IS:phaseSeparationSection/3.2: Difference between revisions

From railML 3 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
(Created page IS:phaseSeparationSection/3.2 using XSD2MediaWiki Converter 1.0.6)
 
(Updated page IS:phaseSeparationSection/3.2 using XSD2MediaWiki Converter 1.1.1)
 
Line 8: Line 8:
|parent={{parent|subschema=IS|name=electrificationSection}}
|parent={{parent|subschema=IS|name=electrificationSection}}
|attributes={{attribut|name=lengthPhaseSeparation|pflicht=0|typ=xs:decimal|documentation=length of the phase separation section in contact line, in [m]}},
|attributes={{attribut|name=lengthPhaseSeparation|pflicht=0|typ=xs:decimal|documentation=length of the phase separation section in contact line, in [m]}},
{{attribut|name=switchOffBreaker|pflicht=0|typ=xs:boolean|documentation=flag, whether the main circuit breaker has to be switched off when passing the phase separation}},
{{attribut|name=lowerPantograph|pflicht=0|typ=xs:boolean|documentation=flag, whether the pantographs have to be lowered when passing the phase separation}},
{{attribut|name=lowerPantograph|pflicht=0|typ=xs:boolean|documentation=flag, whether the pantographs have to be lowered when passing the phase separation}}
{{attribut|name=switchOffBreaker|pflicht=0|typ=xs:boolean|documentation=flag, whether the main circuit breaker has to be switched off when passing the phase separation}}
}}
}}

Latest revision as of 12:40, 8 February 2024

Automatic Schemaexport for Element phaseSeparationSection

Autoexport from the XML-Schema for element IS:phaseSeparationSection of railML® version 3.2
Documentation child element summarizing the phase separation parameters
Subschema infrastructure
Parents* electrificationSection
Children None
Attributes:
  • lengthPhaseSeparation: length of the phase separation section in contact line, in [m] (optional; xs:decimal),

  • lowerPantograph: flag, whether the pantographs have to be lowered when passing the phase separation (optional; xs:boolean),

  • switchOffBreaker: flag, whether the main circuit breaker has to be switched off when passing the phase separation (optional; xs:boolean)
*Notice:
Elements may have different parent elements. As a consequence they may be used in different contexts.
Please, consider this as well as a user of this wiki as when developing this documentation further.
Aspects that are only relevant with respect to one of several parents should be explained exclusively in the documentation of the respective parent element.