Search results
Jump to navigation
Jump to search
- RTM:anchor (section Notes)System> is usually used to represent mileages of a railway lines. Please note that mileages can also be referred as “chainages” in the national regulations3 KB (269 words) - 17:11, 19 April 2024
- an endDate that is the base of the enclosing bitmask. It is important to note that the weekPatterns provided here are not the leading information in terms3 KB (5 words) - 15:55, 8 February 2024
- IS:crossesElement (section Notes)[openStreetMap]. river: linear flow of larger natural waterways, in flow direction. Note that the linear ways should form a complete routable description of the watercourse7 KB (15 words) - 10:54, 13 May 2024
- transports the passengers or the freight to the connection point. Please note that a connection from an external train to an external train is not permitted606 bytes (5 words) - 17:41, 15 January 2024
- transports the passengers or the freight from the connection point onward. Please note that a connection from an external train to an external train is not permitted624 bytes (5 words) - 17:41, 15 January 2024
- the necessary steps and the requirements in general. It is important to note, to which railML® versions a use case or certain aspects of it apply, as7 KB (1,035 words) - 17:27, 5 February 2024
- TT:activityTripDependency (section Notes)wait for another train to arrive at a certain location before departing. Note that in order for this dependency to apply the validity of the enclosing525 bytes (38 words) - 21:55, 25 April 2022
- TT:activityCrewDependency (section Notes)another train variant for the purpose of receiving the other trains crew. Note that in order for this dependency to apply the validity of the enclosing525 bytes (38 words) - 21:55, 25 April 2022
- another route. Automatikfahrstrasse in German, trace automatique in French. Note that this functionality is often part of the control system in which case3 KB (5 words) - 14:22, 24 January 2020
- indicates that data can be used for the purpose of configuring ETCS systems. Note that the Eulynx project, with whom railML cooperates, defines data in terms11 KB (828 words) - 13:25, 13 March 2023
- section from the website and start contributing to the railML Wiki. Please note that the system will automatically switch to the Wiki page for editing. If11 KB (1,424 words) - 18:13, 15 April 2024
- Generic:designator (section Notes)This element does not appear in railML® 3.1 within the generic subschema. It is available only in railML® 3.2. There exists an element <CO:designator>518 bytes (58 words) - 12:39, 8 February 2024
- another route. Automatikfahrstrasse in German, trace automatique in French. Note that this functionality is often part of the control system in which case4 KB (5 words) - 12:42, 8 February 2024
- Generic:name (section Notes)This element does not appear in railML® 3.1 within the generic subschema. It is available only in railML® 3.2. There exists an element <CO:name> that might512 bytes (58 words) - 12:39, 8 February 2024
- CO:designator (section Notes)This element does not appear in railML® 3.2 within the CO subschema. It is available only in railML® 3.1. There exists an element <generic:designator>1 KB (156 words) - 17:49, 24 January 2022
- planners to estimate the influence of slow throwing switches on train traffic. Note that this excludes controller (OCS) processing time and communication between4 KB (5 words) - 14:21, 24 January 2020
- planners to estimate the influence of slow throwing switches on train traffic. Note that this excludes controller (OCS) processing time and communication between4 KB (5 words) - 14:21, 24 January 2020
- planners to estimate the influence of slow throwing switches on train traffic. Note that this excludes controller (OCS) processing time and communication between4 KB (5 words) - 14:21, 24 January 2020
- [openStreetMap]. river: linear flow of larger natural waterways, in flow direction. Note that the linear ways should form a complete routable description of the watercourse4 KB (5 words) - 12:40, 8 February 2024
- railML® 2 ticket system and the railML® 3 ticket system respectively. Please note that 2023-04-24 Common was split into Common and Generic due to technical10 KB (1,041 words) - 10:56, 2 May 2024