Search results

Jump to navigation Jump to search
  • for utilization in other railway applications. Infrastructure data provided by the recording system include information about railway topology, track elements
    3 KB (335 words) - 12:48, 13 March 2023
  • follow our UC guideline. Generally speaking, contributions to railML® and this wiki are appreciated. For contributing use cases, please follow our UC guideline
    7 KB (287 words) - 14:21, 15 January 2024
  • version (highest) Priority Description (EN) Description (DE) Abbreviation Reported by Status how to interpret the status Edited IL IS 3.1 3.2 X Interlocking
    18 KB (0 words) - 10:43, 27 March 2024