overlap), energy and information supply</i>
      <li> Switches: <i>e. g. name, type, basic form, isolation, kind of switch signal, operation mode, priority position, radius and possible speed per leg, kind of point machine(s), energy and information supply</i>
      <li> Level crossings: <i>name, position, construction details, functional details, energy and information supply</i>
      <li> Elements of automatic train control: <i>position, construction details, functional details, energy and information supply</i>
      <li> Key locks or lock combination: <i>name, position, energy and information supply</i>
      <li> Bridges, tunnels: <i>position, length along the topology</i></ul>
</ul>

Revision as of 17:49, 24 November 2019

🗒️ This page is mirrored from page UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers in The railML® 2 wiki.  

Template loop detected: Template:Mirror