| {{UseCase|IL|3.1|title=Hardware and cable plan}} | | {{mirror}} |
| | |
| {{UC title}}
| |
| Hardware and cable plan; {{Deu|Hardware und Kabelplan}}; {{Fra|nom descriptif en Francais}}
| |
| | |
| {{UC description}}
| |
| * Cable plan
| |
| * Parts Lists
| |
| * Number of field element controller
| |
| * Hardware indoor, outdoor (number of point machines, number of axle counters, number of signals, …)
| |
| * Network components (router, switches, cable)
| |
| * Power supply
| |
| * Technical room, number of CPU boards, Container
| |
| | |
| {{UC flows}}
| |
| Information Category:
| |
| * Topology (origin: railML IS schema or classic track plan)
| |
| * Cable plan (origin: railML IS schema or classic track plan)
| |
| | |
| {{UC interference}}
| |
| * infrastructure
| |
| | |
| {{UC data}}
| |
| This section serves to specify the required data regarding certain aspects.
| |
| | |
| {{UC update}}
| |
| * static (not changing) on demand
| |
| | |
| {{UC complexity}}
| |
| * big (station/yard)
| |
| | |
| {{UC focus}}
| |
| * Energy
| |
| * Construction
| |
| | |
| {{UC elements|IL}}
| |
| * Number of elements (signals, distant signals, repeater, supplementary signals, point machines, Track vacancy detection ( axle counter)…..)
| |
| * Position of elements
| |
| * Block interface to foreign IXL
| |
| * Level crossing
| |
| * Tunnel gates
| |
| * Bascule bridges
| |
| * Slide detector
| |