Search results

Jump to navigation Jump to search
Results 1 – 4 of 4
Advanced search

Search in namespaces:

  • process of the LTP yearly timetable. It is typically produced more than two years in advance of operation (VLTP), and may be used for purposes including: infrastructure
    4 KB (523 words) - 11:14, 18 July 2022
  • formations) Long term planning (starting typically 1..5 years in future with a duration of typically 3..15 years) Used elements (extract - more is allowed): *1
    16 KB (1,903 words) - 13:27, 13 March 2023
  • component Name String Bridge Construction date Date Bridge Design life Integer (years) Bridge Span length 1 per span, Decimal (m) Deck slab, pier, tower Number
    10 KB (129 words) - 16:01, 27 September 2023
  • Infrastructure Manager. Terms and Expressions VLTP =very long term planning (>2 years) LTP = long term planning: the yearly timetable(s) STP = short term planning:
    2 KB (273 words) - 13:26, 13 March 2023